Loading...
Northlake 635(3)-LR 980429REPORT OF DRILLEi 3ELLED PIER INSPE IO Date of Service: 04/15/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 9809788 Project No.: 43-2452-~ Project: Coppell B Belt Line Coppell, Sell'ices: Drilled belled pier inspection. On this date, an HBC Engineering technician arrived at the above refe: jobsite as scheduled for drilled belled pier inspection. See attache( recorded data.' NOTE: Required depth was adjusted as necessary for water table. Technician Time: 6:00am to 4:30pm Technlcbtn: C,-~ol~e Baxter Repor~ Distribution: (1) Lincx~ln l%~p~ty C~mpmy (1) Butla' ~m (1) A~CC, mc. O) C~y ~ co~l~ asp. O) C~ty ,~ copp~a/c.~,~, asp. (1) Mullm & ?owdl T~h-l-mctur~ 8901 Carpenter Frwy. Suite #100 Dabs, Texas TS247 Report Date 04/29/1998 ~siness Cerger 11 ~d. & Lakeshore Dr. :enced sheets for H~C E~ng, Inc. Pau This report is em:i~vdy for ~he us~ (fthe client h~cated above md m'"ll not bo repro4'~a~ ~ h ~ ~ ~ ~ ~ 99MP Page 1 of 1 [ D. Smith, P.E. )r Project Engineex REPORT OF DRILLED BELLED PIERS 8901 Carl)eater Freq., Suite #100 Dallas, Texas 75247 Project: Project No.: Coppell Business Center II Coppell, Texas 43-2452-97 Report No.: Date of Service: Technician: Page: 9809788 04/15/1998 G. Baxter 1 of 2 Pier Identification Pier Diameter (in.) Bell Diameter (in.) Top of Pier Elevation (ft) Req. Depth From Exist. Grade (ft) Initial Depth of Pier From Existing Grade (fi) Final Depth of Pier From Existing Grade (ft) Depth'From Top of Concrete (ft) Condition of Bottom (wet or dry) Plumb Within Tolerance (yes or no) Casing Diameter (in) Cased Depth (fi) of Vertical Bars Reinforcing Bar Size (#) Length of Vertical Bars (ff.) Time Drilling Was Completed Time Concrete Was Placed Q/1.5 Q/2.0 24 24 24 Q/2.5 Q/3.0 Q/3.5 Q/4.0 66.0 66.0 66.0 95.0 95.0 95.0 ;EE NOTE SEENOTE SEE NOTE 18.3 16.8 17.1 18.4 17.0 17.1 17.6 16.3 16.4 DRY DRY DRY YES YES YES N/A N/A N/A NI^ N/A N/A 6 6 6 6 6 j24 66.0 95.0 SEE NOTE 17.0 17.0 16.7 DRY YES N/A N/A 6 6 24 66.0 95.0 SEE NOTE 17.8 18.0 17.5 DRY YES N/A N/A 66.0 Q/4.5 Q/5.0 24 24 66.0 66.0 95,0 95.0 SEE NOTE SEE NOTE 18.2 18.5 18.5 DRY YES 18.5 18.8 18.8 DRY YES N/A N/A N/A N/A 16.5 16.6 17.7 18.0 18.3 10:06 AM 10:27 AM 10:45 AM 11:06AM 11:15AM :05 AM j 12:36 PM 01:11 PM 95.0 Q/5.5 24 66.0 95.O SEE NOTE SEE NOTE 17.8 18.0 18.0 18.4 18.0 18.4 DRY DRY YES YES N/A N/A Q/5.9 P.9/6.0 24 18 54.0 36.0 93.6 95.0 17.5 17.7 DRY DRY YES YES N/A N/A N/A N/A 6 6 6 6 17.5 18.1 01:30 PM 01:43 PM 01:42 PM 02:05 PM 17.9 16.5 09:36 AM 09:50 AM 10:45 AM 10:53 AM 12:49 PM 11:17AM 6 6 6 6 17.6 17.8 11:03AM 11:22AM 01:18 PM 01:25 PM N/A NIA 18.0 18.4 17.9 18.0 SEE NOTE SEE NOTE REPORT OF DRILLED BELLED PIERS $90l Cax~enter Fr~q,., Suite #100 Dallas, Texas 75247 Project: Project No.: Coppell Business Center II Coppell, Texas 43-2452-97 Report No.: Date of Service: Technician: Page: 9809788 04/15/1998 G. Baxter 2 of 2 Pier Identification Pier Diameter (in.) Bell Diameter (in.) Top of Pier Elevation (ft) Req. Depth From Exist. Grade (ft) Initial Depth of Pier From Existing Grade (ft) Final Depth of Pier From Existing Grade (ft) Depth From Top of Concrete (ft) Condition of Bottom (wet or dry) Plumb Within Tolerance (yes or no) Casing Diameter (in) Cased Depth (ft) P.9/6.5 24 72.0 93.6 SEE NOTE P.9/7.0 24 72.0 93.6 iEE NOTE 18.1 18.0 18.5 18.1 17.8 16.7 DRY DRY YES YES N/A N/A N/A NIA Number of Vertical Bars (ea.) 6 6 Reinforcing Bar Size (#) 6 6 18.3 02:05 PM Length of Vertical Bars (ft.) Time Drilling Was Completed Time Concrete Was Placed 02:11 PM 19.4 02:21 PM 02:25 PM CONCRETE COMP IVE STRENGTH TES. Date of Service: 04/21/1998 Report No.: 9810249 Client No.: 52617000 Project No.: 43-24524 Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppell l] Belt Line Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMEnt DATE: 04/21 / 1998 TIME SAMPLED: 8:30 am BY: M~ WEATHER CONDITIONS: Partly clo~ TEMPERATURE (F) - AIR 53 F CO TRUCK NO: 853 TICKE'I AIR CONTENT (%): 2.0 UNY! PLACEMENT LOCATION: Panels 3-6, 37-55, 62 at Building A SAMPLE LOCATION: Panel 13 REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 1 1 4.75 04/28/1998 7 101350 1 2 4.75 04/28/1998 7 103750 Average 1 3 4.75 05/19/1998 