Northlake 635(3)-LR 980424CONCRETE COMPR e'X SIVE STRENGTH Date of Service: 04/16/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Services: SLUMP: AIR: TEST METHOD: 9809887 43-2452- Coppell Belt Lin~ Coppell, Obtain samples of fresh concrete at the placement locations, perform requin compressive strength samples.** CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 10 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 7-P.5, 7-P, 1-Q CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 514 AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers, Building C PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DAWZ: 04/16/1998 TIME SAMPLED: 1 '45 pm BY: B Cloudy, 1 70 F c( TICKE' UNI REPORT OF TESTS MAXIMUM AGE LOAD (days) Obs. force) 7 117250 7 119410 Average 6.50 04/23/1998 6.50 04/23/1998 97 1 3 6.50 05/14/1998 1 4 6.50 05/14/1998 Note: Samples taken directly from truck. Technician time on report 9809886. 28 28 Started: Finished: Technician: Brian Otis Report Distribution: (1) Lincoln Property Company (1) Buffer Construction (1) O'Brien & Associates (1) AECC, Inc. (1) City ofCoppell/Bldg. [nsp. (1) City of Coppell/Constr. Insp. (1) Mullen & Powell Technistructures This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the w~ AO 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/24/1998 lusiness Center II Rd. & Lakeshore Dr. texas field test and cast BATCH TIME: 12:54 pm 5an Otis nild INCRETE: 75 F NO: N/A WEmtrr (pc0: N/A 2UMULATIVE YARDS: 10 2OMPRESSIVE STRENGTH (psi) 4150 4220 4190 Engin~ iugene Harbour Vice President ten approval of HBC Engineering, Inc. 01AK Page 1 of 1 CONCRETE COMPRf SIVE STRENGTH Date of Service: Client No.: Client: 04/16/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: Project No.: 43-2452 Project: Coppell Belt Lin Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE, SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5*' N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Panel 120 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT OATE.' 04/16/1998 TIME SAMPLED: 7:00 am BY: ]~ WEATHER CONDITIONS: Partly cl, TEMPERATUKE(F)-AIR 55 F C TRUCK NO: 1884 TiCK~ AIR CONTENT (%): N/A UN~ PLACEMENT LOCATION: Building C, Panels 117, 1 lg, 119, 120, 121, 1: CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (Ib~. force) 1 1 5.25 04/23/1998 7 1 ! 0190 ! 2 5.25 04/23/!998 7 109240 Average 1 3 5.25 05/14/1998 28 1 4 5.25 05/14/1998 28 AC This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri 01AK Page 1 of 3 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/24/1998 -97 Business Center H .~ Rd. & Lakeshore Dr. Texas field test and cast BATCHTIME: 6:45 am ddie Elrod )udy, cool )NCRETE: 65 F TNO: 702431 T WEIG~IT C~e0: N/A ',2, 123, 124, 3, 4, 6, 7, 8 CUMULATIVE YARDS: 60 ~OMPRESSIVE STRENGTH (psi) 3900 3860 3880 ~n approval of HBC Engineering, Inc. CONCRETE COMPRESSIVE STRENGTH TEb £ Date of Service: 04/16/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 980988( 43-2452 Coppell Belt Lin Coppell: Services: Obtain samples of fresh concrete at the placement locations, perform requn compressive strength samples.** SLUMP: AIR: TEST METHOD: CON~tAC'rOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Panel 4 CYLINDER MARKED SET NO. PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 04/16/1998 TIME SAMPLED: 8:45 am BY: WEATHER CONDITIONS: Partly TEMPERATURE (F) - AIR 60 TRUCK NO: 1884 Am CONTENT (%): N/A PLACEMENT LOCATION: See page i REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 2 1 4.75 04/23/1998 7 102140 2 2 4.75 04/23/1998 7 106630 Average 2 3 4.75 05/14/1998 28 2 4 4.75 05/14/1998 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the a 01AK Page 2 of 3 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Dnte 04/24/1998 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 8:05 am ;ddie Elrod oudy, cool F .£ ONCRETE: 70 F TICm',T NO: 702441 t~ ~r WEIGtrr (p~0: N/A A( :CUMULATIVE YARDS: 160 COMPRESSIVE STRENGTH (ps0 3610 3770 3690 FRACTURE TYPE itten approval of HBC Engineering, Inc. CONCRETE COMPR " SIVE STRENGTH TEL] Date of Service: 04/16/1998 Report No.: 9809880 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project No.: 43-2452. Project: Coppell i Belt Lira Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir, compressive strength samples.