Loading...
Northlake 635(3)-LR 980511CONCRETE COMPRF IVE STRENGTH TES_ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/10/1998 Report No.: 9809422 Report Date 05/11/1998 Client No.: 52617000 Project No.: 43-2452-~7 Client: Lincoln Property Company Project: Coppell Business Center II 3300 Lincoln Plaza/Larry Moon Belt Line ?~d. & Lakeshore Dr. 500 North Akard Street Dallas TX 75201-3394 Coppell, 'exas Services: Obtain samples of fresh concrete at the placement locations, perform requir( I field test and cast compressive strength samples.** PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9349 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/10/1998 BATCH TIME: 7:25 am PLANT: 16 TIME SAMPLED: 7.'55 am BY: Damon Elrod SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny STRENCTH: 4000 psi ~ 28 Days TEMPERATURE (l~-AIR 66 ~ COI~CRETE: 90 1~ SLUMP: 5" TRUC~:NO: 654 TICKET NO: 702257 AIR: N/A AIR CONTENT (%): N/A UNrr WEIGh-IT (0¢0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Building D slab, D-F & 1-9 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: D.5-8.5 REPORT OF TESTS ACC [/MULATIVE YARDS: 70 CYLINDER MEASURED MAXIMUM CI )MPRESSIVE MARKED SLUMP DATE AGE LOAD ;TRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 5.00 04/17/1998 7 97990 3470 I 2 5.00 04/17/1998 7 92730 3280 Average 3380 1 3 5.00 05/08/1998 28 113220 4000 I 4 5.00 05/08/1998 28 115170 4070 Average 4040 This report is exclusively for thc use of thc client indicated above and shall not be reproduced except in full without the wriR~ n approval of HBC Engineering, Inc. 01 Page I of 5 CONCRETE COMP IVE STRENGTH TES" _ ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/10/1998 Report No.: 9809422 Report Date 05/11/1998 Client No.: 52617000 Project No.: 43-2452-~7 Client: Lincoln Property Company Project: Coppell usiness Center II 3300 Lincoln Plaza/Larry Moon Belt Line Rd. & Lakeshore Dr. 500 North Akard Street Dallas TX 75201-3394 Coppell, 'exas Services: Obtain samples of fresh concrete at the placement locations, perform require field test and east compressive strength samples.** PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9349 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/10/1998 BATCHTIME: 8:33 am PLANT: 16 TIME SAMPLED: 8:55 am aY: Da aon Elrod SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F) - AIR 67 F CO]qCRETE: 96 V SLUMP: 5" TRUCK NO: 841 TICKET NO: 640609 A~R: N/A A~R CO,rENT (%): N/A UNIT WEIGHT (PC0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: E.5-7.5 REPORT OF TESTS ACC 3MULATIVE YARDS: 180 CYLINDER MEASURED MAXIMUM C~ )MPRESSIVE MARKED SLUMP DATE AGE LOAD ~TRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 5.50 04/17/1998 7 91020 3220 2 2 5.50 04/17/1998 7 95270 3370 Average 3300 2 3 5.50 05/08/1998 28 110690 3910 2 4 5.50 05/08/1998 28 112010 3960 Average 3940 This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the writte ~ approval of HBC Engineering, Inc. 01 Page 2 of 5 CONCRETE COMP IVE STRENGTH TES 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/10/1998 Report No.: 9809422 Report Date 05/11/1998 Client No.: 52617000 Project No.: 43-2452-~. ~7 Client: Lincoln Property Company Project: Coppell E usiness Center II 3300 Lincoln Plaza/Larry Moon Belt Line Rd. & Lakeshore Dr. 500 North Akard Street Dallas TX 75201-3394 Coppell, ?exas Services: Obtain samples of fresh concrete at the placement locations, perform requir~ field test and cast compressive strength samples.** PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9349 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/10/1998 BATCH TIME: N/A PLANT: 16 TIME SAMPLED: 9:15 am BY: Da aon Elrod SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)- AIR 68 V CO: ~ICRETE: 96 SLUMP: 5" TRUCK NO: 760 TICKET NO: 640612 AIR: N/A AIR CONTENT (%): N/A UNIX WEIGHT (pcO: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: E--6.5 REPORT OF TESTS AC~ :UMULATIVE YARDS: 220 CYLINDER MEASURED MAXIMUM C i)MPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 5.50 04/17/1998 7 86650 3060 3 2 5.50 04/17/1998 7 88200 3120 Average 3090 3 3 5.50 05/08/1998 28 116190 4110 3 4 5.50 05/08/1998 28 120600 4260 Average 4190 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri~ approval of HBC Engineering, Inc. 01 Page 3 of 5 CONCRETE COMPRK IVE STRENGTH TES ENGIHEERIF~, 1NC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/10/1998 Report No.: 9809422 Report Date 05/11/1998 Client No.: 52617000 Project No.: 43-2452-~ Client: Lincoln Property Company Project: Coppeli l~ usiness Center II 3300 Lincoln Plaza/Larry Moon Belt Line Rd. & Lakeshore Dr. 500 North Akard Street Dallas TX 75201-3394 Coppell, ?exas Services: Obtain samples of fresh concrete at the placement locations, perform requir~ field test and cast compressive strength samples.** PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9349 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/10/1998 BATCH TIME: 9:43 am PLANT: 16 TIME SAMPLED: 9:55 am BY: D* non Elrod SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F) - AIR 70 F CO~/CRETE: 100 F SLUMP: 5" TRUCKNO: 728 TICK~ NO: 702266 AiR: N/A AIR CONTEMPT (%): N/A UNn WEIGHT (pc0: N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: E.5-5 REPORT OF TESTS ACCUMULATIVE YARDS: 380 CYLINDER MEASURED MAXIMUM C {)MPRESSIVE MARKED SLUMP DATE AGE LOAD ~"TRENGTH FRACTURE SET NO. (inche~) TESTED (days) (lbs. force) (psi) TYPE 4 1 6.50 04/17/1998 7 82600 2920 4 2 6.50 04/17/1998 7 85090 3010 Average 2970 4 3 6.50 05/08/1998 28 112400 3970 4 4 6.50 05/08/1998 28 109520 3870 Average 3920 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt m approval of HBC Engineering, Inc. 01 Page 4 of 5 CONCRETE COMPRY"SIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/10/1998 Report No.: 9809422 Report Date 05/11/1998 Client No.: 52617000 Project No.: 43-2452-' ~7 Client: Lincoln Property Company Project: Coppell E usiness Center II 3300 Lincoln Plaza/Larry Moon Belt Line Rd. & Lakeshore Dr. 500 North Akard Street Dallas TX 75201-3394 Coppell, ?ex,as Services: Obtain samples of fresh concrete at the placement locations, perform requir~ field test and east compressive strength samples.** PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9349 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/10/1998 BATCHTIME: 9:58 am PLA~r: 16 TIME SAMPLED: 10:05 am BY: Da aon Elrod SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (~-AIR 72 F COIqCRETE: 98 F SLUMP: 5" TaUCK NO: 853 TICKET NO: 640632 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf/: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: D.5-2.5 REPORT OF TESTS ACC JMULATIVE YARDS: 470 CYLINDER MEASURED MAXIMUM C' )MPRESSIVE MARKED SLUMP DATE AGE LOAD ~TRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 1 5.50 04/17/1998 7 82830 2930 5 2 5.50 04/17/1998 7 80680 2850 Average 2890 5 3 5.50 05/08/1998 28 114570 4050 5 4 5.50 05/08/1998 28 115710 4090 Average 4070 Technician: Damon EIrod Started: 5:00 am Finished: 2:00 pm ~ Enoin,~no. inc,~ Report Distribution: (!) Lincoln Propen'y Company (1) City o£Coppell/BIdg. Insp. ( I } Butler Construction ( 1 ) City of Coppell/Constr. Insp. (I} O'Bricn & Associates (1) Mullen & Powell Tcchnistructures (I} AECC, lac. This report is exclusively for thc usc of the client indicated above and shall not be reproduced except in full without the writte 1 approval of HBC Engineering, Inc. 01 Page 5 of 5 CONCRETE COMP IVE STRENGTH TES? 