Loading...
Northlake 635(3)-LR 980518CONCRETE COMPREr IVE STRENGTH TES Date of Service: 04/16/1998 Report No.: 9809887 Client No.: 52617000 Project No.: 43-2452-[ Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppell B Belt Line Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 10 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 04/16/1998 TIME SAMPLED: 1:45 pm BY: Br WEATHER CONDITIONS: Cloudy, r~ TEMPERATURE (F) - AIR 70 r co~ TRUCK NO: 514 TICKET AIR CONTENT (°,4): N/A UNIX PLACEMENT LOCATION: Piers, Building C SAMPLE LOCATION: 7-P.5, 7-P, I-Q CYLINDER MARKED SET NO. MEASURED SLUMP DATE (inches) TESTED I 1 6.50 04/23/1998 I 2 6.50 04/23/1998 1 3 6.50 05/14/1998 1 4 6.50 05/14/1998 Note: Samples taken directly from truck. Technician time on report 9809886. REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 7 117250 7 119410 Average 28 153630 28 146440 Average ACC C Technician: Brian Otis Report Distribution: (I) Lincoln Property Company (I) Buffer Construction (I) O'Brien & Associates (I) AECC, Inc. Started: Finished: (I) City ofCoppell/Bldg. Insp. (!) City of Coppell/Constr. Insp. (I) Mullen & Powell Technistructures This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the writ~ ENG~NG, ~I 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 05/18/1998 usiness Center II Rd. & Lakeshore Dr. 'exas I field test and cast BATCH TIME: 12:54 pm an Otis ild qCRETE: 75 F NO: N/A WEIGHT (pc0: N/A UMULATIVE YARDS: ~MPRESSIVE STRENGTH (psi) 4150 4220 4190 5430 5180 5310 10 FRA~URE TYPE ~l~g, Inc. ~ne Harbour Vice President approval of HBC Engineering, Inc. 01AK Page I of I CONCRETE COMPREr IVE STRENGTH TES Date of Service: 04/16/1998 Report No.: 9809880 Client No.: 52617000 Project No.: 43-24524 Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppell E Belt Line Coppell, 7 Services: Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 04/16/1998 TIME SAMPLED: 7:00 am BY: F~ WEATHER CONDITIONS: Partly cio TEMPERATURE (F)-AIR 55 F CO TRUCK NO: 1884 TICKE'! AIR CONTENT (%): N/A UNn PLACEMENT LOCATION: Building C, Panels 117, 118, !19, 120, 121, 122 SAMPLE LOCATION: Panel 120 CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 1 I 5.25 04/23/1998 7 110190 1 2 5.25 04/23/1998 7 109240 Average I 3 5.25 05/14/1998 28 133320 I 4 5.25 05/14/1998 28 128350 Average ACC C This report is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without thc writ~ 01AK Page 1 of 3 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 05/18/1998 ~7 usiness Center II Rd. & Lakeshore Dr. ?exas field test and cast BATCH TIME: 6:45 am lie Elrod ~dy, cool NCRETE: 65 F NO: 702431 'WEIGHT (pc0: N/A 123, 124, 3, 4, 6, 7, 8 ~MULATIVE YARDS: 60 OMPRESSIVE STRENGTH (psi) 3900 3860 3880 4710 4540 4630 FRACTURE TYPE :n approval of HBC Engineering, Inc. CONCRETE COMPRF IVE STRENGTH TES Date of Service: 04/16/1998 Report No.: 9809880 Client No.: 52617000 Project No.: 43-2452-! Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell l~ Belt Line Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT OATE: 04/16/1998 TIME SAMPLED: 8:45 am BY: F_~ WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 1884 AIR CONTENT (%}: N/A PLACEMENT LOCATION: See page I Partly cio 60 v c~ TICKE1 SAMPLE LOCATION: Panel 4 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 2 I 4.75 04/23/1998 2 2 4.75 04/23/1998 2 3 4.75 05/14/1998 2 4 4.75 05/14/1998 REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 7 102140 7 106630 Average 28 132810 28 128350 Average AC( This report is exclusively for the use of thc client indicated above and sl~all not be reproduced except in full without the wri~ 01AK Page 2 of 3 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 ~7 Report Date 05/18/1998 .usiness Center II Rd. & Lakeshore Dr. ['exas field test and cast BATCH TIME: 8-'05 am lie Elrod Jdy, cool NCRETE: 70 F No: 702441 'WEIGHT (pc0: N/A !UMULATIVE YARDS: OMPRESSIVE STRENGTH (psi) 3610 3770 3690 4700 4540 4620 160 FRACTURE TYPE en approval of HBC Engineering, Inc. CONCRETE COMPREr IVE STRENGTH TES'", Date of Service: 04/16/1998 Report No.: 9809880 Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 43-24524 Coppell E Belt Line Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requin compressive strength samples.