Northlake 635(3)-LR 980508CONCRETE COMP IVE STRENGTH TES
ENGINF_P_RING, INC.
8901 Carpenter Frwy., Suite gl00
Dallas, Texas 75247
Date of Service: 04/08/1998 Report No.: 9809215 Report Date
05/08/1998
Client No.: 52617000 Project No.: 43-2452-~ 7
Client: Lincoln Property Company Project: Coppell Business Center II
3300 Lincoln Plaza/Larry Moon Belt Line Rd. & Lakeshore Dr.
500 North Akard Street
Dallas TX 75201-3394 Coppell, 'exas
Services: Obtain samples of fresh concrete at the placement locations, perform requir{ field test and cast
compressive strength samples.**
PROJECT DATA
CONTRACTOR: Butler Construction CONCRETE CLASS: 9349
CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/08/1998 BATCH TIME: 5:05 am
PLANT: 22 TIME SAMPLED: 5:50 am BY: Do aDa Elrod
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy
STRENaTN: 4000 psi ~ 28 Days TEMPERATURE (F)- AIR 69 r co qCRETE: 83 V
SLVMP: 5" TRUCKNO: 552 TICKET NO: 640348
AIR: N/A AIR CONTENT (%): N/A t~Il WEIGHT (pc0: N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Building D slab, J-M & 9-11
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: L.5/9.5
REPORT OF TESTS ACC UMU~TrVE YARDS.' 70
CYLINDER MEASURED MAXIMUM C DMPRESSIVE
MARKED SLUMP DATE AGE LOAD ;TRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 4.75 04/15/1998 7 82570 2920
1 2 4.75 04/15/1998 7 84240 2980
Average 2950
I 3 4.75 05/06/1998 28 125610 4440
I 4 4.75 05/06/1998 28 127640 4510
Average 4480
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt ."n approval of HBC Engineering, Inc.
01AK Page I of 2
CONCRETE COMPRE(' ,IVE STRENGTH TES.
ENG--, RqC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 04/08/1998 Report No.: 9809215 Report
Date
05/08/1998
Client No.: 52617000 Project No.: 43-2452-9
Client: Lincoln Property Company Project: Coppell B siness Center II
3300 Lincoln Plaza/Larry Moon Belt Line l~,d. & Lakeshore Dr.
500 North Akard Street
Dallas TX 75201-3394 Coppell, ~[ exas
Services: Obtain samples of fresh concrete at the placement locations, perform require( field test and cast
compress ive strength samples.* *
PROJECT DATA
CO~rrRACrOR: Butler Construction CONCRETE CLASS: 9349
CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/08/1998 BATCH TIME: 6:13 am
PLANT: 22 TIME SAMPLED: 6:35 am BY: Da non Elrod
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Mostly cie udy
STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F}-AIR 67 F COrtCRETE: 83 V
SLUMP: 5" TRUCKNO: 756 TICKETNO: 640358
AIR: N/A AiR CONTENT (%): N/A UNIT WEIGHT (pet): N/A
TEST METHOD: ASTM C-143 PLACEMENT LOCATION:
See page !
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: K-10.5
REPORT OF TESTS AC( JMULATIVEYARDS: 170
CYLINDER MEASURED MAXIMUM ,MPRESSIVE
MARKED SLUMP DATE AGE LOAD ;TRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
2 1 5.00 04/15/1998 7 93250 3300
2 2 5.00 04/15/1998 7 89900 3180
Average 3240
2 3 5.00 05/06/1998 28 132520 4690
2 4 5.00 05/06/1998 28 134880 4770
Average 4730
ReportTechnician:Distribution:Dam°n Elrod Started: 3:00 am Finished: 8:30 am I'"l~~Inc.
(1) Lincoln Property Company (1) City of Coppell/BIdg. lnsp.
(1) Butler Construction (I) City of Coppell/Constr. lnsp. E~gene~Iarbour
(1) O'Brien & Associates (I) Mullen & Powell Technistmctures Vice President
(1) AECC, Inc.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ~ :n approval of HBC Engineering, Inc.
01AK Page 2 of 2
CONCRETE COMP IVE STRENGTH TES
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 04/09/1998 Report No.: 9809332 Report Date