** 8901 Carpenter Frwy., Suite #100 Dalla& Texas 75247 97 Report Date 04/24/1998 3usiness Center II : Rd. & Lakeshore Dr. Texas field test and cast SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Panel 7 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 3 1 5.00 3 2 5.00 3 3 5.00 3 4 5.00 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 04/16/1998 TIME SAMPLED: 9:30 am BY: E WEATHER CONDITIONS: Cloudy TEMPERATURE (F) - AIR 65 F o TRUCK NO: 514 TICKE AIR CONTENT (%): N/A UNI PLACEMENT LOCATION: See page I REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) Obs. force) 04/23/1998 7 118100 04/23/1998 7 113700 Average 05/14/1998 28 05/14/1998 28 A( BATCHTIME: 9:13 am :Idle Eh'od )NCRETE: 72 NO: 702447 WEIGHT (pcf): N/A :CUMULATIVE YARDS: 220 20MPRESSIVE STRENGTH (psi) 4180 4020 4100 TYPE Technician: Eddie Elrod Report Distribution: (1) Lincoln Property Company (1) Butler Construction (1) O'Bricn & Associates (1) AECC, loc. Started: 5:00 am Finished: 11:00 I~ ( 1 ) City of Coppell/BIdg. Insp. (1) City of Coppell/Constr. Insp. (1) Mullen & Powell Tochnistructures This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the va Engine~ iugene Harb~ur Vice President ten approval of HBC Engineering, Inc. 01AK Page 3 of 3 'CONCRETE COMPPd'" SIVE STRENGTH· Date of Service: 03/26/1998 Report No.: 9808190 Client No.: 52617000 Project No.: 43-2452. Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 Nor~ Akard Street Dallas TX 75201-3394 Coppell Belt Lin, Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete rLANT: 27 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 03/26/1998 TIME SAMPLED: 4:30 am BY: C WEATHERCONDrrlONS: Partly cl~ TEMPERATURE (~) - AIR 66 F c mUCK NO: 652 TIC~ AIR CONTENT (%): N/A UNI PLACEMENT LOCATION: Building B slab-on-grade between lines A,I-C SAMPLE LOCATION: C.2/1.5 CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 1 1 5.00 04/02/1998 7 97470 1 2 5.00 04/02/1998 7 92730 Average 1 3 5.00 04/23/1998 28 134390 1 4 5.00 04/23/1998 28 138040 Average AC This report is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without the w~ 01AK Page 1 of 6 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/24/1998 .97 Business Center II ; Rd. & Lakeshore Dr. Texas field test and cast BATCII TIME: N/A harlie Shurtleff )udy 3NCRETE: 73 F NO: 664711 WEIGHT (pcf): N/A ,5 & 1.1-10.9 CUMULATIVE YARDS: 40 COMPRESSIVE STRENGTH (psi) 3450 3280 3370 4750 4880 4820 tten approval of HBC Engineering, Inc. "CONCRETE COMP1L SIVE STRENGTH Date of Service: 03/26/1998 Report No.: 9808190 Client No.: 52617000 Project No.: 43-2452. Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppell Belt Lira Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 27 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 3-5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 03/26/1998 TIME SAMPLED: 5:30 am BY: C WEATHER CONDITIONS: Cloudy TEMPERATURE (g) - AIR 66 TRUCK NO: 546 TICK~ AIR CONTENT (%): N/A UNI PLACEMENT LOCATION: Sec page ! SAMPLE LOCATION: B.5/2.8 REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) Obs. force) 2 1 6.00* 04/02/1998 7 80740 2 2 6.00* 04/02/1998 7 92440 Average 2 3 6.00* 04/23/1998 28 122580 2 4 6.00* 04/23/1998 28 119380 Average * Note: No water added at jobsite. Contractor and subcontractor no This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the wri 01AK Page 2 of 6 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 ,97 Report Date 04/24/1998 Business Center II : Rd. & Lakeshore Dr. Texas :d field test and cast BATCH TIME: 4:20 am harlie Shurtleff )NCR~r~: 74 F NO: 664718 wmawr (pc0: N/A :CUMULATIVE YARDS: 110 EOMPRESS~E STRENGTH ~si) 2860 3270 3070 4330 4220 4280 :ified. tten approval of HBC Engineering, Inc. CONCRETE COMP SIVE STRENGTH TE?F Date of Service: 03/26/1998 Report No.: 980819( Client No.: 52617000 Project No.: 43-2452 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell Belt Lin Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requn compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete rLANT: 27 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 3-5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: -9349 PLACEMENT DATE: 03/26/1998 TIME SAMPLED: 6:45 am BY: WEATHER CONDITIONS: Cloudy TEMPERATURE (F) - AIR 67 F TRUCK NO: 407 TICK] AIR CONTENT (%): N/A UN PLACEMENT LOCATION: See page ! SAMPLE LOCATION: A.5/4.2 CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 3 1 7.00' 04/02/1998 7 81230 3 2 7.00' 04/02/1998 7 85380 Average 3 3 7.00' 04/23/1998 28 120600 3 4 7.00' 04/23/1998 28 122440 Average * Note: See page 2 A( This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without thc ~ 01AK Page 3 of 6 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 .97 Report Date 04/24/1998 Business Center H e Rd. & Lakeshore Dr. Texas field test and cast BATCH 'rIME: N/A ~harlie Shurtleff ONCRETE: 74 F ',T NO: 664727 rr WEIGHT (pcO: N/A :CUMULATIVE YARDS: 200 COMPRESSIVE STRENGTH (psi) 2870 3020 2950 4260 4330 4300 TYPE [tten approval of HBC Engineering, Inc. 