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/22/1998 Report No.: 9810350 Report Date 05/I 1/1998 Client No.: 52617000 Project No.: 43-2452-~7 Client: Lincoln Property Company Project: Coppell Business Center II 3300 Lincoln Plaza/Larry Moon Belt Line R.d. & Lakeshore Dr. 500 North Akard Street Dallas TX 75201-3394 Coppell, 'eTas Services: Obtain samples of fresh concrete at the placement locations, perform require I field test and cast compressive strength samples.** PROJECT DATA co~rRAcroR: Butler Construction CONCRE~ CLASS: 9337 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/22/1998 BATCH TIME: 5:18 am PLANT: 16 TIME SAMPLED: 5:46 am BY: Br an Otis SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear, mil. STRENGTH: 3500 psi ~ 28 Days TEMPERATURE (F) - AIR 62 F COl CRETE: 68 F SLUMP: 5" TRUCK NO: 1827 TICKET NO: N/A AIR: N/A AIR CONTENT (%): N/A oNrr WEiGtrr (pc0: N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Panels 38, 42, 40, 78, 79, 64, 12, 5, 1, 2, 15, 11 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Panel 64 REPORT OF TESTS ACC UMULATIVE YARDS: 40 CYLINDER MEASURED MAXIMUM C 2)MPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 5.50 04/29/1998 7 120200 4250 I 2 5.50 04/29/1998 7 123340 4360 Average 4310 I 3 5.50 05/20/1998 28 1 4 5.50 05/20/1998 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ~ :n approval of HBC Engineering, Inc. 01AK Page 1 of 2 CONCRETE COMPRF' IVE STRENGTH TES_ ENGINEF~I~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/22/1998 Report No.: 9810350 Report Date 05/11/1998 Client No.: 52617000 Project No.: 43-2452-97 Client: Lincoln Property Company Project: Coppell B Jsiness Center II 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Belt Line l~,d. & Lakeshore Dr. Dallas TX 75201-3394 Coppell, ~I exas Services: Obtain samples of fresh concrete at the placement locations, perform requirex field test and east compressive strength samples.** PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9337 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DAT~: 04/22/1998 BATCHTIME: 6:30 am Pt~,~r: 16 TIME SAMPLED: 7:20 am aY: Brian Otis SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear, mik STRENGTH: 3500 psi ~ 28 Days TEMPERATURE (F)- AIR 66 F COn ~CRETE: 72 F SLUMP: 5" TRUCK NO: 1827 TICKET 140: N/A AIR: N/A AIR CONT~.NT (%): N/A UNIT WEIG~rl' (pet}: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Panel I REPORT OF TESTS AccI IMULATIVE YARDS: 140 CYLINDER MEASURED MAXIMUM C( ~MPRESSIVE MARKED SLUMP DATE AGE LOAD ;TRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 6.00 04/29/1998 7 102340 3620 2 2 6.00 04/29/1998 7 106410 3760 Average 3690 2 3 6.00 05/20/1998 28 2 4 6.00 05/20/1998 28 Technician: Brian Otis Started: 3:00 am Finished: 9:00 am ----v~ IF. noln,~J~iC. Report Distribution: (1) Lincoln Property Company (I) City of Coppcll/Bldg. lnsp. (I) Butler Construction (l) City ofCoppell/Constr, lnsp. EU gene Harbour (1) O'Brien & Associates (I) Mullcn & Powell Technistmctures ~'ice President (1) AECC, Inc. This report is cxclusivcly for thc usc of the client indicated above and shall not be reproduced except in full without thc writte ~ approval of HBC Engineering, Inc. 01AK Page 2 of 2