Northlake 635(3)-LR 980529REPORT OF STRUC 'RAL STEEL INSPEC N Date of Service: 05/20/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 981336, Project No.: 43-2452 Project: Coppell Belt Lk Coppell Services: Structural steel inspection. On this date, an HBC Engineering representative arrived at the abov~ jobsite as scheduled for roof decking inspection on Building C. Th~ items have been visually inspected. Between Grid Lines 1 to 4 and A to N, an inspection of the roe conducted. 5/8" puddle . welds attached the roof to the perim( 6" centers and to the joists on 12" centers. Side lap screws were attached in each span between joists. Dx general notes denoted Hilti fasteners should be used. The get contractor was in the process of checking to see if 5/8" pudd] would be acceptable. Technician: MetroTech Report Distribution: ( I } Lincoln Propo~y Company ( I ! Butler Construction ( I } O'Brien & Associates ( I ) AECC, Inc. (1) City of Coppell/BIdg insp. (1) City of Coppoll/Constr. Insp. (1) Mullen & Powell Technistructures This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the va Pal~e 1 of I 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Report Date 05/29/1998 .97 Business Center II e Rd. & Lakeshore Dr. Texas referenced following f decking was ter angle on awing Sl.1 ,eral e welds -~ En , Inc. aul D. Smith, P.E. mior Project Engineer itten approval of HBC Engineering, Inc.