Loading...
Northlake 635(3)-LR 980512CONCRETE COMP IVE STRENGTH TES? 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 04/13/1998 Report No.: 9809597 05/12/1998 Client No.: 52617000 Project No.: 43-2452-~7 Client: Lincoln Property Company Project: Coppell E usiness Center II 3300 Lincoln Plaza/Larry Moon Belt Line Rd. & Lakeshore Dr. 500 North Akard Street Dallas TX 75201-3394 Coppell, ~?exas Services: Obtain samples of fresh concrete at the placement locations, perform require field test and cast compressive strength samples.** PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CraSS: 9349 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/13/1998 BATCHTIME: 7:51 am PLANT: 16 (on site) TIME SAMPLED: 8:15 am BY: De Ratliff SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cool, clot ly, windy STR~GT~t: 4000 psi ~ 28 Days TEMPERATURE ~)- Am 66 F CO~CRETE: 73 V SLUMP: 5" TRUCKNO: 853 TICKE'~ NO: 702278 AIR: N/A AIR CONTENT (%): N/A in,ri WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Slab-on-grade, Building D from lines B to D an~ I to 9 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 5'E/10~N of D/8 REPORT OF TESTS ACC .IMULATIVE YARDS: 70 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 7.00 04/20/1998 7 93570 3310 I 2 7.00 04/20/1998 7 101180 3580 Average 3450 1 3 7.00 05/11/1998 28 118950 4210 1 4 7.00 05/11/1998 28 114780 4060 Average 4140 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt ,'n approval of HBC Engineering, Inc. 01AK Page I of 6 CONCRETE COMPR_F' SIVE STRENGTH TE _ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/13/1998 Report No.: 9809597 Report Date 05/12/1998 Client No.: 52617000 Project No.: 43-2452-! ;7 Client: Lincoln Property Company Project: Coppell [.usiness Center II 3300 Lincoln Plaza/Larry Moon Belt Line Rd. & Lakeshore Dr. 500 North Akard Street Dallas TX 75201-3394 Coppell, ?exas Services: Obtain samples of fresh concrete at the placement locations, perform require field test and cast compressive strength samples.** PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9349 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/13/1998 BATCH TIME: 9.' 12 am eLA~rr: 16 (on site) TIME SAMPLED: 9:25 am BY: Dc Ratliff SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cool, part cloudy, windy STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)- AIR 70 F CO qCRETE: 77 F SLUMP: 5" TRUCK NO: 853 TICKET NO: 702287 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: ASTM C- 172 See page 1 ASTM C-39 SAMPLE LOCATION: 5'N/5'E olD/7 REPORT OF TESTS ACC [JMULATIVE YARDS: 160 CYLINDER MEASURED MAXIMUM C~ )MPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 5.00 04/20/1998 7 108350 3830 2 2 5.00 04/20/1998 7 104800 3710 Average 3770 2 3 5.00 05/11 / 1998 28 147450 5210 2 4 5.00 05/11/1998 28 146160 5170 Average 5190 This report is exclusively for thc use of the clicnt indicated above and shall not be reproduced except in full without thc writte a approval of HBC Engineering, Inc. 01AK Page 2 of 6 CONCRETE COMPRF SIVE STRENGTH ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/13/1998 Report No.: 9809597 Report Date 05/12/1998 Client No.: 52617000 Project No.: 43-2452-!17 Client: Lincoln Property Company Project: Coppell l~,usiness Center II 3300 Lincoln Plaza/Larry Moon Belt Line Rd. & Lakeshore Dr. 500 North Akard Street Dallas TX 75201-3394 Coppell, ['exas Services: Obtain samples of fresh concrete at the placement locations, perform require field test and east compressive strength samples.** PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9349 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/13/1998 BATCH TIME: 10:42 am p~,NT: 16 (on site) TIME SAMPLED: 10:55 am BY: Dc Ratliff SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear, waJ n STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)-AIR 75 F CONCRETE: 78 F SLUMP: 5" TRUCK NO: 853 TICKE~ NO: 702297 AI~ N/A nIa CONTENT (%): N/A UNn WEIGHT (pc0: N/A TEST METHOD: AST]~ C-143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: D-5.75 REPORT OF TESTS ACC [MULATIVE YARDS: 260 CYLINDER MEASURED MAXIMUM C ~MPRESSIVE MARKED SLUMP DATE AGE LOAD ;~ENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 5.00 04/20/1998 7 121660 4300 3 2 5.00 04/20/1998 7 121020 4280 Average 4290 3 3 5.00 05/11/1998 28 161550 5710 3 4 5.00 05/11/1998 28 156050 5520 Average 5620 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ~ ~n approval of HBC Engineering, Inc. 01AK Page 3 of 6 CONCRETE COMPRY"SIVE STRENGTH TES .. ENGINEF_RII~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/13/1998 Report No.: 9809597 Report Date 05/12/1998 Client No.: 52617000 Project No.: 43-2452- '7 Client: Lincoln Property Company Project: Coppell usiness Center II 3300 Lincoln Plaza/Larry Moon Belt Line Rd. & Lakeshore Dr. 500 North Akard Street Dallas TX 75201-3394 Coppell, 'exas Services: Obtain samples of fresh concrete at the placement locations, perform require field test and cast compressive strength samples.** PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9349 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/13/1998 BATCH TIME: 11:40 am PLANT: 16 (on site) TIME SAMPLED: 12:00 pm BY: De Ratliff SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear, war rn STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)- AIR 80 F CO1 ~CRETE: 80 r SLUMP: 5" TRUCK NO: 756 TICKET ~O: 702304 AIR: N/A AIR CONTENT (%): N/A UNIT WEIG~rr (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: D-4.75 REPORT OF TESTS ACCi JMULATIVE YARDS: 330 CYLINDER MEASURED MAXIMUM C' )MPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 4.75 04/20/1998 7 122950 4350 4 2 4.75 04/20/1998 7 126480 4470 Average 4410 4 3 4.75 05/11/1998 28 144100 5100 4 4 4.75 05/11/1998 28 142140 5030 Average 5070 This report is exclusively for thc use of thc client indicated above and shall not be reproduced except in full without thc writte ~ approval of HBC Engineering, Inc. OIAK Page 4 of 6 ¢oscm t couem w IBC ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/13/1998 Report No.: 9809597 Report Date 05/12/1998 Client No.: 52617000 Project No.: 43-2452-c~ 7 Client: Lincoln Property Company Project: Coppell lq usiness Center II 3300 Lincoln Plaza/Larry Moon Belt Line Rd. & Lakeshore Dr. 500 North Akard Street Dallas TX 75201-3394 Coppell, 'exas Services: Obtain samples of fresh concrete at the placement locations, perform requirt field test and cast compressive strength samples.** PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9349 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/13/1998 BATCH TIME: 12:55 pm rLANT: 16 (on site) TIME SAMPLED: 1:10 pm BY: Dc Ratliff SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear, warm STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (Ir)- AIR 85 ir CO:qCRETE: 79 ir SLUMr: 5" TRUCKNO: 756 TICKET NO: 702314 AIR: N/A Am CONTENT (%): N/A UNYI WEIGHT (pcl): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page l ASTM C- 172 ASTM C-39 SAMPLE LOCATION: D-3.75 REPORT OF TESTS ACCUMULATIVE YARDS: 430 CYLINDER MEASURED MAXIMUM C i)MPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 1 4.50 04/20/1998 7 122420 4330 5 2 4.50 04/20/1998 7 126230 4460 Average 4400 5 3 4.50 05/11/1998 28 158450 5600 5 4 4.50 05/11/1998 28 151810 5370 Average 5490 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt~ :n approval of HBC Engineering, Inc. 01AK Page 5 of 6 CONCRETE COMP IVE STRENGTH TES _ ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/13/1998 Report No.: 9809597 Report Date 05/12/1998 Client No.: 52617000 Project No.: 43-2452-~.,7 Client: Lincoln Property Company Project: Coppell E usiness Center II 3300 Lincoln Plaza/Larry Moon Belt Line Rd. & Lakeshore Dr. 500 North Akard Street Dallas TX 75201-3394 Coppell, ?exas Services: Obtain samples of fresh concrete at the placement locations, perform requin field test and cast compressive strength samples.** PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9349 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/13/1998 BATCH TIME: 2.' 15 pm PLANT: 16 (on site) TIME SAMPLED: 3.'00 pm BY: De Ratliff SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear, wa~ n STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F}- AIR 85 F CO ~CRETE: 78 F SLUMP: 5" TRUCK NO: 752 TICKET NO: 702321 AIR: N/A AIR CONTENT (%): N/A UNI'I WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Sec page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: C.75-1.75 REPORT OF TESTS ACC UMULATIVE YARDS: 500 CYLINDER MEASURED MAXIMUM C ~)MPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 6 1 5.25 04/20/1998 7 115160 4070 6 2 5.25 04/20/1998 7 112880 3990 Average 4030 6 3 5.25 05/11/1998 28 162080 5730 6 4 5.25 05/11/1998 28 153220 5420 Average 5580 Additional technician: Eddie Elrod 10:00 am to 3:30 pm Technician: Dcl Ratliff Started: 6:00 am Finished: 10:00 -- _~ Engineering. Report Distribution: (1 } Lincoln Prop~rt~ Company ( I ) City of Coppell/BIdg. Insp. (1) Butler Construction (I) City ofCoppell/Constr. Insp. E~ lgene Harbour (l) O'Brien & Associates (I) Mullen & Powell Technistructures Vice President (1) AECC, lne. This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without thc writt~ :n approval of HBC Engineering, Inc. 01AK Page 6 of 6