Northlake 635(3)-LR 980427CONCRETE COMPI SIVE STRENGTH TEo 1' Date of Service: 03/25/1998 Report No.: 980809~. Client No.: 52617000 Project No.: 43-245~ Client: Lincoln Property Company Project: Coppell 3300 Lincoln Plaza/Larry Moon Belt Lit 500 North Akard Street Dallas TX 75201-3394 Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi~ compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 27 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 5" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 3349 PLACEMENT DATE: 03/25/1998 TIME SAMPLED: 4:15 am BY: WEATHER CONDITIONS: Partly TEMPERATURE (F) - AIR 64 TRUCK NO: N/A TICK] AIR CONTENT (%): N/A o~ PLACEMENT LOCATION: Building C slab, I-Q, 3-5 SAMPLE LOCATION: 4.5, 1.5 CYLINDER MARKED SET NO. REPORT OF TESTS MEASURE~) MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 1 1 5.00 04/01/1998 7 108640 I 2 5.00 04/01/1998 7 113650 Average 1 3 5.00 04/22/1998 28 125690 1 4 5.00 04/22/1998 28 123140 Average A~ This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the ~ 01AK Page I of 5 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 -97 Report Date 04/27/1998 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: N/A iddie Elrod oudy, cool ONCRETE: 70 F :T NO: N/A iT WEIGHT (0c0: N/A 2CUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH (psi) 3840 4020 3930 ' 4440 4350 4400 FRACTURE TYPE Hen approval of HBC Engineering, Inc. t-CONCRETE COMPI 'SSIVE STRENGTH TE , £ Date of Service: 03/25/1998 Report No.: 9808095 Client No.: 52617000 Project No.: 43-2452 Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppell Belt Lin Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requit compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 27 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" 3-6% ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 3349 PLACEMENT DATE: 03/25/1998 TIME SAMPLED: 6:45 am BY: WEATHER CONDITIONS: Partly TEMPERATURE (F) - AIR 64 TRUCK NO: 749 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page I SAMPLE LOCATION: 4.K CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (Ib~ force) 2 1 5.00 04/01/1998 7 119110 2 2 5.00 04/01/1998 7 116760 Average 2 3 5.00 04/22/1998 28 135340 2 4 5.00 04/22/1998 28 137250 Average This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the v 01AK Page 2 of 5 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/27/1998 -97 Business Center II ~ Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: N/A ddie Eirod ~udy, cool F CONCRETE: · 68 g TIC~a~T NO: 664670 UN IT WEIGHT (pc0: N/A A( :CUMULATIVE YARDS: 260 COMPRESSIVE STRENGTH (psi) 4210 4130 4170 4790 4850 4820 FRACTURE TYPE itten approval of HBC Engineering, Inc. CONCRETE COMPRr SIVE STRENGTH TEe r Date of Service: 03/25/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 980809'. Project No.: 43-2452 Project: Coppell Belt Lin Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi~ compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 27 SPECllqCATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" 3-6% ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 3349 PLACEMENT DATE: 03/25/1998 TIME SAMPLED: 8:00 am BY: WEATHER CONDITIONS: Partly TEMPERATURE (F) - AIR 66 TRUCK NO: 749 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page I SAMPLE LOCATION: 4.7, M CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 3 1 7.00 04/01/1998 7 100060 3 2 7.00 04/01/1998 7 101490 Average 3 3 7.00 04/22/1998 28 131870 3 4 7.00 04/22/1998 28 136600 Average This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wr 01AK Page 3 of 5 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/27/1998 .97 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: N/A ;ddie Elrod oudy, cool F £ ONCRETE: 70 F TlCm:T NO: 664685 UN FT WEIGHT (pc0: N/A A{ iCUMULATIVE YARDS: 360 COMPRESSIVE STRENGTH (psi) 3540 3590 3570 4660 4830 4750 FRACTURE TYPE tten approval of HBC Engineering, inc. CONCRETE