28 I 4 4.75 05/19/1998 28 AC( C Note: Samples taken at pump discharge. This report is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without thc writl 01AK Page I of 4 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 ~7 Report Date 04/29/1998 usiness Center II Rd. & Lakeshore Dr. %xas field test and cast BATCHTIME: 8:10 am :io Villanueva ,dy ~CRETE: 64 g NO: 702593 WEIGHT (pet): N/A :UMULATIVE YARDS: 10 OMPRESSIVE ;TRENGTH (psi) 3580 3670 3630 TYPE approval of HBC Engineering Inc. CONCRETE COMPRE. IVE STRENGTH TES"" Date of Service: 04/21/1998 Client No.: 52617000 Report No.: Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Services: Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 3-5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 04/21/1998 TIME SAMPLED: 9:45 am BY: M~ WEATHER CONDITIONS: TEMPERATURE (F)- AIR TRUCK NO: 853 AIR CONTENT (%): 1.7 PLACEMENT LOCATION: See page 1 SAMPLE LOCATION: Panel 54 REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 2 1 5.25 04/28/1998 7 96690 2 2 5.25 04/28/1998 7 92730 Average 2 3 5.25 05/19/1998 28 2 4 5.25 05/19/1998 28 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Note: See page 1 This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without thc writl 01AK Page 2 of 4 9810249 Report Date 04/29/1998 43-2452-~ 7 Coppell E usiness Center II Belt Line Rd. & Lakeshore Dr. Coppell, 'exas field test and cast BATCH TIME: 9:27 am 50 Villanueva Partly cio] ~dy 62 F CO~CRETE: 66 F TICI~ NO: 702603 UNH WEIGHT (pet}: N/A AC( UMULATIVE YARDS: 110 OMPRESSIVE STRENGTH (psi) 3420 3280 3350 :n approval of HBC Engineering, Inc. CONCRETE COMPRE . IVE STRENGTH TES Date of Service: 04/21/1998 Report No.: Client No.: 52617000 Project No:: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 9810249 43-2452-! Coppell l: Belt Line Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 3-5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 04/21/1998 TIME SAMPLED: 1 1:25 am BY: M WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 802 AIR CONTENT (%): 1.9 PLACEMENT LOCATION: See page 1 Clear 60 ~* co TICKE1 UNI1 SAMPLE LOCATION: Panel 46 REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) Obs. force) 3 1 5.00 04/28/1998 7 98340 3 2 5.00 04/28/1998 7 90180 Average 3 3 5.00 05/19/1998 28 3 4 5.00 05/19/1998 28 AC{ £ Note: See page 1 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writl 01AK Page 3 of 4 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 ~7 Report Date 04/29/1998 usiness Center II Rd. & Lakeshore Dr. ?ex,as field test and cast BATCH TIME: 10:55 am rio Villanueva NCRETE: 69 NO: 702612 'WEIGHT (pc0: N/A UMULATIVE YARDS: 200 OMPRESSIVE STRENGTH (psi) 3480 3190 3340 :n approval of HBC Engineering, Inc. CONCRETE COMPRE " IVE STRENGTH TES_ Date of Service: 04/21/1998 Report No.: 9810249 Client No.: 52617000 Project No.: 43-2452-~ Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell B Belt Line Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTm 3500 psi @ 28 Days 3-5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 04/21/1998 TIME SAMPLED: 12:36 pm BY: Mt WEATHER CONDITIONS: Clear TEMPERATURE (F)- AIR 72 £ co~ TRUCK NO: 802 TICKET AIR CONTENT (%): 1.6 t~rg PLACEMENT LOCATION: See page I SAMPLE LOCATION: Panel 38 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 4 1 5.00 4 2 5.00 4 3 5.00 4 4 5.00 REPORT OF TESTS ACC MAXIMUM C DATE AGE LOAD TESTED (days) (lbs. force) 04/28/1998 7 95110 04/28/1998 7 88200 Average 05/19/1998 28 05/19/1998 28 Note: See page 1 Technician: Marlo Villanueva Report Distribution: (i) Lincoln Property Company (l} Butler Construction (I) O'Bricn & Associates (I} AECC, lnc. Started: 7:30 am Finished: 2:00 pm (1) City of Coppeli/Bldg. Insp. ( 1 ) City of Coppell/Constr. Insp. (I) Mullen & Powell Tcchnistructures 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/29/1998 usiness Center II Rd. & Lakeshore Dr. %xas I field test and cast BATCH TIME: 12:00 pm [rio Villanueva qCRETE: 73 g NO: 702622 WEIGHT (pcf): N/A UMULATIVE YARDS: 300 DMPRESSIVE STRENGTH (psi) 3360 3120 3240 This r~port is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt Vice President m approval of HBC Engineering, Inc. 01AK Page 4 of 4