Loading...
Northlake 635(3)-LR 980602REPORT OF STRUC% "3RAL STEEL INSPEC Date of Service: 05/22/1998 Report No.: 981337( Client No.: 52617000 Project No.: 43-2452 .97 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 06/02/1998 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Services: Roof decking inspection. On this date, an HBC Engineering representative Project: Coppell Belt Lin Coppell arrived at the above jobsite as scheduled for roof decking inspection on Building C. The Business Center II e Rd. & Lakeshore Dr. Texas referenced items have been visually inspected. The entire roof is complete. 5/8 "puddle welds 12" center at perimeter were used to attach decking with used in each span all welds were sufficiently fused. on center two side lap (i) City of CoppelFBldg. lasp. (1) City of Coppell/Constr. lnsp. (!) Mullen & Powell Technistmctures Technician: MetroTech Report Distribution: ( I ) Lincoln Property Company ( I ) Butler Construction P~ (1) O'Brien & Associates S~ ( I ) AECC, Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri Pa~,e 1 of 1 following and 6" on screws En~i~ring, Inc. mi D. Smith, P.E. nior Project Engineer Ien approval of HBC Engineering, Inc.