Northlake 635(3)-LR 980527CONCRETE COMPRr SIVE STRENGTH
Date of Service:
Client No.:
Client:
05/18/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 981269'
Project No.: 43-245~
Project: Coppell
Belt Lil
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
3-5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 05/I 8/1998
TIME SAMPLED: 4:45 am BY:
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 70 F (
TRUCK NO: 847 TICIC
AIR CONTENT (%): 4.1 ur
PLACEMENT LOCATION:
Paving, north side of Building C
SAMPLE LOCATION: 80'N/bldg. at G line
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (i Aches) TESTED
1 I 9.00* 05/25/1998
1 2 9.00* 05/25/1998
REPORT OF TESTS
MAXIMUM
AG E LOAD
(days) (lbs. force)
7 86250
7 89330
Average
1 3 9.00* 06/15/1998 28
I 4 9.00* 06/15/1998 28
A~
Note: Contractor added water.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the s
01AK Page ! of 10
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
,97
Report Date
05/27/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 4:43 am
dark Apodaca
:ONCRETE: 82 F
;TNO: 712133
IT WEIGHT (pc0: N/A
2CUMULATIVE YARDS: 70
COMPRESSIVE
STRENGTH
(psi)
3050
3160
3110
FRACTURE
TYPE
ittcn approval of HBC Engineering, Inc.
CONCRETE COMPR ' SIVE STRENGTH TE?f
Date of Service: 05/18/1998 Report No.: 981269!
Client No.: 52617000 Project No.: 43-2452
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppell
Belt Lin
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform reqm~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
3-5"
3-6%
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 05/18/1998
TIME SAMPLED: 5:41 am BY:
WEATHER CONDITIONS: Partly
TEMPERATURE (F} - AIR 73
TRUCK NO: 730
AIR CONTENT (%): 4.3
PLACEMENT LOCATION:
See page i
SAMPLE LOCATION: 45'N/bldg. at F line
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
2 I 7.00* 05/25/1998
2 2 7.00* 05/25/1998
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 108180
7 102340
Average
2 3 7.00* 06/15/1998 28
2 4 7.00* 06/15/1998 28
* Note: See page 1
This report is exclusively for the use of the client indicated above and shall not be reproducexl except in full without the
01AK Page 2 of 10
.97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
05/27/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
FRACTURE
TYPE
itten approval of HBC Engineering, Inc.
BATCHTIME: 5:35 am
4ark Apodaca
oudy
F ( ONCRETE: 80 F
TICm:T NO: 712141
UN IT WEIGHT (PC0: N/A
AC :CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
3830
3620
3730
'ed field test and cast
150
CONCRETE COMP SIVE STRENGTH
Date of Service: 05/18/1998 Report No.: 981269
Client No.: 52617000 Project No.: 43-245~
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppell
Belt Li~
Coppell
Services: Obtaiu samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PriNT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
3-5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 05/18/1998
TIME SAMPLED: 7:00 am BY:
WEATHER CONDITIONS: Partly
TEMPERATURE (F) - AIR 73 v {
TRUCKNO: 410 TICK
AIR CONTENT (%): 3.8 ur
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: 40'N/bldg. at D.9
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
3 1 6.00* 05/25/1998 7 93420
3 2 6.00' 05/25/1998 7 91590
Average
3 3 6.00* 06/15/1998 28
3 4 6.00* 06/15/1998 28
* Note: See page 1
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the ~
01AK Page 3 of 10
ENGRqEERII~, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
05/27/1998
.97
Business Center II
~e Rd. & Lakeshore Dr.
Texas
~d field test and cast
BATCH TIME: 6:53 am
dark Apodaca
oudy
:ONCRETE: 81 F
gTNO: 712153
IT WEIGHT (pc0: N/A
:CUMULATIVE YARDS: 270
COMPRESSIVE
STRENGTH
(psi)
3300
3240
3270
FRACTURE
TYPE
'ittcn approval of HBC Engineering, Inc.
.CONCRETE COMPR' SIVE STRENGTH
Date of Service: 05/18/1998 Report No.: 981269!
