Northlake 635(3)-LR 980501CONCRETE COMP IVE STRENGTH TES
Date of Service: 04/02/1998 Report No.: 9808768
Client No.: 52617000 Project No.: 43-2452-!
Client: Lincoln Property Company Project: Coppell l~
3300 Lincoln Plaza/Larry Moon Belt Line
500 North Akard Street
Dallas TX 75201-3394 Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requir{
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
rLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/02/1998
TIME SAMPLED: 4:45 am BY:
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 652
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Building D slab, J-M and 1-9
Partly cio
65 F CO
TICKE~
UNI~
SAMPLE LOCATION: L.5-1.5
CYLINDER
MARKED
SET NO.
REPORT OF TESTS ACC
MEASURED MAXIMUM C
SLUMP DATE AGE LOAD
(inches) TESTED (days) Obs. force)
1 1 4.75 04/09/1998 7 84180
I 2 4.75 04/09/1998 7 85120
Average
1 3 4.75 04/30/1998 28 114430
1 4 4.75 04/30/1998 28 113360
Average
This report is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without the writt
01AK Page 1 of 8
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
)7
Report Date
05/01 / 1998
;usiness Center II
Rd. & Lakeshore Dr.
?exas
:l field test and cast
BATCH TIME: N/A
.mon Elrod
NCRETE: 72 F
NO: 659085
'WEIGHT (pcl): N/A
UMULATIVE YARDS: 80
OMPRESSIVE
STRENGTH
(psi)
2980
3010
3000
4050
4010
4030
approval ofHBC Engineering~
CONCRETE COMP IVE STRENGTH TES
Date of Service: 04/02/1998
Report No.: 9808768
Client No.: 52617000 Project No.: 43-2452-!
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppell
Belt Lin,
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requin
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
cowrRAcroR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE Ct~SS: 9349
PLACEMENT DATE: 04/02/1998
TIME SAMPLED: 5:45 am BY: D~
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 582
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Sec page I
Partly cio
67 F cc
TICKEq
UNI~
SAMPLE LOCATION: J.5-2.5
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
2 1 5.50 04/09/1998 7 75890
2 2 5.50 04/09/1998 7 77260
Average
2 3 5.50 04/30/1998 28 116760
2 4 5.50 04/30/1998 28 109430
Average
Note: Technician was
other pump.
AC(
at one pump while concrete driver controlled wa
This rcport is exclusively for thc usc of thc clicnt indicated aSovc and shall not bc rcproduccd except in full without thc writ~
01AK Page 2 of 8
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
05/01/1998
}7
~usiness Center II
Rd. & Lakeshore Dr.
Fexas
d field test and cast
BATCH TIME: 5:40 am
tmon Elrod
ady
NCRETE: 70 F
'NO: 659105
· WEIG~rr (0c0: N/A
',UMULATIVE YARDS:
~OMPRESSIVE
STRENGTH
(psi)
2680
2730
2710
4130
3870
4000
ter from the
180
cn approval of HBC Engineering, Inc.
CONCRETE COMP IVE STRENGTH TES
Date of Service: 04/02/1998
Report No.: 9808768
Client No.: 52617000
Project No.: 43-2452-!
Client:
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project: Coppell [
Belt Line
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform require
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRAC'rOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLAt~r: 27
SPECIFICATION REQUIREMENTS
STRENGTh: 4000 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/02/1998
TIME SAMPLED: 7:10 am BY: D~
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 582
AiR CONTENT (%): N/A
PLACEMENT LOCATION:
Sec page I
Partly clo
67 F CO
TICKE'!
UNYI
SAMPLE LOCATION: L-3.5
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
3 1 5.00 04/09/1998 7 101560
3 2 5.00 04/09/1998 7 103330
Average
3 3 5.00 04/30/1998 28 134740
3 4 5.00 04/30/1998 28 127500
Average
AC(
£
This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without thc writi
01AK Page 3 of 8
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
05/01/1998
)7
;usiness Center II
Rd. & Lakeshore Dr.