COMPI SIVE STRENGTH r Date of Service: 03/25/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 980809 Project No.: 43-245; Project: Coppell Belt Lin Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requil compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 27 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 3349 PLACEMENT DATE: 03/25/1998 TIME SAMPLED: 9:45 am BY: [: WEATHER CONDITIONS: Partly cl TEMPERATURE (F) - AIR 70 F c TRUCK NO: 803 TICK[ AIR CONTENT (%): N/A UN~ PLACEMENT LOCATION: See page 1 SAMPLE LOCATION: 4.5, N.2 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 4 I 5.25 04/01/1998 4 2 5.25 04/01/1998 4 3 5.25 04/22/1998 4 4 5.25 04/22/1998 REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 7 114100 7 112510 Average 28 129690 28 129990 Average AC This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri~ 0 I.A.K Page 4 of 5 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/27/1998 .97 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 9:07 am ddie Elrod ~udy, cool DNCRETE: 72 F TNO: 664701 T WEIGHT (per): N/A CUMULATIVE YARDS: 450 UOMPRESSIVE STRENGTH (psi) 4030 3980 4010 4590 4600 4600 FRACTURE TYPE ten approval of HBC Engineering, Inc. "CONCRETE COMPRe"gSIVE STRENGTH TE"' Date of Service: 03/25/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 980809'. Project No.: 43-2452 Project: Coppell Belt Lin Coppell, Services: Obtain samples of fresh concrete at the placement IDeations, perform requil compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 27 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 DaYs 5" 3-6% ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 3349 PLACEMENT DATE: 03/25/1998 TIME SAMPLED: 11:10 am BY: ]: WEATHER CONDITIONS: Partly cl TEMPERATURE (F) - AIR 72 F C TRUCK NO: 549 TICK[ AIR CONTENT (%): N/A UN PLACEMENT LOCATION: See page I SAMPLE LOCATION: 4, 0.5 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 5 1 5.00 5 2 5.00 5 3 5.00 5 4 5.00 REPORT OF TESTS DATE TESTED 04/01/1998 04/01/1998 MAXIMUM AGE LOAD (days) (lbs. force) 7 129760 7 123260 Average 28 166390 28 167330 Average 04/22/1998 04/22/1998 A£ Technician: Eddie Elrod Report Distribution: (1) Lincoln Property Company ( I ) Butler Construction ( I ) O'Brien & Associates (1) AECC, Inc. Started: 3:00 am Finished: 1:00 pm ~ (1) City ofCoppell/Bldg. Insp. (I) City ofCoppell/Constr. Insp. (1) Mullen & Powell Technistmctures This report is exclusively Ibr the use of the client indicated above and shall not be reproduced except in full without the wr 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/27/1998 ,97 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and east BATCH TIME: 10:10 am .ddie Elrod ~udy, cool DNCRETE: 80 F TNO: 651168 TI' WEIGHT (pc0: N/A CUMULATIVE YARDS: 500 COMPRESSIVE STRENGTH (psi) 4590 4360 4480 5880 5920 5900 FRACTURE TYPE · Engin~r~Ine. ~ugene Harbour Vice President ten approval of HBC Engineering, Inc. 01AK Page 5 of 5 CONCRETE COMPR._ SIVE STRENGTH TEb f Date of Service: 04/17/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 9810002 43-2452 Coppell Belt Lin. Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C- t 43 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 04/17/1998 TIME SAMPLED: 7:00 am BY: l~ WEATHER CONDITIONS: Clear, m TEMPERATURE (F) - AIR 54 F C~ TRUCK NO: 842 TICKE AIR CONTENT (%): N/A UNI PLACEMENT LOCATION: Panels 9, 10, 20-37, 43, 44 SAMPLE LOCATION: Panel 21 REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 1 1 4.50 04/24/1998 7 113670 1 2 4.50 04/24/1998 7 117750 Average 1 3 4.50 05/15/1998 28 1 4 4.50 05/15/1998 28 AC Note: Contractor controlled water. 30 to 50 gallons of water was a~ load. Concrete was batched on site. All samples taken from truck. