Loading...
Northlake 635(3)-LR 980513 I=1 ii!:: iii: I:1 I JI:OTECHNIC^L AND ~ ~ I"'"'I U ~ EN¥1RONMEI 4TAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Northpointe Drive Highway 121 to Northpointe Drive Coppell, Texas REPORTED TO: Emerson Partners, Inc REPORT NO. 16 10005 Technology Boulevard, West REG PR¢,JECT NO. 4043 Suite 151 SAMPLE DATE: 05-13-98 Dallas, Texas 75220 TECHNICIAN: H. Johnson ATTN: Mr. Jim McEIroy CONTRACTOR: North Texas Contracting, Inc. Location of Sample I Junction box at Service Rd. and North Point Drive N/I J Intersection I Design Information I 1 Lattimore 42 3000 I Test Results 1 1441 05-20-98 7 109240 3870 1441 05-20-98 7 111220 3940 3910 1441 06-10-98 28 134750 4770 1441 06-10-98 28 130250 4610 4690 Cylinder Data I1 1441 4.50 84 87 5.2 3:2 (~'~'i~i '~0'5;1' ;1~I Distribution: (1) Emerson Partners, Inc./ Submitted by: Mr. Jim McEIroy (1) Rust, Inc./Mr. Andre P. Taylor REED ENGINEEF[ING GROUP, INC. (1) North Texas Contracting, Inc. Mr. Robert Farrow Original Signed 3y (1) City of Coppell/Mr. Larry Davis Keith E. Atkins KEA/ajw 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] ,0 0019