Client No.: 52617000 Project No.: 43-245~
Client: Lincoln ProperW Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppell
Belt Lil
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
3-5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMEWr DATE: 05/18/1998
TIME SAMPLED: 7:55 am BY:
WEATHER CONDITIONS: Partly
TEMPERATURE (F) - AIR 74 F
TRUCK NO: 550 TICKJ
AIR CONTENT (%): 4.0 ub
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: 50'N/bldg. at D.2
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
4 1 6.00* 05/25/1998 7 74860
4 2 6.00* 05/25/1998 7 78310
Average
4 3 6.00* 06/15/1998 28
4 4 6.00' 06/15/1998 28
* Note: See page 1
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the ~
01AK Page 4 of 10
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
05/27/1998
.97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 7:50 am
~Iark Apodaca
oudy
:ONCRETE: 80 F
,:T NO: 712162
IT WEIGHT (pc0: N/A
~CUMULATIVE YARDS: 360
COMPRESSIVE
STRENGTH
(psi)
2650
2770
2710
FRACTURE
TYPE
itten approval of HBC Engineering, Inc.
CONCRETE COMP SIVE STRENGTH
Date of Service:
Client No.:
Client:
05/18/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 981269!
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
3-5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 05/18/1998
TIME SAMPLED: 8;57 am BY:
WEATHER CONDITIONS: Clear
TEMPERATURE (F)-AIR 78 F
TRUCK NO: 847 TICR
AIR CONTENT (%): 4.2 UN
PLACEMENT LOCATION:
See page !
SAMPLE LOCATION:
CYLINDER
MARKED
SET NO.
20'N/bldg. at B.7
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
5 1 7.00' 05/25/1998 7 87720
5 2 7.00* 05/25/1998 7 86220
Average
5 3 7.00' 06/15/1998 28
5 4 7.00* 06/15/1998 28
A(
* Note: See page 1
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the w
01AK Page 5 of 10
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
05/27/1998
-97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 8.'55 am
/lark Apodaca
ONCRETE: 80 F
:TNO: 712171
IT WEIGHT (PC0: N/A
:CUMULATIVE YARDS: 440
COMPRESSIVE
STRENGTH
(psi)
3100
3050
3080
FRACTURE
TYPE
tten approval of HBC Engineering, Inc.
CONCRETE COMPR SIVE STRENGTH
Date of Service: 05/18/1998
Report No.: 981269!
Client No.: 52617000 Project No.: 43-2452
Client:
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project: Coppell
Belt Lit
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi:
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
34"
3-6%
ASTM C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 05/18/1998
TIME SAMPLED: 10:25 am BY:
WEATHER CONDITIONS: Clear
TEMPE~O, TURE (F)- Am 81 F
TRUCK NO: 408 TICI~
AIR CONTENT (%): 3.9 u~
PLACEMENT LOCATION:
See page !
SAMPLE LOCATION: W end, I 0'W/island at water hydrant
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
6 1 7.00' 05/25/1998 7 81390
6 2 7.00' 05/25/1998 7 88200
Average
6 3 7.00* 06/15/1998 28
6 4 7.00* 06/15/1998 28
Note: See page 1
This report is exclusively for the use of the client indicated above and shall not bc reproduced except in full without the ~
01AK Page 6 of 10
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
05/27/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: N/A
dark Apodaca
IONCRETE: 83 F
~.T NO: 712183
IT WEIGHT (pcf): N/A
~CUMULATIVE YARDS: 560
COMPRESSIVE
STRENGTH
(psi)
2880
3120
3000
FRACTURE
TYPE
ittcn approval of HBC Engineering, Inc.
CONCRETE COMP SIVE STRENGTH
Date of Service: 05/18/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
981269!
43-2452
Coppell
Belt Lin
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
3-6%
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 05/18/1998
TIME SAMPLED: 11:45 am BY:
WEATHER CONDITIONS: Clear
TEMPERATURE (F)-AIR 90 F
TRUCKNO: 730 TICKI
AIR CONTENT (%): 4.4 UN
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: W end, 30'W/island, 5'N/water hyd.
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
7 1 7.50* 05/25/1998 7 104020
7 2 7.50* 05/25/1998 7 100080
Average
7 3 7.50* 06/15/1998 28
7 4 7.50* 06/15/1998 28
A(
* Note: See page 1
This repot~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wr
01AK Page 7 of 10
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
05/27/1998
.97
Business Center II
e Rd. & Lakeshore Dr.
Texas
'ed field test and east
BATCHTIME: 11:30 am
4ark Apodaca
ONCRETE: 86 F
',T NO: 712195
rr WEIGHT (pc0: N/A
'CUMULATIVE YARDS: 68015
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
3680
3540
3610
tten approval of HBC Engineering, Inc.
-CONCRETE COMP SIVE STRENGTH
Date of Service:
Client No.:
Client:
Services:
05/18/1998 Report No.: 981269!
52617000 Project No.: 43-245;
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project:
Coppell
Belt Lil
Coppell
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi (~} 28 Days
3-5"
3-6%
ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: 40'N/bldg. at G.4
PROJECT DATA
CONCRETE CLASS:
PLACEMENT DATE:
,97
9351
05/18/1998
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
05/27/1998
Business Center II
~e Rd. & Lakeshore Dr.