['exas
field test and cast
BATCH TIME: 6:35 am
non Elrod
NCRETE: 70 F
NO: 659105
'WEIG~r (pc0: N/A
UMULATIVE YARDS: 280
OMPRESSIVE
STRENGTH
(psi)
3590
3650
3620
4760
4510
4640
FRACTURE
TYPE
.-n approval of i-IBC Engineering, Inc.
CONCRETE COMPRFf3IVE STRENGTH TES.
Date of Service: 04/02/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
9808768
43-2452-~
Coppell B
Belt Line l
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform require(
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/02/1998
TIME SAMPLED: 8:05 am BY: Da:
WEATHER CONDITIONS:
TEMPERATURE (l~ - Am
TRUCK NO: 823
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Sec page I
Partly clou
69 F col
TICKET
SAMPLE LOCATION: K-4.5
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
4 1 5.00 04/09/1998 7 85720
4 2 5.00 04/09/1998 7 84700
Average
4 3 5.00 04/30/1998 28 117790
4 4 5.00 04/30/1998 28 115620
Average
ACC1
C~
This report is exclusively for the usc oftbe client indicated above and shall not be reproduced except in full without thc writtc
01AK Page 4 of 8
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
05/01/1998
asiness Center II
~d. & Lakeshore Dr.
'exas
field test and cast
BATCH TIME: N/A
aon Elrod
dy
[CRETE: 70 F
40: 659116
WEIGHT (pc0: N/A
;MULATIVE YARDS: 380
)MPRESSIVE
~'TRENGTH
(psi)
3030
3000
3020
4170
4090
4130
FRACTURE
TYPE
approval ofHBC Engincering, Inc.
CONCRETE COMPRFff ;IVE STRENGTH TES'"
Date of Service: 04/02/1998
Report No.: 9808768
Client No.: 52617000
Project No.: 43-2452-~
Client:
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project: Coppell B
Belt Line
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform require
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLAin 27
SPECIFICATION REQUIREMENTS
STRENGTm 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETECLASS: 9349
PLACEMEWrDATE: 04/02/1998
TIMESAMPLED: 10:05am BY: Da
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 808
AIR CONTEWr ('/o): N/A
PLACEMENT LOCATION:
See page 1
Partly clol
71 F CO]
TICKET
SAMPLE LOCATION: J-5.5
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
5 1 5.75 04/09/1998
5 2 5.75 04/09/1998
5 3 5.75 04/30/1998
5 4 5.75 04/30/1998
Note: Potter Concrete
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 108650
7 106180
Average
28 133140
28 129480
Average
while technician was at
controlled water
ACC
C
anoth,
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri~
01AK Page 5 of 8
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
05/01/1998
usiness Center II
Rd. & Lakeshore Dr.
'exas
I field test and cast
BATCHTIME: 9:57 nm
mon Elrod
~CRETE: 70 r
NO: 659126
WEIGI~r (0c0: N/A
UMULATIVE YARDS: 480
)MPRESSIVE
~RENGTH
(p~i)
3840
3750
3800
4710
4580
4650
.~r pump.
FRACTURE
TYPE
n approval of HBC Engin~ring, Inc.
CONCRETE COMP IVE STRENGTH TES
Date of Service: 04/02/1998
Report No.: 9808768
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
43-2452-~
Coppell F
Belt Line
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform require
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STm~nGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/02/1998
TIME SAMPLED: 10.'50 am BY: Da
WEATHER CONDITIONS: Partly clo~
TEMPERATURE (F) - AIR 75 F CO
TRUCK NO: 848 TICKE~i
AIR CONTENT (%): N/A tmrl
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: K.5-6.5
CYLINDER
MARKED
SET NO.
REPORT OF TESTS ACC
MEASURED MAXIMUM C
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
6 1 5.00 04/09/1998 7 102190
6 2 5.00 04/09/1998 7 106690
Average
6 3 5.00 04/30/1998 28 123500
6 4 5.00 04/30/1998 28 117600
Average
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
05/01/1998
,7
.usiness Center II
Rd. & Lakeshore Dr.