05/08/1998
Client No.: 52617000 Project No.: 43-2452-! ;7
Client: Lincoln Property Company Project: Coppell iusiness Center II
3300 Lincoln Plaza/Larry Moon Belt Lira Rd. & Lakeshore Dr.
500 North Akard Street
Dallas TX 75201-3394 Coppell, ?exas
Services: Obtain samples of fresh concrete at the placement locations, perform require :l field test and cast
compressive strength samples.**
PROJECT DATA
CONTRACTOR: Butler Construction CONCRETE CLASS: 9349
CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/09/1998 BATCH TIME: 6:22 am
PriNT: 22 TIME SAMPLED: 7:05 am BY: DE,moA Elrod
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear, wiltdy
STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F) - AIR 51 l* CCNCRETV.: 80 F
SLUMP: 5" TRUCK NO: 1805 TICKE1 NO: 640451
AIR: N/A AIR co.rEar (%): N/A t~ia'WEiarrr (pet): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Building D slab, F-H & 1-9
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: H-i.5
REPORT OF TESTS ACCUMULATIVE YARDS: 80
CYLINDER MEASURED MAXIMUM £ OMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 4.75 04/16/1998 7 95830 3390
1 2 4.75 04/16/1998 7 89330 3160
Average 3280
1 3 4.75 05/07/1998 28 120220 4250
I 4 4.75 05/07/1998 28 123120 4350
Average 4300
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc writt ;n approval of HBC Engineering, Inc.
01AK Page I of 5
CONCRETE COMP IVE STRENGTH TES
8901 Carpenter grwy., Suite #100
Dallas, Texas 75247
Date of Service: 04/09/1998 Report No.: 9809332 Report Date
05/08/1998
Client No.: 52617000 Project No.: 43-2452-~7
Client: Lincoln Property Company Project: Coppell I: usiness Center II
3300 Lincoln Plaza/Larry Moon Belt Line Rd. & Lakeshore Dr.
500 North Akard Street
Dallas TX 75201-3394 Coppell, ~?exas
Services: Obtain samples of fresh concrete at the placement locations, perform require field test and cast
compressive strength samples.**
PROJECT DATA
CONTRACTOR: Butler Construction CONCRETE CLASS: 9349
CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/09/1998 BATCH TIME: 7:00 am
PLANT: 22 TIME SAMPLED: 7:25 am BY: D~ non Elrod
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear, wit dy
STRENGTH: 4000 psi @ 28 Days TEMPERATURE (g)-AIR 52 E CO ~CRETE: 80 F
SLUMP: 5" TRUCK NO: 867 TICKE'I NO: 640457
AIR: N/A AIR CONTENT (%): N/A UNI'I WEIGHT (pet): N/A
TEST METHOD: ASTM C- ! 43 PLACEMENT LOCATION:
See page 1
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: G-2.5
REPORT OF TESTS ACC IMULATrVE YaRns: 120
CYLINDER MEASURED MAXIMUM C 'MPRESSIVE
MARKED SLUMP DATE AGE LOAD ;TRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
2 I 4.50 04/16/1998 7 96200 3400
2 2 4.50 04/16/I 998 7 91310 3230
Average 3320
2 3 4.50 05/07/1998 28 119300 4220
2 4 4.25 05/07/1998 28 123650 4370
Average 4300
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt :n approval of HBC Engineering, Inc.
01AK Page 2 of 5
CONCRETE COMPRFf'3IVE STRENGTH TESe"
ENGINEF. RII~, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
Date of Service: 04/09/1998 Report No.: 9809332
05/08/1998
Client ]No.: 52617000 Project No.: 43-2452-! )7
Client: Lincoln Property Company Project: Coppell F usiness Center II
3300 Lincoln Plaza/Larry Moon Belt Line Rd. & Lakeshore Dr.
500 North Akard Street
Dallas TX 75201-3394 Coppell, ?exas
Services: Obtain samples of fresh concrete at the placement locations, perform require field test and east
compressive strength samples.**
PROJECT DATA
CONTRACTOR: Butler Construction CONCRETE CLASS: 9349
CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/09/1998 BATCH TIME: 9:12 am
PLANT: 22 TIME SAMPLED: 9:40 am BY: Df non Elrod
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny
STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)-AIR 62 F CONCRETE: 80 F
SLUMP: 5" TRUCKNO: 846 TICKEI NO: 640486
AIR: N/A AIR CONTENT (%): N/A UNn'WEIGHT (pc0: N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
See page 1
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: G-5.5
REPORT OF TESTS ACCUMULATIVE YARDS: 270
CYLINDER MEASURED MAXIMUM £ OMPRESSIVE
MARKED SLUMP DATE AGE LOAD ;TRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
3 1 5.50 04/16/1998 7 91210 3230
3 2 5.50 04/16/1998 7 97810 3460
Average 3350
3 3 5.50 05/07/1998 28 121960 4310
3 4 5.50 05/07/1998 28 119380 4220
Average 4270
Note: Contractor notified of slump.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writl .'n approval of HBC Engineering, Inc.