Texas
~ed field test and cast
BATCH TIME: N/A
TIME SAMPLED: 1:09 pm BY: ~Iark Apodaca
WEATHER CONDITIONS: Clear |'
TEMPERATURE (F) - AIR 91 F ~ONCRETE:t 85 g
TRUCK NO: 408 TICKJgT NO: 712200
AIR CONTENT (%): 4.1 m FIT WEIGHT (PC0: N/A
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
8 1 6.75' 05/25/1998
8 2 6.75 * 05/25/1998
MAXIMUM
AGE LOAD
(days) (lbs. force)
AI
7 79650
7 86220
Average
2CUMULATIVE YARDS: 780
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
2820
3O5O
2940
8 3 6.75* 06/15/1998 28
8 4 6.75* 06/15/1998 28
* Note: See page 1
This ~port is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without the v
ritt~n approval of HBC Engineering, Inc.
01AK Page 8 of 10
· CONCRETE COMP SIVE STRENGTHTM
Date of Service: 05/18/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
981269'
43-245~
Coppeil
Belt Li[
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi (~ 28 Days
3-6%
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 05/18/1998
TIME SAMPLED: 2:10 pm BY:
WEATHER CONDITIONS: Clear
TEMPERATURE (F)-AIR 94 F
TRUCK NO: 373 TICI~
AIR CONTENT (%): 3.7 u~
PLACEMENT LOCATION:
See page !
SAMPLE LOCATION:
CYLINDER
MARKED
SET NO.
40'N/bldg. at I line
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
9 1 9.50* 05/25/1998 7 88760
9 2 9.50* 05/25/1998 7 91310
Average
9 3 9.50* 06/15/1998 28
9 4 9.50* 06/15/1998 28
A~
* Note: See page 1
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the
01AK Page 9 of 10
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
05/27/1998
.97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 1:37 pm
/lark Apodaca
iONCRETE: 85 F
;TNO: 712206
IT WEIGHT (pc0: N/A
:CUMULATIVE YARDS: 830
COMPRESSIVE
STRENGTH
(psi)
3140
3230
3190
FRACTURE
TYPE
ittcn approval of HBC Engineering, Inc.
CONCRETE COMPI "3SIVE STRENGTH TEo F
Date of Service:
Client No.:
Client:
05/18/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 981269!
Project No.: 43-245~
Project: Coppell
Belt Lit
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samp les. **
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
3-5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 05/18/1998
TIME SAMPLED: 2:45 pm BY: }
WEATHER CONDITIONS: Clear
TEMPERATURE (F) - AIR 95 F t2
TRUCK NO: 730 TlCm
AIR CONTENT (%): 4.4 UN
PLACEMENT LOCATION:
See page !
SAMPLE LOCATION: 80'N/bldg. at J.2
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
10 I 7.00*
10 2 7.00*
10 3 7.00*
10 4 7.00*
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
05/25/1998 7 105070
05/25/1998 7 102050
Average
06/15/1998 28
06/15/1998 28
A(
* Note: See page 1
Technician: Mark Apodaca
Report Distribution:
(I) Lincoln Property Company
(I) Butler Construction
(I) O'Brien & Associates
(1) AECC, Inc.
Started: 3:30 am Finished: 4:00 pm I--~
(I) City ofCoppell/Bldg, lnsp.
(I) City ofCoppell/Constr. Insp.
(I) Mullen & Powell Technistructures
This report is exclusively for the use &the client indicated above and shall not be reproduced except in full without the w~
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
05/27/1998
¸97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: N/A
/lark Apodaca
ONCRETE:' 86 F
:TNO: 712215
ITWEIGHT (pc0: N/A
:CUMULATIVE YARDS: 920
COMPRESSIVE
STRENGTH
(psi)
3720
3610
3670
FRA~URE
TYPE
~ Engineerint
~ugene~
Vice President
tten approval of HBC Engineering, Inc.