** CONTRACTOR: CONCRETE SUPPLIER: PLANT: Butler Construction Pioneer Concrete 16 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 04/16/1998 TIME SAMPLED: 9:30 am BY: Ed 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 05/18/1998 usiness Center II Rd. & Lakeshore Dr. 'exas field test and cast BATCHTIME: 9:13 am ie Elrod SLUMP: AIR: TEST METHOD: SPECIFICATION REQ[JIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Panel 7 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 3 1 5.00 3 2 5.00 3 3 5.00 3 4 5.00 WEATHER CONDITIONS: Cloudy TEMPERATURE (F) - AIR 65 F CO: TRUCK NO: 514 TICKET AIR CONTENT (%): N/A UNrI PLACEMENT LOCATION: See page I REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 04/23/1998 7 118100 04/23/1998 7 113700 Average 05/14/1998 28 153350 05/14/1998 28 145870 Average Technician: Eddie Elrod Report Distribution: (1) Lincoln Property Company (I) Butler Construction (I) O'Brien & Associates (1) AECC, Inc. ACC C, Started: 5:00 am Finished: 11:00 ~ (1) City of Coppell/Bldg. Insp. (1) City of Coppell/Constr. Insp. (1) Mullen & Powell Technistructures El This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt{ qCRETE: 72 F NO: 702447 WEIGHT (pc0: N/A UMULATIVE YARDS: 220 )MPRESSIVE STRENGTH (psi) 4180 4020 4100 5420 5160 5290 Eng~Inc. ~gene Harbour Vice President FRACTURE TYPE approval of HBC Engineering, Inc. 01AK Page 3 of 3 CONCRETE COMPREr IVE STRENGTH TES Date of Service: 04/17/1998 Report No.: 9810004 Client No.: 52617000 Project No.: 43-2452-! Client: Lincoln Property Company Project: Coppell l~ 3300 Lincoln Plaza/Larry Moon Belt Line 500 North Akard Street Dallas TX 75201-3394 Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples.** CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 04/17/1998 TIME SAMPLED: 11:30 am BY: Br WEATHER CONDITIONS: Clear, mil TEMPERATURE (F) - AIR 56 F CO ~7 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 05/18/1998 .usiness Center II Rd. & Lakeshore Dr. ?exas SLUMP: AIR: TEST METHOD: SAMPLE LOCATION: H N/A ASTM C- 143 ASTM C- 172 ASTM C-39 I I-A, 1 I-D, I I-D.5 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 7.00 I 2 7.00 1 3 7.00 1 4 7.00 Technician time on report Technician: Brian Otis Report Distribution: (I) Lincoln Property Company (1) Butler Construction (i) O'Brien & Associates (1) AECC, Inc. TRUCK NO: 855 AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers, Building A TICKET UNFI REPORT OF TESTS ACC MAXIMUM C DATE AGE LOAD TESTED (days) (lbs. force) 04/24/1998 7 104650 04/24/1998 7 102730 Average 05/15/1998 28 129290 05/15/1998 28 124670 Average 9810003. Started: Finished: (I) CiW ofCoppell/Bldg, lnsp. (1) City ofCoppell/Constr, lnsp. (1) Mullen & Powell Technistructures El This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc writtc field test and cast BATCHTIME: 10'50 am In Otis CRETE: 75 g NO: N/A WEIGHT (pc0: N/A UMULATIVE YARDS: ~)MPRESSIVE STRENGTH (psi) 3700 3630. 3670 4570 4410 4490 Eng~ Inc. tgene Harbour Vice President 10 FRACTURE TYPE approval of HBC Engineering, Inc. 01AK Page I of 1 CONCRETE COMP IVE STRENGTH TES Date of Service: 04/17/1998 Report No.: 9810002 Client No.: 52617000 Project No.: 43-2452-! Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell E Belt Line Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir{ compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi @ 28 Days 5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 04/17/1998 TIME SAMPLED: 7:00 am BY: Bt WEATHER CONDITIONS: TEMPERATURE (F} - AIR TRUCK NO: 842 AIR CONTENT (%): N/A PLACEMENT LOCATION: Panels 9, 10, 20-37, 43, 44 Clear, mil 54 g cc TICKE1 SAMPLE LOCATION: Panel 21 CYLINDER MARKED SET NO. Note: load. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) AC( 1 I 4.50 04/24/1998 7 113670 I 2 4.50 04/24/1998 7 117750 Average 1 3 4.50 05/15/1998 28 143610 1 4 4.50 05/15/1998 28 146800 Average Contractor controlled water. 30 to 50 gallons of water was ad Concrete was batched on site. All samples taken from truck. This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without thc wriV 01AK Page I of 3 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 05/18/1998 ,usiness Center II Rd. & Lakeshore Dr. [~exas field test and cast BATCH TIME: 6:38 am ian Otis d NCRETE: 74 F NO: N/A 'WEIGHT (pc0: N/A !UMULATIVE YARDS: 70 OMPRESSIVE STRENGTH (mi) 4020 4160 4090 5080 5190 5140 ded to each FRACTURE TYPE en approval of HBC Engineering, Inc. CONCRETE COMPRF IVE STRENGTH TES'"' Date of Service: 04/17/1998 Report No.: 9810002 Client No.: 52617000 Project No.: 43-24524 Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppell lq Belt Line Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples.** STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: ] 6 SPECIFICATION REQUIREMENTS 3500 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMEWr OATE: 04/17/1998 TIME SAMPLED: 8248 am BY: Br WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 857 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page 1 Clear, mil 56 V CO TICKE'I UNI1 SAMPLE LOCATION: Panel 26 REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 2 1 8.00' 04/24/1998 7 2 2 8.00 * 04/24/1998 7 2 3 8.00' 05/15/1998 28 2 4 8.00* 05/15/1998 28 Note: See page 1. 50 gallons of water added to this 84400 85430 Average 102910 107140 Average load. ACC £ This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writl 01AK Page 2 of 3 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 05/18/1998 usiness Center II Rd. & Lakeshore Dr. ?exas field test and cast BATCH TIME: 7:49 am in Otis CRETE: 74 V NO: N/A WEIGHT (pc0: N/A UMULATIVE YARDS: OMPRESSIVE STRENGTH (psi) 2980 3020 3000 3640 3790 3720 160 FRACTURE TYPE en approval of HBC Engineering Inc. CONCRETE COMP IVE STRENGTH TES Date of Service: 04/17/1998 Report No.: 9810002 Client No.: 52617000 Project No.: 43-2452-~ Client: Lincoln Property Colnpany Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppeil E Belt Line Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir~ compress ive strength samples.* * SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTh: 3500 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT OATE: 04/17/1998 TIME SAMPLED: 10:55 am BY: Br WEATHER CONDITIONS: TEMPERATURE (F} - AIR TRUCK NO: 842 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page ! Clear, mil 55 F co TICKEI UNrl SAMPLE LOCATION: Panel 35 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 3 1 7.00* 04/24/1998 3 2 7.00* 04/24/1998 3 3 7.00* 05/15/1998 3 4 7.00* 05/15/1998 * Note: See page 1. 40 gallons of Technician time on report 9810003. REPORT OF TESTS water MAXIMUM AGE LOAD (days) (lbs. force) 7 101720 7 99620 · Average 28 130870 28 124670 Average added to this load. AC( £ Technician: Brian Otis Report Distribution: (1) Lincoln Property Company (I) Butler Construction (i) O'Brien & Associates (I) AECC, Inc. Started: Finished: (I) City of Coppell/Bldg. Insp. (I) City of Coppell/Constr. Insp. (I) Mullen & Powell Technistructures This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 05/18/1998 ,7 usiness Center II Rd. & Lakeshore Dr. ?exas field test and cast BATCH TIME: 10:00 am ~n Otis d NCRETE: 75 F NO: N/A 'WEIGHT (pcf): N/A UMULATIVE YARDS: 280 OMPRESSIVE STRENGTH (psi) 3600 3520 3560 4630 4410 4520 FRACTURE TYPE Enginee.~nc. ugene Harbour Vice President en approval of HBC Engineering, Inc. 01AK Page 3 of 3