Northlake 635(3)-LR 980506CONCRETE COMP IVE STRENGTH TES ENGINF_F_RII~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 04/07/1998 Report No.: 9809120 05/06/1998 Client No.: 52617000 Project No.: 43-2452-~7 Client: Lincoln Property Company Project: Coppell B asiness Center II 3300 Lincoln Plaza/Larry Moon Belt Line ~d. & Lakeshore Dr. 500 North Akard Street Dallas TX 75201-3394 Coppell, 'eTas Services: Obtain samples of fresh concrete at the placement locations, perform require field test and cast compressive strength samples.** PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9351 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/07/1998 BATCH TIME: 10:50 am PLANT: 22 TIME SAMPLED: 11:05 am BY: Da non Elrod SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F) - AIR 78 F CO]~CRETE: 80 F SLUMP: 5" TRUCK NO: 512 TICKET NO: 640288 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Pavement between Buildings A & C ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 20'N/SEC, 10' in, west REPORT OF TESTS ACC ]MULATIVE YARDS: 60 CYLINDER MEASURED MAXIMUM C )MPRESSIVE MARKED SLUMP DATE AGE LOAD ~TRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.00 04/14/1998 7 94010 3320 1 2 5.00 04/14/1998 7 89670 3170 Average 3250 1 3 5.00 05/05/1998 28 118910 4210 I 4 5.00 05/05/1998 28 123880 4380 Average 4300 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt~ :n approval of HBC Engineering, Inc. 01AK Page I of 3 CONCRETE COMP IVE STRENGTH TES 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/07/1998 Report No.: 9809120 Report Date 05/06/1998 Client No.: 52617000 Project No.: 43-2452-~7 Client: Lincoln Property Company Project: Coppell Business Center II 3300 Lincoln Plaza/Larry Moon Belt Line ~,d. & Lakeshore Dr. 500 North Akard Street Dallas TX 75201-3394 Coppell, ~exas Services: Obtain samples o£fresh concrete at the placement locations, perform require field test and cast compressive strength samples.** PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 935 ] CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/07/1998 BATCH TIME: 12:25 pm PLANT: 22 TIME SAMPLED: 12:55 pm BY: Da non Elrod SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)~ AIR 79 F CO]~ICRETE: 84 F SLUMP: 5" TRUCKNO: 552 TICm~TNO: 640304 AiR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pel): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 50'N/SEC, 20' west REPORT OF TESTS ACC UMULATIVE YARDS: 160 CYLINDER MEASURED MAXIMUM ~)MPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 5.00 04/14/1998 7 80850 2860 2 2 5.00 04/14/1998 7 76610 2710 Average 2790 2 3 5.00 05/05/1998 28 116820 4130 2 4 5.00 05/05/1998 28 116440 4120 Average 4130 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt ,'n approval of HBC Engineering, Inc. 01AK Page 2 of 3 CONCRETE COMPRF/'s;IVE STRENGTH TES ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/07/1998 Report No.: 9809120 Report Date 05/06/1998 Client No.: 52617000 Project No.: 43-2452-9' Client: Lincoln Property Company Project: Coppell Bi finess Center II 3300 Lincoln Plaza/Larry Moon Belt Line !',d. & Lakeshore Dr. 500 North Akard Street Coppell, T ~xas Dallas TX 75201-3394 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9351 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/07/1998 aATCHTIME: 2:20 pm PLANT: 22 TIME SAMPLED: 2:55 pm aY: Dannon Elrod SPECIFICATION REQUIREMENTS WEATHER CONDrrIONS: Sunny, wi~ dy STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)- AIR 81 F CO~ CRETE: 88 ~ SLUMP: 5' TRUCKNO: 853 TICKET;tO: 640324 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 80'N/SEC, 15' in, west REPORT OF TESTS ACCl IMULATIVE YARDS: 260 CYLINDER MEASURED MAXIMUM C¢ )MPRESSIVE MARKED SLUMP DATE AGE LOAD TRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 