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/27/1998 .97 Business Center II ', Rd. & Lakeshore Dr. Texas ~d field test and cast BATCH TIME: 6:38 am rian Otis Id )NCRETE: 74 V r NO: N/A T WEIGHT (pc0: N/A CUMULATIVE YARDS: ~OMPRESSIVE STRENGTH (psi) 4020 4160 4090 70 FRACTURE TYPE ided to each ten approval of HBC Engineering, Inc. 01AK Page I of 3 CONCRETE COMPI "3SIVE STRENGTH TE , £ Date of Service: 04/17/1998 Report No.: 9810002 Client No.: 52617000 Project No.: 43-2452 Client: Lincoln Property Company Project: Coppell 3300 Lincoln Plaza/Larry Moon Belt Lin 500 North Akard Street Dallas TX 75201-3394 Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requix compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 04/17/1998 TIME SAMPLED: 8:48 am BY: ]~ WEATHER CONDITIONS: Clear, m TEMPERATURE (F)- AIR 56 F C TRUCK NO: 857 TICK[ AIR CONTENT (%): N/A uN PLACEMENT LOCATION: Sec page 1 SAMPLE LOCATION: Panel 26 REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE . SET NO. (inches) TESTED 2 1 8.00* 04/24/1998 2 2 8.00* 04/24/1998 MAXIMUM AGE LOAD (days) (lbs. force) 7 84400 7 85430 Average 2 3 8.00* 05/15/1998 28 2 4 8.00* 05/15/1998 28 A£ * Note: See page 1. 50 gallons of water added to this load. This repoR is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri 01AK Page 2 of 3 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 -97 Report Date 04/27/1998 Business Center II ~ Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 7:49 am .rian Otis ild DNCRETE: 74 F NO: N/A WEIGHT (pc0: N/A CUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 2980 3020 3000 160 FRACTURE TYPE ~ten approval of HBC Engineering, Inc. CONCRETE COMPR? SIVE STRENGTH TE ,; Date of Service: 04/17/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 9810002 43-2452. Coppeil Belt Lira Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DAT~: 04/17/1998 TIME SAMPLED: 10:55 am BY: B WEATHER CONDITIONS: Clear, m: TEMPERATURE (F) - AIR 55 F O TRUCK NO: 842 TICKE AIR CONTENT (%): N/A UN! PLACEMENT LOCATION: See page I SAMPLE LOCATION: Panel 35 CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (Iba. force) 3 I 7.00' 04/24/1998 7 101720 3 2 7.00* 04/24/1998 7 99620 Average 3 3 7.00* 05/15/1998 28 3 4 7.00* 05/15/1998 28 AC * Note: See page 1. 40 gallons of water added to this load. Technician time on report 9810003. ¸97 ENGINEERING, INC. 8901 Carpenter ['rwy., Suite #100 Dallas, Texas 75247 Report Date 04/27/1998 [lusiness Center II ~ Rd. & Lakeshore Dr. Texas ~d field test and cast BATCHTIME: 10:00 am rian Otis ld )NCRETE: 75 F NO: N/A WEIGHT (pc0: N/A 2UMULATIVE YARDS: 2OMPRESSIVE STRENGTH (psi) 3600 3520 3560 280 FRACTURE TYPE Technician: Brian Otis Report Distribution: (1) Lincoln Property Company (I) Butler Construction (I) O'Brien & Associates (I) AECC, Inc. Started: Finished: (1) City ofCoppell/Bldg. Insp. (1) City of Coppell/Constr. lnsp. (I) Mullen & Po~vell Technistructures e iugene Harbour Vice President This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wi ten approval of HBC Engineering, Inc. 01AK Page 3 of 3 CONCRETE COMPRC'3SIVE STRENGTH Date of Service: 04/17/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Services: 981000~ 43-2452 Coppell Belt Lin Coppell, Obtain samples of fresh concrete at the placement locations, perform requit compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 04/17/1998 TIME SAMPLED: 11:30 am BY: 1~ WEATHER CONDITIONS: Clear, m TEMPERATURE (F}-AIR 56 F C TRUCK NO: 855 TICKl~ AIR CONTENT (%): N/A UN~ PLACEMENT LOCATION: Piers, Building A SAMPLE LOCATION: l I-A, l I-D, ! l-D.5 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 1 7.00 04/24/1998 1 2 7.00 04/24/1998 I 3 7.00 05/15/1998 1 4 7.00 05/15/1998 REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 7 104650 7 102730 Average 28 28 AC Technician time on report 9810003. Technician: Brian Otis Report Distribution: (1) Lincoln Property Company (1) Butler Construction (1) O'Brien & Associates (I) AECC, inc. Started: Finished: I~ (1) City ofCoppell/BIdg, lnsp. (I) City of Coppell/Constr. Insp. (l) Mullen & Powell Technistructures