Northlake 635(3)-LR 980601· 'CONCRETE COMP1L' .,SIVE STRENGTH TE '"Y
Date of Service: 05/01/1998
Report No.: 981124]
Client No.: 52617000 Project No.: 43-2452
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppell
Belt Lin
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform reqm~
compressive strength samples.**
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi @ 28 Days
SLUMP: 5"
AIR: N/A
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9337
PLACEMENT DATE: 05/01/1998
TIME SAMPLED: 7:22 am BY:
WEATHER CONDITIONS: Clear
TEMPERATURE (F)-AIR 64 F
TRUCK NO: 769 TICI~
AIR CONTENT (%): N/A u~
PLACEMENT LOCATION:
Building B, Panels 41, 42, 47, 46, 45, 37, 33,
SAMPLE LOCATION: Panel 47
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
1 1 6.00 05/08/1998 7
1 2 6.00 05/08/1998 7
1 3 6.00 05/29/1998 28
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the
01AK Page 1 of 3
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
06/01/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
'ed field test and cast
BATCH TIME: 7:00 am
kldie Elrod
'ONCRETE: 76 F
;TNO: 711855
IT WEIGHT (pc0: N/A
25
2CUMULATIVE YARDS: 80
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
-itten approval of nBC Engineering, lne.
'CONCRETE COMPILr .. SIVE STRENGTH
Date of Service: 05/01/1998
Report No.: 9811241
Client No.: 52617000 Project No.: 43-2452
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppell
Belt Li~
Coppell
Services: Obtain samples of flesh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9337
PLACEMENT DATE: 05/01/1998
TIME SAMPLED: 9:15 am BY:
WEATHER CONDITIONS: Clear
TEMPERATURE (F) - AIR 72 F
TRUCK NO: 763 TlCl~
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Sec page I
SAMPLE LOCATION: Panel 18
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
2 1 5.50 05/08/1998 7 93360
2 2 5.50 05/08/1998 7 92390
Average
2 3 5.50 05/29/1998 28 116110
2 4 5.50 05/29/1998 28 119670
Average
A~
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the v
01AK Page 2 of 3
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
06/01 / 1998
-97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 8:34 am
iddie Elrod
ONCRETE: 74 F
:TNO: 711863
~WEIGtrr(~0: N/A
~CUMULATIVE YARDS: 160
COMPRESSIVE
STRENGTH
(~i)
3300
3270
3290
4110
4230
4170
FRACTURE
TYPE
itten approval of HBC Engineering Inc.
· CONCRETE COMPI r' SIVE STRENGTH TEL" .
Date of Service: 05/01/1998
Report No.: 9811241
Client No.: 52617000 Project No.: 43-2452
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppeli
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi (~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9337
PLACEMENT DATE: 05/01 / 1998
TIME SAMPLED: 10:25 am BY:
WEATHER CONDITIONS: Clear
TEMPERATURE (F) - AIR 82 F
TRUCK NO: 804 TICK!
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: Panel I
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED {days) (lbs. force)
3 1 5.25
3 2 5.25
3 3 5.25
3 4 5.25
05/08/1998 7 88090
05/08/1998 7 86560
Average
05/29/1998 28 108600
05/29/1998 28 106140
Average
Al
Technician: Eddie Elrod
Report Distribution:
(I) Lincoln Property Company
(I) Butler Construction
(I) O'Brien & Associates
(I) AECC, Inc.
Started: 8:30 am Finished: 1:00 pm
(1) City of Coppell/Bldg. lnsp.
(1) City of Coppell/Constr. Insp.
(I) Mullen & Powell Technistructurcs
-97
ENGINEERING, RqC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
06/01/1998
Business Center II
~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 9:45 am
;ddie Elrod
~NCRETE: 80 F
rNO: 711871
ITWEIGHT(pc0: N/A
~CUMULATIVE YARDS: 240
COMPRESSIVE
STRENGTH
(psi)
3120
3060
3090
3840
3750
3800
Inc.
Vice President
FRACTURE
TYPE
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc wr
ittcn approval of HBC Engineering, Inc.
01AK Page 3 of 3