Loading...
Northlake 635(3)-LR 980505CONCRETE COMPRE IVE STRENGTH TES'" 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/06/1998 Report No.: 9809011 Report Date 05/05/1998 Client No.: 52617000 Project No.: 43-2452-! ;7 Client: Lincoln Property Company Project: Coppell [iusiness Center II 3300 Lincoln Plaza/Larry Moon Belt Line Rd. & Lakeshore Dr. 500 North Akard Street Dallas TX 75201-3394 Coppell, ?exas Services: Obtain samples of fresh concrete at the placement locations, perform require field test and cast compressive strength samples.** PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9337 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/06/1998 BATCH TIME: 8' 10 am PLANT: 22 TIME SAMPLED: 8:50 am aY: D~ non Elrod SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cio ady STRENGTH: 3500 psi ~ 28 Days TEMPERATURE (F} - AIR 68 F CO~CRETE: 76 ~ SLUMP: 5" TRUC~:NO: 1824 TICKE~ NO: 646210 AIR: N/A AIR CONTENT (%): N/A UNn WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Building A, Panels 20-31 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Panel 26 REPORT OF TESTS ACC UMULATIVE YARDS: 30 CYLINDER MEASURED MAXIMUM C I~MPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 4.50 04/13/1998 7 99780 3530 1 2 4.50 04/13/1998 7 96400 3410 Average 3470 I 3 4.50 05/04/1998 28 119580 4230 1 4 4.50 05/04/1998 28 114490 4050 Average 4140 This report is exclusively for thc usc of the client indicated above and shall not be reproduced except in full without the wri~ =n approval of HBC Engineering, Inc. 01AK Page I of 3 CONCRETE COMPRE'"'3IVE STRENGTH TES'"" ENGINFY_RING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/06/1998 Report No.: 9809011 Report Date 05/05/1998 Client No.: 52617000 Project No.: 43-2452-c~,7 Client: Lincoln Property Company Project: Coppell I~ usiness Center II 3300 Lincoln Plaza/Larry Moon Belt Line Rd. & Lakeshore Dr. 500 North Akard Street Dallas TX 75201-3394 Coppell, 'eTas Services: Obtain samples of fresh concrete at the placement locations, perform requir~ field test and east compressive strength samples.** PROJECT DATA CONTrACtOR: Butler Construction CONCRETE CLASS: 9337 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/06/1998 BATCH TIME: 9.'55 am PLANT: 22 TIME SAMPLED: 10:35 am BY: Da aDA Elrod SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly clo~dy STRENGTH: 3500 psi ~ 28 Days TEMPERATURE (F) - AIR 72 F CO]~CRETE: 78 F SLUMP: 5" TRUCKNO: 752 TICKET NO: 646220 AIR: N/A AIR CONTENT (%): N/A uNrr WEIGHT (PC0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Building C, Panels 93-102 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Panel 93 REPORT OF TESTS ACC JMULATIVE YARDS: 130 CYLINDER MEASURED MAXIMUM O )MPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 5.00 04/13/1998 7 89310 3160 2 2 5.00 04/13/1998 7 84530 2990 Average 3080 2 3 5.00 05/04/1998 28 128780 4550 2 4 5.00 05/04/1998 28 117890 4170 Average 4360 This report is exclusively for thc use of thc client indicated above and shall not be reproduced except in full without the writt¢n approval of HBC Engineering, [nc. 01AK Page 2 of 3 CONCRETE COMPRE '31VE STRENGTH TES 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/06/1998 Report No.: 980901! Report Date 05/05/1998 Client No.: 52617000 Project No.: 43-2452-c~ 7 Client: Lincoln Property Company Project: Coppell Business Center II 3300 Lincoln Plaza/Larry Moon Belt Line Rd. & Lakeshore Dr. 500 North Akard Street Dallas TX 75201-3394 Coppell, 'exas Services: Obtain samples of fresh concrete at the placement locations, perform requir( field test and cast compressive strength samples.** PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9337 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/06/1998 BATCH TIME: 1:05 pm PLANT: 22 TIME SAMPLED: 12:25 pm BY: Da non Elrod SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly ciottdy STRENGTH: 3500 psi ~ 28 Days TEMPERATURE (F) - AIR 77 F CO]~CRETE: 80 F SLUMP: 5" TRUCKNO: 552 TICKET NO: 646233 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf}: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Building C, Panels 93-102 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Panel 102 REPORT OF TESTS AC( JMULATIVE YARDS: 230 CYLINDER MEASURED MAXIMUM )MPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 4.00 04/13/1998 7 94420 3340 3 2 4.00 04/13/i 998 7 89900 3180 Average 3260 3 3 4.00 05/04/1998 28 133300 4710 3 4 4.00 05/04/1998 28 129190 4570 Average 4640 Technician: Damon Elrod Started: 7:00 am Finished: 2:00 pm ~ Em, inea~lnm,4nc. Report Distribution: (1) Lincoln Property Company (I) City of'Coppcll/BIdg, lnsp. (I) Butler Construction (I) City o£ Coppell/Constr. lnsp. Et tgene Harbour (1) O'Brien & Associates (I) Mullen & Powell Technistructures Vice President (I) AECC, Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt¢n approval of HBC Engineering, Inc. 01AK Page 3 of 3 11:36 FAX 214630707/k.r~ IIBC ENGINEERING ~ ~001/004 FAX TRANSMITTAL ENGINEERII~, INC. DATE: May 6, 1998 _ TIME: a.rT1. TO: See Below FAXNO.: S~--~e Below.