?exas
field test and cast
BATCH TIME: 10:17 am
non Elrod
This report is exclusively for thc usc of the client indicated above and shall not bc rcproduccd except in full without thc wri~
lay
~ICRETE: 80 F
r~o: 659142
WEIGHT (pcO: N/A
UMULATIVE YARDS: 580
DMPRESSIVE
STRENGTH
(pal)
3610
3770
3690
4370
4160
4270
~,n approval of HBC Engineering, Inc.
01AK Page 6 of 8
CONCRETE COMPRW"SIVE STRENGTH TES""
Date of Service: 04/02/1998 Report No.: 9808768
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
43-2452-3
Coppell E
Belt Line
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform require
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/02/1998
TIME SAMPLED: 12:15 pm BY: Da
WEATHER CONDITIONS: Partly clol
TEMPERATURE (F) - AIR 78 F CO]
TRUCK NO: 526 TICKET
AIR CONTENT (%): N/A tmrr
PLACEMENT LOCATION:
Sec page I
SAMPLE LOCATION: J-7.5
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) 0b~. force)
7 I 5.25 04/09/1998 7 97620
7 2 5.25 04/09/1998 7 102390
Average
7 3 5.25 04/30/1998 28 120650
7 4 5.25 04/30/1998 28 116470
Average
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
05/01/1998
'7
usiness Center II
Rd. & Lakeshore Dr.
'exas
field test and cast
BATCH TIME: N/A
aon Elrod
ACC
C~
This raport is exclusively for thc use of thc client indicated above and shall not be reproduced cx~cpt in full without the wri~
qCRETE: 80 F
~o: 659156
WEIGHT (pc0: N/A
~MULATIVE YARDS: 680
)MPRESSIVE
S~FRENGTH
(~i)
3450
3620
3540
4270
4120
4200
FRACTURE
TYPE
approval ofHBC Engin~ring. Inc.
01AK Page 7 of 8
CONCRETE COMPRF"SIVE STRENGTH¢%
Date of Service: 04/02/1998 Report No.: 9808768
Client No.: 52617000 Project No.: 43-2452.
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppell
Belt Lin,
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requir
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLAI~IT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/02/1998
TIME SAMPLED: 2:00 pm BY: E
WEATHER CONDITIONS: Partly ell
TEMPERATURE (F) - AIR 80 F C~
TRUCKNO: 658 TIC~a~
AIR CONTENT (%): N/A UN1
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: L-8.5
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
8 1 5.00
8 2 5.00
8 3 5.00
8 4 5.00
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (days) Obs. force)
04/09/1998 7 96700
04/09/1998 7 98950
Average
04/30/1998 28 110270
04/30/1998 28 115620
Average
AC
Technician: Damon Elrod
Report Distribution:
(1) Lincoln Property Company
(i) Butler Construction
(I) O'Brien & Associates
(I) AECC, Inc.
Started: 3:00 am Finished: 6:00 pm I-~
(1) City ofCoppell/Bldg, lnsp.
(1) City of Coppell/Constr. lnsp.
(1) Mullen & Powell Technistructures
This report is exclusively for thc use of thc client indicated above and shall not bc rcproduccd cxccpt in full without thc w~
ENGINEERII~, INC.
11901 Carpenter Frwy., Shire #100
Dallas, Texas 75247
Report Date
05/01/1998
.97
Business Center II
,' Rd. & Lakeshore Dr.
Texas
~d field test and cast
BATCH TIME: 12:55 pm
amon Elrod
~udy
~NCRETE: 80 F
rNO: 616321
T WEIGHT (pcf): N/A
:UMULATIYE YARDS: 780
'OMPRESSIVE
STRENGTH
CmO
3420
3500
3460
3900
4090
4O00
TYPE
Eng Inc.
~ugene Harbour
Vice President
tten approval of HBC Engineering Inc.
01AK Page 8 of 8