01AK Page 10 of 10
t2ONCRETE COMP SIVE STRENGTH
Date of Service: 04/28/1998
Report No.: 981087.~
Client No.: 52617000 Project No.: 43-2452
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppell
Belt Lin
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16 (on site)
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi ~ 28 Days
5" max
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9337
PLACEMENT DATE: 04/28/1998
TIME SAMPLED: 6:36 am BY:
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 54
TRUCK NO: 849 TICm
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
Panels 44, 48-64, 2-8, 65, 66, I, 14, 14A, 15-~
Building B
SAMPLE LOCATION: Panel 55
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
I 1 9.00* 05/05/1998 7 91010
I 2 9.00' 05/05/1998 7 88090
Average
I 3 9.00* 05/26/1998 28 147740
I 4 9.00* 05/26/1998 28 137390
Average
AC
* Note: Water added by others. Concrete placed by pump; samples t
of discharge. No G.C. rep on site at time of sample; Butler notific
placement slump was out of spec.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the w~
01AK Page I of 7
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
05/28/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
'ed field test and cast
BATCH TIME: 6:32 am
)ean Martin
light wind
ONCRETE: 71 F
:TNO: 711755
IT WEIGHT (per): N/A
!1, 67-69, 13, 9, 40, 41, 38, 38A, 70, 71,
:CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
3220
3120
3170
5220
4860
5040
ken at point
d that
140
FRACTURE
TYPE
itten approval of HBC Engineering, Inc.
CONCRETE COMPR t . SIVE STRENGTH
Date of Service: 04/28/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
981087~
43-2452
Coppell
Belt Lin
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requil
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16 (on site)
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi (~ 28 Days
5" max
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9337
PLACEME~rr DATE: 04/28/1998
TIME SAMPLED: 7:47 am BY:
WEATHER CONDITIONS: Cloudy,.
TEMPERATURE (F)-AIR 54 F C
TRUCK NO: 852 TICK[
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
See page 1
SAMPLE LOCATION: Panel 62
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
2 I 5.00 05/05/1998 7 89230
2 2 5.00 05/05/1998 7 85770
Average
2 3 5.00 05/26/1998 28 125700
2 4 5.00 05/26/1998 28 122130
Average
A(
This report is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without thc wri
01AK Page 2 of 7
ENGINEERING, INC.
8901 Carpenter Frwy. Snite #100
Dallas, Texas 75247
Report Date
05/28/1998
.97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 7:27 am
)ean Martin
light wind
ONCRETE: 67 F
TNO: 711764
IT WEIGHT (pet): N/A
CUMULATIVE YARDS: 230
COMPRESSIVE
STRENGTH
(psi)
3160
3030
3100
4450
4320
4390
FRACTURE
TYPE
~n approval of HBC Engineering, Inc.
CONCRETE COMPR? SIVE STRENGTH
Date of Service: 04/28/1998 Report No.: 981087:
Client No.: 52617000 Project No.: 43-245~
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppell
Belt Li~
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16 (on site)
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi ~ 28 Days
5" max
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9337
PLACEMENT DATE: 04/28/1998
TIME SAMPLED: 9:34 am BY:
WEATHER CONDITIONS: Partly
TEMPERATURE (F) - Am 58 F ;
TRUCK NO: 410 TICK
AIR CONTENT (%): N/A ur
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: Panels ! & 64
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
3 I 6.00 05/05/1998 7 89250
3 2 6.00 05/05/1998 7 91110
Average
3 3 6.00 05/26/1998 28 125960
3 4 6.00 05/26/1998 28 116470
Average
This report is exclusively for the use of the client indicated above and shall not bc reproduced except in full without thc
01AK Page 3 of 7
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
05/28/1998
Business Center II
~e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 9:01 am
)can Martin
oudy, windy
:ONCRETE: 73 F
STNO: 642604
IT WEIGHT (pet): N/A
~CUMULATIVE YARDS: 310
COMPRESSIVE
STRENGTH
(psi)
3160
3220
3190
4450
4120
4290
FRACTURE
TYPE
~tten approval of HBC Engineering, Inc.
CONCRETE COMPRESSIVE STRENGTH
Date of Service: 04/28/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
981087.'
43-2452
Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16 (on site)
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi ~ 28 Days
5" max
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9337
PLACEMENT DATE: 04/28/1998
TIME SAMPLED: 10:14am BY: [
WEATHER CONDITIONS: Mostly C
TEMPERATURE (F} - AIR 57 F C
TRUCK NO: 852 TICK~
AIR CONTENT (aA): N/A UN:
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: Panel 6
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
4 1 6.00 05/05/1998 7 97530
4 2 6.00 05/05/1998 7 94930
Average
4 3 6.00 05/26/1998 28 115750
4 4 6.00 05/26/1998 28 109120
Average
AC
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri
01AK Page 4 of 7
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
05/28/1998
.97
Business Center II
~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 9:50 am
lean Martin
loudy, windy
DNCRETE: 69 F
TNO: 711768
T WEIGHT (pc0: N/A
CUMULATIVE YARDS: 400
COMPRESSIVE
STRENGTH
(psi)
3450
3360
3410
4090
3860
3980
FRACTURE
TYPE
ttcn approval of HBC Engineering, Inc.
