Loading...
Meadows Addn 1-CS 911206The City With A Beautiful Future December 6, 1991 Mr. Walter Skipwith, P.E. Albert H. Halff Associates 86i6 Northwest Plaza Drive Dallas, TX 75225 Re: Approved proposals for Engineering Services Phase I Drainage Improvements Dear Walter: Attached please find four executed proposals for the improvement projects, as approved by the City Council on 1) Brooks Lane - Stage I Partial/Inlets only 2) Sandy Knoll/Shadowcrest - Stage I and Sandy Knoll/ 3) Meadows Subdivision - Stage I 4) Meadows Subdivision - Stage. II We look forward to working with you and Jean Hansel Please call me if you have any questions. Acting City Engineer MSD/bd c: Gary L. Sieb, Director of Planning and Cormmunity Jean Hansen, P.E., Albert H. Halff Associates DR~INPR P. O, Box 478 Coppell, Texas 75019 214 - 462-0022 FAX 214 - 393-0948 following drainage NoVember 12, 1991. Woodhurst Pavement on these projects. rvices PROPOSAL FOR ENGINEERING SERVICES CITY OF COPPELL PHASE 1 DRAINAGE 1MPROVEM 1008.91.3915 MEADOWS SUBDIVISION - STAGE II A. Description of Project Preparation of construction plans and specifications for storm se proposed diversion through Waterside Estates - Phase I. The infrastmcttm has been completed but the majority of the residential lots are currently required easement through this subdivision was obtained by the city during construction of this project is not scheduled until Phase 4 of the implementa~ the scope of services for this project includes preparation of construction pla allowing city staff to proceed with a portion or all of this construction in a example, the lake ouffall could be installed immediately to avoid fence and 1; where the easement traverses two lots. It is also possible that the curt'{ participate in some portion of the construction cost since this project benefits adjacent to Waterside Estates. B. Scope of Work Basic Services Phase 1 - Survey for Design · Set Control · Design Surveys Phase 2 - Design Services Prepare construction drawings Utility conflicts Inlet design Diversion design Update cost estimates for final design Obtain plan approval from the city 1 staff meeting (maximum) 1 council meeting (maximum) - addifi¢ property owner coordination will be si meeting is not required. Prepare construction contracts and specifica6 Page 1 - ENTS wer inlets and the in this subdivision undeveloped. The a recent replat. The ion plan. However, ts and specifications timely_ manner. For mdscape relocations :nt developer might Parkway Boulevard ,nal staff meetings or bstimted if a council ~ns PROPOSAL (cont.) MEADOWS SUBDIVISION - STAGE II Phase 3 - Easement Documentation A drainage easement has been obtained through However, one additional easement along the existing house at thc southeast Glen Circle and Woodmor Drive will be required. This task includes the pr~ description and other easement documentation for this property. Contacting is also included. " Services Not Included in this Contract Bidding and contract award Contract administration Survey for construction Full _time or half time resident construction inspector Certification that work is built in accordance with plan Consulting services by others except as noted in the S Filing fees, permit fees and taxes Environmental impact assessments Printing of plans and specifications over and above tho review. C. Fee Proposal Phase 1 - Survey for Design Phase 2 - Design Services Construction Plans and Specifications Easement Documentation Total Basic Fee Proposal The Basic Fee for the services described above will be based on ~ $16,700.00. The engineering services will be billed monthly or at the comple whichever comes fa'st. The work will be invoiced on an hourly basis of 2.13 Salary cost as defined by the ASCE Manual and Report on Engineering Pm cost of salaries (including sick leave, vacation, holiday and incentive pay chargeable to the project, plus unemployment, excise and payroll taxes an, social security, employment compensation insurance, retirement, medical and Direct costs such as reproduction, sub-consultant services, long distance pho etc. will be billed at 1.10 times cost. Computer charges will be invoiced at Page 2 ~taterside Estates. comer of Meadow :paration of a legal fie property owner ~and specifications :ope of Work se required for city $3,000.00 $12,500.00 $1,200.00 $16,700.00 lump sum fee of tion of each phase, times salary costs. ctice No. 45 is the for time directly contributions for nsurance benefits. ~e calls, deliveries, 1.0 times cost. PROPOSAL (cont.) MEADOWS SUBDIVISION - STAGE II This proposal will serve as the engineering services contract upon ex¢ below: Albert H. Halff Associates, Inc. Title: ~'~" ~'~ Accepted: City of Cop~ By: Title: Date: il//~/~l Page 3 cution in the spaces eU DD INLET 54"R.C PARK~. ' BLVD. STAGE II ~ TO REDUCE STREET FLOODING, 2-10'INLETS IN PARKWA"~"~ D- 1-10'INLET IN MEADOW GLEN 1-10'INLET IN MEADOW RUN 1-10'INLET IN MARLEE ~!,RCLEt,r ADD: 54"R.C.P. 8' 4D EXIS I!~':['~ ALL 10' 10' INLET 2-54' II ~ fERT sTOBM' - AINAGE VIA THRU ~ OUTFALL T_C).` EXISTING / MEAD( -~ .-,~,, (~ ,._. . '-' -..~___.~\ 100 SCALE · .. ~ iURE Vii- 13: SITE M SUBDIVISION IMPROVEMENTS Ill ~ I I I1' Y .... r I~il'i]' i '-il