Northlake 635(3)-LR 980602REPORT OF STRUC% "3RAL STEEL INSPEC
Date of Service: 05/22/1998 Report No.: 981337(
Client No.: 52617000 Project No.: 43-2452
.97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
06/02/1998
Client:
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Services: Roof decking inspection.
On this date, an HBC Engineering representative
Project: Coppell
Belt Lin
Coppell
arrived at the above
jobsite as
scheduled for roof decking inspection on Building C. The
Business Center II
e Rd. & Lakeshore Dr.
Texas
referenced
items have been visually inspected.
The entire roof is complete. 5/8 "puddle welds 12"
center at perimeter were used to attach decking with
used in each span all welds were sufficiently fused.
on center
two side lap
(i) City of CoppelFBldg. lasp.
(1) City of Coppell/Constr. lnsp.
(!) Mullen & Powell Technistmctures
Technician: MetroTech
Report Distribution:
( I ) Lincoln Property Company
( I ) Butler Construction P~
(1) O'Brien & Associates S~
( I ) AECC, Inc.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri
Pa~,e 1 of 1
following
and 6" on
screws
En~i~ring, Inc.
mi D. Smith, P.E.
nior Project Engineer
Ien approval of HBC Engineering, Inc.