~ ~ROt~: Jamie for Eugene Harbour om=tc~: h'BC - Dallas Total Pages Including Cover: REMARKS: .- Mr. Larrv Moon, Lincoln Property Company 214 7zl0-3451 Brett, Butler Construction 817 5~ 9-9618 Mr. Tom Albright, O'Brien & Associates 972 ~8-4828 AECC, Inc. 972 91~0-7680 Mr. Lee stone, City of Coppell/Bldg. InSP. 972 3C4-3514 Mr. Larry D.avis, City of Co.p_pell/Const. Insp. 972 3C,4-3570 Mr. Dennis Gant, Mullen & Powell Technistructures 214 5;:8-1728 & Tt~o information in this facsimile message and for the use of the individual or entity named above. If the reader of this message is not the the employee or agent responsible to deliver it to the intended recipient, hereby nation, distribution or copying of this oommunicafion is strictly prohibited. tion in error, please immediately notify us by telephone and via the US Postal service. Thank you. HOUSTON DALLAS ATLANTA 2313 W. Sam Houston Pkwy. N. 8901 Carpenter Freeway 3913 2470 Windy Hill Rd. Suite 107 Suite 100 Suit~ 312 Suite 300 Hous[on, Texas 77043 Dallas, Texas 75247 ' Austin, Texas 78744 4arie[ta, Georgia ~0067 Phone: (713) 722-0700 Phone: (214) 630-1010 Phone: (512) 442-1122 Phone: (770) 618-3055 Fax: (713) 722-0788 Fax: (214) 630-7070 Fax: (512)442-115[ Fax: (770)615-3015 05/06/98 11:37 FAX 2146307070 HBC ENGINEERING ~]002/004 I!F, PORT OF DRILLED PIER INSPECTION 8901 C~ryent~" lr~"wy~ Suib #lO0 Date of Service: 0510511998 Rcport No.: 9811521 Report Date 0510611998 Client No.: 52617000 Ftoject No.: 43-2452-9? Client: Lini:oln Property Company Project: Coppell 3usinessCmterll 3300 Lincoht Plaza/Larry Moon Belt Li~ Rd. & Lakeshore Dr. 500 Noflh Ak~rd Str~ Coppell, Tex~s Dallas TX 75201-3394 SCF~/Ces: Drilled pier inspection. On this date, an H~C Engineering technician arrived at the above ret erenced jobsite as scheduled for drilled pier inspection at Building B. Upoa arrival, technician was told of situation a~d decided to discuss with Chris B~tler of Butler Construction as to what was the purpose of this pier (see attached drawing for approximate pie: location). No pier designation was provided by contractor. Chris stated that the purpose of this pier was because two original piers were too close together a third larger pier was needed :o bridge the other two because one caved in from original pier hole. Chris also stated he had talked to someone with HBC about this. Technioiaa% called HB¢ but could not confirmwi:h anyone there who had ~iscussed pier with Chris Butler. Chris was also asked i: he had consulte~ with the structural Engineer of Record for the project and he sta:ed no. Technician informed Chris Butler that if he proceeded with the pier as is, that HBC would need to report that this pier was not in compliance ~.ith plans a~d specifications and he agreed. Technician also observed that ~he cr~ne was moved to this area of the building. It appeared as though it was intende¢ to set tilt panels on this column line in the next ~ew days which ~ay or may not be enough time for concrete in this pier to cure and properly hold panel if i~ is set too soon. Concrete was placed in pie: hole and complete as of l:lSpm 0~ this date. Rein~0rcing placed i~ pier was not proper for pier of tha~ size. ~ o separate cages containing six #5 bars each were placed on the east side of p~.er hole and ~ier hole. did not have balasters to keep rein~o=cing from Couching bottc~ o: ~ Excessive amount of soil :ell to bo:t~n of pier hole when reinforci:~g was placed in hole by hand and allowed to slide off top of hole. Integrity o£ this pier should be ques:io~ed. See a~tached sheets ~or recorded data. T~ t~t in ~xdugvdy f~ ~ke u.~oa/'lh= di~t iadioatcd ab°v~ t~d ~ n~ ~ r~ ~ h ~R~ ~ ~ ~ ~°~I ~c ~ Inc' 99M.T Ptge I of 1 REPORT OF DRILLED PIERS Project: CoppeL1 Business Center II-Building B Coppell, Texas P reject Id o.: 43-2452-97 Pier Ide ntifl cae. ion Pier Diameter (in.) Top of Ground Elevation (ft.) Top of Pier Elevation (It.) Depth to Bearing Stratum from Ground (ft.) Depth of Pier From Ground Requlred Penetration (ft.} Actual Penetration (it.) _nernth From Top of Concrete (It.) ConclitJon of Bottom (wet or dry) Plumb Within Tolerance (yes or no) Casing Diameter (in.) C~_~_ed Depth (ft.) Number of Vertical Bara (ea.) Reinforcing Bar Size (#) Length of Vertical Bars {fL) Time Drilling Was Completed Time Concrete Was Placed Report No.: Date of Sewice: Technician: Page: 9811521 05/05/1998 D, Rafliff loll SEE NOTE 54 ~EE NOTE 8,5 SEE NOTE SEE NOTE 5.3 DRY N/A t2 7.5 09:45 AM 01:15 PM 05/06/98 11:35 FAX 2146307070 ]iBC ENGINEERING .~004/004 I