01AK Page 3 of 5
CONCRETE COMPRFf IVE STRENGTH
8901 Carpenter grwy., Suite #100
Dallas, Texas 75247
Date of Service: 04/09/1998 Report No.: 9809332 Report Date
05/08/1998
Client No.: 52617000 Project No.: 43-2452-~ 7
Client: Lincoln Property Company Project: Coppell Business Center II
3300 Lincoln Plaza/Larry Moon Belt Line Rd. & Lakeshore Dr.
500 North Akard Street
Dallas TX 75201-3394 Coppell, 'exas
Services: Obtain samples of fresh concrete at the placement locations, perform requir{ 1 field test and cast
compressive strength samples.**
PROJECT DATA
CONTRACTOR: Butler Construction CONCRETE CLASS: 9349
CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/09/1998 BATCH TIME: 10:15 am
PLANT: 22 TIME SAMPLED: 10:40 am BY: Damon Elrod
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny
STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (V)-AIR 63 F COI~CRETE: 80 F
SLUMP: 5" TRUCK NO: 841 TICKET NO: 640501
AIR: N/A AIR CONTENT (%): N/A uNrr WEIGHT (pc0: N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
See page 1
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: H-6.5
REPORT OF TESTS ACCU~,.,~XrVE YARDS: 350
CYLINDER MEASURED MAXIMUM C~ )MPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
4 1 4.75 04/16/1998 7 102230 3620
4 2 4.75 04/16/1998 7 99230 3510
Average 3570
4 3 4.75 05/07/1998 28 116440 4120
4 4 4.75 05/07/1998 28 118400 4190
Average 4160
This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the writt~ approval of HBC Engineering, Inc.
01AK Page 4 of 5
CONCRETE COMPRE 'NIVE STRENGTH TES ' ,
ENGINEF. RII~, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
Date of Service: 04/09/1998 Report No.: 9809332
05/08/1998
Client No.: 52617000 Project No.: 43-24524~7
Client: Lincoln Property Company Project: Coppell E usiness Center II
3300 Lincoln Plaza/Larry Moon Belt Line Rd. & Lakeshore Dr.
500 North Akard Street
Dallas TX 75201-3394 Coppell, ?exas
Services: Obtain samples of fresh concrete at the placement locations, perform requir~ field test and cast
compressive strength samples.**
PROJECT DATA
CONTRACTOR: Butler Construction CONCRETE CLASS: 9349
CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/09/1998 BATCH TIME: 12:25 pm
PLANT: 22 TIME SAMPLED: 12:30 pm BY: Da non Elrod
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny
STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)- AIR 68 g CO ~ICRETE: 80 F
SLUMP: 5" TRUCKNO: 867 'rICKEZ NO: 640530
AIR: N/A AIR CONTENT (%): N/A UNrl WEIGHT (pcf}: N/A
TEST METHOD: ASTM C-143 PLACEMENT LOCATION:
See page 1
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: G.5-8.5
REPORT OF TESTS ACCUMULATIVE YARDS: 490
CYLINDER MEASURED MAXIMUM C DMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
5 1 5.00 04/16/1998 7 116230 4110
5 2 5.00 04/16/1998 7 115340 4080
Average 4100
5 3 5.00 05/07/1998 28 124860 4420
5 4 5.00 05/07/1998 28 128590 4550
Average 4490
Technician: Damon Elrod Started: 3:00 am Finished: 5:00 pm H~~'lnc.
Report Distribution:
(1) Lincoln Property Company (I) City of Coppell/BIdg. Insp.
(1) Butler Construction (I) City of Coppell/Constr. Insp. E~ lgene Harbour
(1) O'Brien & Associates (I) Mullen & Powell Teehnistructures Vice President
(1) AECC, Inc.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt~ :n approval of HBC Engineering, Inc.
01AK Page 5 of 5
LOW PRESSURE Alii TEST FOR GIL4,VI'FY SANITARY SE ER
F. ach section of sewer shall be tested between successive manholes.
Air shall be introduced into the pipeline until 4.0 psi gauge pressure has been reached. At that tinge the flow of ak shall be
~educcd and the internal air pressure shall be mainlained between 3.5 and 4.5 psi gauge for at leas two (2) minutes to atlow
the air temperature to come to equilibrium with the temperature of tim pipe walls. Pressure in thc pipe shall be constantly
monitored by a gauge and hose arrangement separate from the hose used to introduce air into the line. Pressure |11 the
pipe shall not be allowed to exceed 5 psi.
Aftcr the temperature has stabilized and no air leaks at the plugs have been found, the air pressur~ shall be used to
determine the time lapse required for the air pressure to drop to 2.5 psi gauge.
If the thue lapse required for the air pressure to decrease form 3.5 to 2.5 psi exceeds that shown i~ the following table, the
pipe shall be presumed to be vdthin acceptable I/mits [or leakage.
If the thne lapsed is less than that shown h~ the table, the contractor shall make corrections to red :ce the leakage to
accel,table limits.
by: */--t-- , of Li~e One, Inc.