This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the wr 01AK Page I of I ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/27/1998 -97 Business Center II ~ Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 10:50 am rian Otis ~ld 3NCRETE: .75 F r NO: N/A T WEIGHT (pc0: N/A CUMULATIVE YARDS: UOMPRESSIVE STRENGTH (psi) 3700 3630 3670 10 FRACTURE TYPE Engine. igene ~arbour Vice President ten approval of HBC Engineering, Inc. REPORT OF DRILLE?" PIER INSPECTION Date of Service: Client No.: Client: Services: 04/16/1998 52617000 Lincol, Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Drilled pier inspection. On this date, an HBC jobsite as scheduled recorded data. Engineering technician arrived at for drilled pier inspection. See Technician Time: Technician: Brian Otis Report Distribution: (I) Lincoln Property Company (I) Butler Construction ( I ) O'Brien & Associates (1) AECC, Inc. 6:00am to 5:00pm (I) City of Coppeli/Bldg. Insp. (I) City of Coppell/Constr. lnsp. (I) Mullen & Powell Technistmctures Report No.: 9809886 Project No.: 43-2452-! Project: Coppeli 1~ Belt Line Coppell, the above refe attached sheet Pm Sell This report is exclusively lbr the use of the client indicated above and shall not be reproduced except in full without the writ~ ~7 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/27/1998 usiness Center II Rd. & Lakeshore Dr. ?exas fenced for ior Project Engineer en approval of HBC Engineering, Inc. 99MP Page 1 of I REPORT OF DRILLED BELLED PIERS ENGINEERING, RqC. 8901 Carpenter Fnvy, Suite #I00 Dallas, Texas 75247 Project: Project No.: Coppell Busin6ss Center II-Building iCC Coppell, Texas 43-2452-97 Report No.: Date of Service: Technician: Page: 9809886 04/16/1998 B. Otis 1 of 2 Pier Identification Pier Diameter (in.) Bell Diameter (in.) Top of Pier Elevation (ft) Req. Depth From Exist. Grade (ft) Initial Depth of Pier From Existing Grade (fi) Final Depth of Pier From Existing Grade (ft) Depth From Top of Concrete (ft) Condition of Bottom (wet or dry) Plumb Within Tolerance (yes or no) Casing Diameter (in) Cased Depth (ft) Number of Vertical Bars (ea.) Reinforcing Bar Size (#) Length of Vertical Bars (ft.) Time Drilling Was Completed Time Concrete Was Placed 6-A.1 18 36.0 95.5 12.0 12,0 12.1 8.1 DRY YES N/A N/A 6 6 10:15 AM 04:27 PM 7-A.5 24 72.0 6.9-B i 7-B 18 i 24 36.0 i 54.O 7-B.5 24 60.0 7-C 24 66.0 7-H.6 : 7-1 7-1.5 18 24 ; 18 36.0 72.0 36.0 94.0 96.0 ] 93.5 11.8 12.0 12.0 12.0 12,0 12.0 DRY YES N/A N/A 6 6 10:13 AM 04:18 PM DRY DRY YES YES N/A N/A N/A N/A 6 6 6 6 95.0 95.0 12.0 12.0 13.8 14.9 14.0 15.0 12.0 13.0 DRY DRY YES N/A N/A 6 YES N/A N/A 6 6 95.0 12.0 12.0 12.0 11,0 DRY YES N/A N/A 95._0 95.0 12.0 12.0 13.7 12,0 14.0 13.0 DRY YES N/A N/A 12.0 11.0 DRY YES N/A 18 24 36.0 72.0 95.0 93.5 12.0 12.0 12.0 15.0 12.0 15.0 10.0 13.5 DRY DRY YES YES N/A N/A N/A N/A 4 6 6 6 09:40 AM 04:10 PM 9 10:04 AM 03:50 PM 12 08:35 AM 03:38 PM 13 08:18 AM 03:30 PM 10:30 AM 02:49 PM 08:08 AM 02:42 PM 11 , 10 13 08:15 AM 08:45 AM 07:33 AM 02:30 PM 01:48 PM 01:40 PM REPORT OF DRILLED BELLED PIERS Project: Project No.: Coppell Business Center II-Building #C Coppell, Texas 43-2452-97 Report No.: Date of Service: Technician: Page: 89OI Carpenter Frwy., Suite #100 Dallas, Texas 75247 9809886 04/16/1998 B. Otis 2 of 2 Pier Identification Pier Diameter (in.) Bell Diameter (in.) Top of P_ !e_r. Elevati~o~_ (fi) . 6-Q 1-Q 24 24 54.0 60.0 96.5 95.0 Req. Depth From Exist. Grade (ft) Initial Depth of Pier From Existing Grade (ft) Final Depth of Pier From Existing Grade (ft) Depth From Top of Concrete (ft) Condition of Bottom (wet or dry) Plumb Within Tolerance (yes or no) Casing Diameter (in) Cased Depth (ft) Number of Vertical Bars (ea.) Reinforcing Bar Size (#) Length of Vertical Bars (ft.) Time Drilling Was Completed Time Concrete Was Placed 12.0 12.0 14.0 12.0 14.3 12.0 12.7 DRY YES 11.0 DRY YES N/A N/A N/A N/A 6 07:45 AM 01:00 PM 11 10:41 AM 01:15 PM