CONCRETE COMPR? SIVE STRENGTH
Date of Service: 04/28/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
981087~
43-2452
Coppell
Belt Lin
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi]
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16 (on site)
SPECIFICATION REQUIREMENTS
S~RENG~: 3500 psi ~ 28 Days
5" max
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9337
PLACEMENT DATE: 04/28/1998
TIMESAMPLEO: 11:34 am BY: [
WEATHER CONDITIONS: Cloudy,
TEMPERATURE (F} - AIR 58 F C
TRUCK NO: 19 TiC~
AIR CONTENT (%}: N/A Vn
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: Panel 19
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (ll~. force)
5 I 7.75 05/05/1998 7 95610
5 2 7.75 05/05/1998 7 91910
Average
5 3 7.75 05/26/1998 28 126820
5 4 7.75 05/26/1998 28 117890
Average
AC
This report is exclusively for the usc of thc client indicated above and shall not be reproduced except in full without the wri
01AK Page 5 of 7
8901 Carpenter Frwy., Suite #100
Dallas, Texas 7S247
Report Date
05/28/1998
.97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: I 1:25 am
Bean Martin
windy
DNCRETE: 71 F
TNO: 711780
~X WERmT (pc0: N/A
CUMULATIVE YARDS:
EOMPRESSIVE
STRENGTH
(psi)
3380
3250
3320
4480
4170
4330
520
FRACTURE
TYPE
~en approval of HBC Engineering, Inc.
CONCRETE COMPR _ SIVE STRENGTH
Date of Service: 04/28/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
981087
43-245'~
Coppell
Belt Lit
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLmR: Pioneer Concrete
PLANT: 16 (on site)
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi ~ 28 Days
5" max
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Panels 28 & 29
PROJECT DATA
CONCRETE CLASS: 9337
PLACEMENT DATE: 04/28/1998
TIME SAMPLED: 12:59 pm BY:
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 58 F (
TRUCK NO: 849 TICK]
AIR CONTENT (%): N/A ur
PLACEMENT LOCATION:
See page 1
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (Ib~. force)
6 I 5.50 05/05/1998 7 97450
6 2 5.50 05/05/1998 7 94930
Average
6 3 5.50 05/26/1998 28 123510
6 4 5.50 05/26/1998 28 115340
Average
Al
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the v
01AK Page 6 of 7
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
05/28/1998
.97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 12:49 pm
)can Martin
:ONCRETE: 71 F
~ NO: 711790
IT WEIGHT (pc0: N/A
.~CUMULATIVE YARDS: 620
COMPRESSIVE
STRENGTH
(psi)
3450
3360
3410
4370
4080
4230
FRACTURE
TYPE
ittcn approval of HBC Engineering, Inc.
CONCRETE COMPRI SIVE STRENGTH
Date of Service: 04/28/1998
Report No.: 9810875
Client No.: 52617000
Project No.: 43-2452.
Client:
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project: Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement IDeations, perform requir
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16 (on site)
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi ~ 28 Days
5" max
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9337
PLACEMENT DATE: 04/28/1998
TIME SAMrLED: 2:00 pm BY: E
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F} - AIR 59 V C,
TRUCK NO: 849 TICKE
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page 1
SAMPLE LOCATION: Panels 38 & 38A
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
7 I 5.50
7 2 5.50
7 3 5.50
7 4 5.50
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
05/05/1998 7 70120
05/05/1998 7 71520
Average
05/26/1998 28 142680
05/26/1998 28 137390
Average
AC
Technician: Dean Martin
Report Distribution:
(I) Lincoln Property Company
(I) Butler Construction
(I) O'Bricn & Associates
(I) AECC, Inc.
Started: 5:30 am Finished: 3:00 pm I'~
(I) City of Coppell/Bldg. lnsp.
(I) City ofCoppell/Constr. Insp.
(I) Mullen & Powell Technistructures
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc va
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
05/28/1998
97
]usiness Center II
; Rd. & Lakeshore Dr.
Texas
~d field test and cast
BATCH TIME: 1:40 pm
;an Martin
NCRETE: 72 F
rNO: 711800
TWEIGHT(oc0:N/A
:UMULATIVE YARDS: 720
OMPRESSIVE
STRENGTH
(~i)
2480
2530
2510
5050
4860
4960
FRACTURE
TYPE
Eng~
]ugene Ha'~bour
Vice President
ttcn approval of HBC Engineering. Inc.
01AK Page 7 of 7