4.50 04/14/1998 7 102620 3630 3 2 4.50 04/14/1998 7 98100 3470 Average 3550 3 3 4.50 05/05/1998 28 130850 4630 3 4 4.50 05/05/1998 28 134880 4770 Average 4700 Technician: Damon Elrod Started: 9:00 am Finished: 4:30 am ~ Engineering, iJ~ ~ Report Distribution: (I) Lincoln Property Company (l) City of Coppell/BIdg. Insp. (I) Butler Construction (I) City of Coppell/Constr. Insp. Et tgene Harbour (I) O'Brien & Associates (I) Mullen & Powell Technistructures Vice President (I) AECC, Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt¢ approval of HBC Engineering, Inc. 01AK Page 3 of 3 REPORT OF DRILLEE" . IER INSPECTION ENGINEERING, INC. 8901 Carpenter lrrwy., .quit~ #100 Dallas, Texas 75247 Date of Service: 05/05/1998 Report No.: 9811521 Report Date 05/06/1998 Client No.: 52617000 Project No..' 43-2452-~ Client: LinColn Property Company Project: Coppell B ~siness Center II 3300 Lincoln Plaza/Larry Moon Belt Line ]kd. & Lakeshore Dr. 500 North Akard Street Coppell, 'I exas Dallas TX 75201-3394 Services: Drilled pier inspection. On this date, an HBC Engineering technician arrived at the above refe::enced jobsite as scheduled for drilled pier inspection at Building B. Upon arrival, technician was told of situation and decided to discuss with Chris Bul:ler of Butler Construction as to what was the purpose of this pier (see attar:bed drawing for approximate pier location). No pier designation was provided by ,:ontractor. Chris stated that the purpose of this pier was because two original p2.ers were too close together a third larger pier was needed to bridge the other two because one caved in from original pier hole. Chris also stated he had talke¢ to someone with HBC about this. Technician called HBC but could not confirm wit] anyone there who had d~scussed pier with Chris Butler. Chris was also asked if he had consulted with the structural Engineer of Record for the project and Ire stated no. Technician informed Chris Butler that if he proceeded with the p~.er as is, that HBC would need to report that this pier was not in compliance wil:h plans and specifications and he agreed. Technician also observed that the cran~ was moved to this area of the building. It appeared as though it was intended :o set tilt panels on this column line in the next few days which may or may not De enough time for concrete in this pier to cure and properly hold panel if it .s set too soon. Concrete was placed in pier hole and complete as of l:15pm on :his date. Reinforcing placed in pier was not proper for pier of that size. Twc separate cages containing six #5 bars each were placed on the east side of pie:: hole and did not have balasters to keep reinforcing from touching bottom of pi~r hole. Excessive amount of soil fell to bottom of pier hole when reinforcing was placed in hole by hand and allowed to slide off top of hole. Integrity of t]tis pier should be questioned. See attached sheets for recorded data. Technician Time: 10:00am to 2: 00pm Technician: Del Ratliff ~' Report Distribution: (1) Lincoln Property C~mp~y (1) City of Coppell]Bld~ Insp. (1) Butl~x Cc~q, ructkm (1) City of Coppell/Ccustr. Insp. ~ . Pa u~ D. Smith, p.E. ( 1 ) Oq3rim & Associates ( 1 ) Mullm & Powell TectmLsa'uctures ~ · ~ Senibr Project Engineer (1) AEC, C, Inc. This report is exclus/vcly for the use of the client indicated above ~d shall not be reproduced except in full without the wriacn: ~proval of HBC Engineering, Inc. 99MP Page 1 of 1 REPORT OF DRILLED PIERS Project: Project No.: Pier Identification Pier Diameter (in.) 8901 Caxpenter Frwy., Suite #100 Dallas, Texas 75247 Coppell Business Center II-Building B Coppell, Texas 43-2452-97 Report No.: Date of Service: Technician: Page: 9811521 05/05/1998 D. Ratliff 1 ofl To__p of GroumI E!