Loading...
Northlake 635(3)-LR 980603CONCRETE COMP IVE STRENGTH Date of Service: 05/05/1998 Report No.: 9811522 Client No.: Client: Services: 52617000 Project No.: 43-2452. Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell Belt Lira Coppell, Obtain samples of fresh concrete at the placement locations, perform requir compressive strength samples.** ENG]NF_.~I~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texa~ 75247 .97 Report Date 06/03/1998 Business Center II : Rd. & Lakeshore Dr. Texas ~d field test and cast SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTm 3500 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Same CYLINDER MARKED SET NO. MEASURED SLUMP (inches) I 1 6.00 1 2 6.O0 I 3 6.00 1 4 6.00 Technician time on report DATE TESTED 05/12/1998 05/12/1998 06/02/1998 06/02/1998 9811521. PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 05/05/1998 TIME SAMPLED: ]: 15 pm BY: [ WEATHER CONDITIONS: Warm, 0 TEMPERATURE (F}-AIR 74 F C TRUCK NO: 552 TICK[ AIR CONTENT (%): N/A tr~: PLACEMENT LOCATION: Pier on southeast comer of Building B REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 7 82480 7 84360 Average 28 93350 28 97280 Average A( BATCH TIME: 11:27 am ,el Ratliff vercast, windy 2}NCRETE: 88 F TNO: 708326 T WEIGHT (pc0: N/A CUMULATIVE YARDS: 20 COMPRESSIVE STRENGTH (psi) 2920 2980 2950 3300 3440 3370 FRACTURE TYPE Technician: Del Ratliff Report Diatribution: (I) Lincoln Property Company ( I ) Butler Construction (I) O'Brien & Associates (I) AECC, Inc. Started: Finished: (1) City ofCoppell/Bldg. Insp. (1) City of Coppell/Constr. [nsp. (1) Mullen & Powell Technistructures This report is exclusively tbr the use of the client indicated above and shall not bc reproduced except in full without the w~ ~ugene Harbour Vice President ttcn approval of HBC Engineering, Inc. 01AK Page I of I .CONCRETE COMPR SIVE STRENGTH TE, "iTM Date of Service: 05/04/1998 Client No.: 52617000 Report No.: 981143: Project No.: 43-245~ .97 ENGRqEF_RING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 06/03/1998 Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Services: SLUMP: AIR: TEST METHOD: Coppell Belt Lit Coppell Obtain samples of fresh coucrete at the placement locations, perform requi compressive strength samples.** Butler Construction Pioneer Concrete 16 CONTRACTOR: CONCRETE SUPPLIER: PLANT: SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 Business Center II ~e Rd. & Lakeshore Dr. Texas SAMPLE LOCATION: Panel 39 'ed field test and cast Tiffs report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without thc ~ 01AK Page I of 3 I I 5.75 05/11/1998 7 86700 1 2 5.75 05/11/1998 7 88980 Average I 3 5.75 06/01/1998 28 103400 I 4 5.75 06/01 / 1998 28 99960 Average REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) Al .'CUMULATIVE YARDS: 90 COMPRESSIVE STRENGTH (psi) 3070 3150 3110 3660 3530 3600 FRACTURE TYPE ittcn approval of HBC Engineering, Inc. AIR CONTENT (%): N/A PLACEMENT LOCATION: Panels 30 through 59, Building D PROJECT DATA CONCRETE Ct~SS: 9337 PLACEMENT DATE: 05/04/1998 ~ATCH TIME: 6:00 am T~MESAMPLED: 6:15 am aY: l~ddie Elrod WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 60 F (~ONCRETE: 74 TRUCKNO: 852 TICK~TNO: 711884 UI~ IT WEIGHT (pc0: N/A CONCRETE COMPRr' SIVE STRENGTH TE, '"2 Date of Service: 05/04/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Services: 981143. 43-245~ Coppell Belt Lit Coppell Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples.** CONTRACTOR: CONCRETE SUPPLIER: PLANT: Butler Construction Pioneer Concrete 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days SLUMP: AIR: TEST METHOD: N/A ASTM C-143 ASTM C- 172 ASTM C-39 Panel 45 01AK SAMPLE LOCATION: .97 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 2 1 6.00 05/11/1998 2 2 6.00 05/11/1998 2 3 6.00 06/01/1998 2 4 6.00 06/01/1998 ENGINEERING, RqC. 8901 Carpenter Frwy., SuRe #100 Dallas, Texas 75247 Report Date 06/03/1998 Business Center II ~e Rd. & Lakeshore Dr. Texas ed field test and cast PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 05/04/1998 BATCH TIME: 6:58 am TIME SAMPLED: 7:10 am BY: Eddie Elrod WEATHER CONDITIONS: Clear [ TEMPERATURE (F) - AIR 63 g (~ONCRETE: 72 F TRUCKNO: 801 TlCi~T NO: 711891 AIR CONTENT (%): N/A u~ IT WEIGHT (peO: N/A PLACEMENT LOCATION: See page ! Al .~CUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3340 3330 3340 4010 4160 4090 REPORT OF TESTS MAXIMUM AGE LOAD (days) (l~.brce) 7 94360 7 94080 Average 28 113500 28 117770 Average Thisrepo~isexclusively ~rtheuseoftheclientindicated aboveandshallnotbereproducedexceptin ~llwi~out ~ev Page 2 of 3 160 FRACTURE TYPE itten approval of HBC Engineering, Inc. CONCRETE COMPR SIVE STRENGTH TEf'Y Date of Service: Client No.: Client: 05/04/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 9811431 Project No.: 43-245~ Project: Coppell Belt Li~ Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requn compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: i 6 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Panel 57 PROJECT DATA CONCRETE CLASS: 933 7 PLACEMENT DATE: 05/04/1998 TIME SAMPLED: 8:10 am BY: WEATHER CONDITIONS: Clear TEMPERATURE (F)- AIR 72 F TRUCK NO: 812 TICK! AIR CONTENT (%): N/A UN PLACEMENT LOCATION: See page I CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 3 1 6.00 3 2 6.00 3 3 6.00 3 4 6.00 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 05/11/1998 7 115550 05/11/1998 7 117660 Average 06/01/1998 28 109890 06/0 l/1998 28 109210 Average A( Technician: Eddie Elrod Report Distribution: (I) Lincoln Property Company (I) Butler Construction (I) O'Brien & Associates (I) AECC, Inc. Started: 4:00 am Finished: 10:00 ~ (I) City ofCoppell/Bldg, lnsp. (1) City ofCoppell/Constr, lnsp. (I) Mullen & Powell Technistructures This report is exclusively for the usc of thc client indicated above and shall not be reproduced except in full without thc wr ENGINEERING, R~. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 06/03/1998 -97 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 7:45 am ',ddie Elrod ONCRETE: 73 F ;TNO: 711899 ~WEIGHT(pc0: N/A CUMULATIVE YARDS: 240 COMPRESSIVE STRENGTH (psi) 4090 4160 4130 3890 3860 3880 FRACTURE TYPE Engi~, Inc. ]ugeneTHarbour Vice President ~tcn approval of HBC Engineering, Inc. 01AK Page 3 of 3