Northlake 635(3)-LR 980515CONCRETE COMPREt'SIVE STRENGTH TES
Date of Service: 04/15/1998
Client No.: 52617000
Client:
Services:
SLUMP:
AIR:
TEST METHOD:
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9809789
Project No.: 43-2452-~
Project: Coppell B
Belt Line
Coppeil,
Obtain samples of fresh concrete at the placement locations, perform require
compressive strength samples.**
Butler Construction
Pioneer Concrete
16
CONTRACTOR:
CONCRETE SUPPLIER:
PLANT:
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi ~ 28 Days
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
DATE
TESTED
04/22/1998
04/22/1998
05/13/1998
05/13/1998
9809788.
SAMPLE LOCATION: Q/3.5 & Q/4.0
Started:
PROJECT DATA
CONCRETE CLASS: 9337
PLACEMENT DATE: 04/15/1998
TIME SAMPLED: 12:45 pm BY: Ge
(1) City ofCoppcll/Bldg. Insp.
(!) City of Coppell/Constr. insp.
(I) Mullen & Powell Technistructures
01AK
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
1 1 5.25
1 2 5.25
1 3 5.25
I 4 5.25
Technician time on report
Technician: George Baxter
Report Distribution:
(I) Lincoln Property Company
(I) Butler Construction
(l) O'Brien & Associates
(!) AECC, inc.
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCKNO: 1884
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Piers
REPORT OF TESTS
Partly clot
75 F co]
TICKET
UNIT
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 91050
7 88450
Average
28 120490
28 116380
Average
Finished:
ACC
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
05/15/1998
usiness Center II
Kd. & Lakeshore Dr.
'exas
field test and cast
BATCHTIME: 12:00 pm
)rge Baxter
tdy
4CRETE: 79 V
NO: 702423
WEIGHT (pc0: N/A
3MULATIVE YARDS:
}MPRESSIVE
STRENGTH
(psi)
3220
3130
3180
4260
4120
4190
H~Eg~nc'
Vice President
230
FRACTURE
TYPE
This report is exclusively for the use of the client indicated above and shall not bc reproduced except in full without the writt~
Page I of I
n approval of HBC Engineering, Inc.