~vation (~ff_.). Top of Pier Elevation (ft.) Depth to Bearing Stratum from Ground (ft.) SEE NOTE1 54 N/A N/A SEE NOTE Depth of Pier From Ground (ft.) 8.5 Required Penetration (ft.) SEE NOTE Actual Penetration (ft.) ;EE NOTE Depth From Top of Concrete (ft.) Condition of Bottom (wet or dry) 5.3 Plumb Within Tolerance (yes or no) DRY N/A Casing Diameter (in.) N/A Cased Depth (ft.) N/A Number of Vertical Bars (ea.) Reinforcing Bar Size (#) Length of Vertical Bars (ft.) 12 7.5 Time Drilling Was Completed 09:45 AM Time Concrete Was Placed 01:15 PM DATE: ENGINEERING, ~. CONCRETE COMPRW"SIVE STRENGTH TES ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 04/08/1998 Report No.: 9809216 05/08/1998 Client No.: 52617000 Project No.: 43-2452-~ 7 Client: Lincoln Property Company Project: Coppell Business Center II 3300 Lincoln Plaza/Larry Moon Belt Line Rd. & Lakeshore Dr. 500 North Akard Street Dallas TX 75201-3394 Coppell, 'exas Services: Obtain samples of fresh concrete at the placement locations, perform requir~ I field test and east compressive strength samples.** PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9337 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/08/1998 BATCH TIME: 8'00 am PLANT: 22 TIME SAMPLED: 8:50 am BY: Da mort Elrod SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly clo~ldy STRENGTH: 3500 psi ~ 28 Days TEMPERATURE (F)-AIR 69 V COqCRETE: 80 F SLUMP: 5" TRUCKNO: 736 TlC~a~T NO: 640368 AIR: N/A AIR CONTENT (%): N/A UNYI WEIGHT (pcf}: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Panels Building A, 14-19, 10, 2, 56-61 A STM C- 172 ASTM C-39 SAMPLE LOCATION: Panel 19 REPORT OF TESTS ACC UMULATIVE YARDS: 70 CYLINDER MEASURED MAXIMUM C ~)MPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) Obs. force) (psi) TYPE I 1 4.75 04/15/1998 7 72010 2550 I 2 4.75 04/15/1998 7 65870 2330 Average 2440 I 3 4.75 05/06/1998 28 110420 3900 I 4 4.75 05/06/1998 28 109210 3860 Average 3880 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt m approval of HBC Engineering Inc. 01AK Page 1 of 2 CONCRETE COMPRW IVE STRENGTH TES 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/08/1998 Report No.: 9809216 Report Date 05/08/1998 Client No.: 52617000 Project No.: 43-2452-~7 Client: Lincoln Property Company Project: Coppell Business Center II 3300 Lincoln Plaza/Larry Moo,~ Belt Line Pxd. & Lakeshore Dr. 500 North Akard Street Dallas TX 75201-3394 Coppell, 'exas Services: Obtain samples of fresh concrete at the placement locations, perform requir{ field test and cast compressive strength samples.** PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9337 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/08/1998 BATCH TIME: 9:09 am PLANT: 22 TIME SAMPLED: 10:05 am BY: Da non Elrod SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly clo!~dy STRENGTH: 3500 psi ~ 28 Days TEMPERATURE (F) - AIR 74 F COI~CRETE: 82 F SLUMP: 5" TRUCKNO: 841 TICKET NO: 640380 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Panel 58 REPORT OF TESTS ACC LIMULATIVE YARDS: 170 CYLINDER MEASURED MAXIMUM C' )MPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 5.00 04/15/1998 7 85330 3020 2 2 5.00 04/15/1998 7 84240 2980 Average 3000 2 3 5.00 05/06/1998 28 114380 4040 2 4 5.00 05/06/1998 28 116130 4110 Average 4080 Technician: Damon Elrod Started: 8:30 am Finished: 12:00 _ _H~ Engine,~r~ -~a~-~---- Report Distribution: (1) Lincoln Property Company (I) City of Coppell/BIdg. lnsp. (I) Butler Construction (I) City of Coppell/Constr. Insp. E1 igene Harbour (I) O'Bricn & Associates (I) Mullen & Powell Technistmctures Vice President (l) AECC, Inc. This report is exclusively for thc use &thc client indicated above and shall not be reproduced except in full without the writt~ approval of HBC Engineering, Inc. 01AK Page 2 of 2