'CONCRETE COMPRESSIVE STRENGTH Date of Service: 03/26/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Mgon 500 North Akard Street Dallas TX 75201-3394 Report No.: 9808190 Project No.: 43-2452. Project: Coppell Belt Lin Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 27 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days. 3-5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 03/26/1998 TIME SAMPLED: 7:45 am BY: C WEATHER CONDITIONS: · RUCK NO: 1803 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page I Cloudy 69 l~ o TICKE UNI SAMPLE LOCATION: C/5.6 CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inch.) TESTED (days) 0b~. force) 4 1 6.00' 04/02/1998 7 109230 4 2 6.00' 04/02/1998 7 100360 Average 4 3 6.00* 04/23/1998 28 144640 4 4 6.00* 04/23/1998 28 147650 Average * Note: See page 2 AC This report is exclusively for the un of the client indicated above and shall not be reproduced except in full without the wri 01AK Page 4 of 6 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/24/1998 97 3usiness Center II ',Rd. & Lakeshore Dr. Texas field test and cast BATCHTIME: 7:10 am harlie Shurtleff )NCRETE: 76 F r NO: 664741 r WEIGItT (per): N/A 2UMULATIVE YARDS: 310 2OMPRF_~IVE STRENGTH (psi) 3860 3550 3710 5120 5220 5170 TYPE approval of HBC Eng~eering, Inc. 'CONCRETE COMPR "' SIVE STRENGTH Date of Service: 03/26/1998 Report Bio.: 9808190 Client No.: 52617000 Project No.: 43-2452. Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppell Belt Lim Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 27 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 3-5" N/A ASTM C-143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT OATE: 03/26/1998 TIME SAMPLED: 9:55 am BY: (~ WEATHER CONDITIONS: Cloudy, TEMPERATURE (1~ - AIR 76 F C TRUCK NO: 545 TICK~ AIR CONTENT (%): N/A UN] PLACEMENT LOCATION: See page I SAMPLE LOCATION: 6/B CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 5 1 7.25* 04/02/1998 7 112510 5 2 7.25 * 04/02/1998 7 106580 Average 5 3 7.25* 04/23/1998 28 148150 5 4 7.25 * 04/23/1998 28 150740 Average * Note: No water added. AC This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wr 01AK Page S of 6 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/24/1998 .97 Business Center H ; Rd. & Lakeshore Dr. Texas field test and cast BATCHTIME: 9:15 am harlie Shurtleff ~ery windy ~)NCRETE: 69 F rNO: 658761 T WEIGHT (PcO: N/A CUMULATIVE YARDS: 420 COMPRF~$1VE STRENGTH ~si) 3980 3770 3880 5240 5330 5290 ttcn approval of HBC Engineering, Inc. -CONCRETE COMPRr'3SIVE STRENGTH TE , · Date of Service: 03/26/1998 Report No.: 9808191~ Client No.: 52617000 Project No.: 43-2452. Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppell Belt Lin, Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLAWr: 27 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 3-5" N/A ASTM C-143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 03/26/1998 TIME SAMPLED: 12:35 pm BY: (2 WEATHER CONDITIONS: Cloudy, TEMPERATURE (F)- AIR 76 F C TRUCK NO: 648 TICKE AIR CONTENT (%): N/A UN] PLACEMENT LOCATION: See page 1 SAMPLE LOCATION: 9.5/A.5 CYLINDER MARKED SET NO. MEASURED SLUMP DATE (inches) TESTED 6 1 7.00* 04/02/1998 6 2 7.00* 04/02/1998 6 3 7.00* 04/23/1998 6 4 7.00* 04/23/1998 * Note: No water added. Additional technician: Brian Otis 9:00 am REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 7 111100 7 109120 Average 28 144260 28 141970 Average to 2:30 pm AC Technldan: Charlie Shurtleff Report Distribution: (I) Lincoln Property Company (1) Butler Construction (1) O'Brien & Associates (1) AECC, Inc. Started: 3:00 am Finished: 9:00 am ( I ) City of Coppell/BIdg. lnsp. (I) City of Coppell/Constr. lnsp. (I) Mullcn & Powell TechnisUuctures This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/24/1998 .97 Business Center II ~' Rd. & Lakeshore Dr. Texas field test and cast BATCIITIME: 11:30 am harlie Shurtleff ~ery windy )NCRETE: 71 F r NO: 658787 T WEIG~rr (pc0: N/A CUMULATIVE YARDS: 590 COMPRESSIVE STRENGTH ~si) 3930 386O 3900 5100 5020 5060 TYPE gene t-m~our ice President written approval of HBC Engineering, Inc. 01AK Page 6 of 6