Loading...
Northlake 635(3)-LR 980601· 'CONCRETE COMP1L' .,SIVE STRENGTH TE '"Y Date of Service: 05/01/1998 Report No.: 981124] Client No.: 52617000 Project No.: 43-2452 Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppell Belt Lin Coppell Services: Obtain samples of fresh concrete at the placement locations, perform reqm~ compressive strength samples.** CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi @ 28 Days SLUMP: 5" AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 05/01/1998 TIME SAMPLED: 7:22 am BY: WEATHER CONDITIONS: Clear TEMPERATURE (F)-AIR 64 F TRUCK NO: 769 TICI~ AIR CONTENT (%): N/A u~ PLACEMENT LOCATION: Building B, Panels 41, 42, 47, 46, 45, 37, 33, SAMPLE LOCATION: Panel 47 REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 1 1 6.00 05/08/1998 7 1 2 6.00 05/08/1998 7 1 3 6.00 05/29/1998 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the 01AK Page 1 of 3 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 -97 Report Date 06/01/1998 Business Center II e Rd. & Lakeshore Dr. Texas 'ed field test and cast BATCH TIME: 7:00 am kldie Elrod 'ONCRETE: 76 F ;TNO: 711855 IT WEIGHT (pc0: N/A 25 2CUMULATIVE YARDS: 80 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE -itten approval of nBC Engineering, lne. 'CONCRETE COMPILr .. SIVE STRENGTH Date of Service: 05/01/1998 Report No.: 9811241 Client No.: 52617000 Project No.: 43-2452 Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppell Belt Li~ Coppell Services: Obtain samples of flesh concrete at the placement locations, perform requi~ compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 05/01/1998 TIME SAMPLED: 9:15 am BY: WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 72 F TRUCK NO: 763 TlCl~ AIR CONTENT (%): N/A PLACEMENT LOCATION: Sec page I SAMPLE LOCATION: Panel 18 CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 2 1 5.50 05/08/1998 7 93360 2 2 5.50 05/08/1998 7 92390 Average 2 3 5.50 05/29/1998 28 116110 2 4 5.50 05/29/1998 28 119670 Average A~ This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the v 01AK Page 2 of 3 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 06/01 / 1998 -97 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 8:34 am iddie Elrod ONCRETE: 74 F :TNO: 711863 ~WEIGtrr(~0: N/A ~CUMULATIVE YARDS: 160 COMPRESSIVE STRENGTH (~i) 3300 3270 3290 4110 4230 4170 FRACTURE TYPE itten approval of HBC Engineering Inc. · CONCRETE COMPI r' SIVE STRENGTH TEL" . Date of Service: 05/01/1998 Report No.: 9811241 Client No.: 52617000 Project No.: 43-2452 Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppeli Belt Lin Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requi~ compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi (~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 05/01 / 1998 TIME SAMPLED: 10:25 am BY: WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 82 F TRUCK NO: 804 TICK! AIR CONTENT (%): N/A UN PLACEMENT LOCATION: See page I SAMPLE LOCATION: Panel I CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED {days) (lbs. force) 3 1 5.25 3 2 5.25 3 3 5.25 3 4 5.25 05/08/1998 7 88090 05/08/1998 7 86560 Average 05/29/1998 28 108600 05/29/1998 28 106140 Average Al Technician: Eddie Elrod Report Distribution: (I) Lincoln Property Company (I) Butler Construction (I) O'Brien & Associates (I) AECC, Inc. Started: 8:30 am Finished: 1:00 pm (1) City of Coppell/Bldg. lnsp. (1) City of Coppell/Constr. Insp. (I) Mullen & Powell Technistructurcs -97 ENGINEERING, RqC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 06/01/1998 Business Center II ~ Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 9:45 am ;ddie Elrod ~NCRETE: 80 F rNO: 711871 ITWEIGHT(pc0: N/A ~CUMULATIVE YARDS: 240 COMPRESSIVE STRENGTH (psi) 3120 3060 3090 3840 3750 3800 Inc. Vice President FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc wr ittcn approval of HBC Engineering, Inc. 01AK Page 3 of 3