Loading...
Northlake 635(3)-LR 980604 CONCRETE COMPR.r' aSIVE STRENGTH Date of Service: Client No.: Client: 05/06/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 981165 Project No.: 43-245~ Project: Coppel Belt Lil Coppel Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 3-5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMEmr DATE: 05/06/1991~ TIME SAMPLED: 5:10 am BY: WEATHER CONDITIONS: Cloudy TEMPERATURE (F)-AIR 62 F ~ TRUCK NO: 550 TICK AIR CONTENT (%): 1.7 ur PLACEMENT LOCATION: Building D panels 69-82 SAMPLE LOCATION: Panel 69 CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 1 1 5.00 05/13/1998 7 84970 1 2 5.00 05/13/1998 7 89620 Average 1 3 5.00 06/03/1998 28 109130 1 4 5.00 06/03/1998 28 105020 Average Note: Samples obtained at point of discharge of pump hose. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the 01AK Page I of 4 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 06/04/1998 -97 Business Center II te Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 5.'00 am vlario Villanueva 2ONCRETE: 63 F ST NO: 711904 lIT WEIGHT (pc0: N/A 2CUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3000 3170 3090 3860 3710 3790 10 FRACTURE TYPE · itten approval of HBC Engineering, Inc. · CONCRETE COMPR ' SIVE STRENGTH TEar'S. Date of Service: 05/06/I 998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 981165 43-245; Coppell Belt Lii Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete pLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 3-5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 05/06/1998 TIME SAMPLED: 6:38 am BY: WEATHER CONDITIONS: Cloudy TEMPERATURE (F) - AIR 67 g ~ TRUCK NO: 853 TICK AIR CONTENT (%): 1.9 ur PLACEMENT LOCATION: See page 1 SAMPLE LOCATION: Panel 76 REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 2 1 5.25 05/13/1998 7 106020 2 2 5.25 05/13/1998 7 99230 Average 2 3 5.25 06/03/1998 28 113660 2 4 5.25 06/03/1998 28 118060 Average Note: See page 1 A~ This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the ~ 01AK Page 2 of 4 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 06/04/1998 .97 Business Center II te Rd. & Lakeshore Dr. Texas ~ed field test and cast BATCH TIME: 6:30 am dario Villanueva :ONCRETE: 66 F ~TNO: 711915 'IT WEIGHT (pcO: N/A ICUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3750 3510 363O 4020 4180 4100 120 FRACTURE TYPE tten approval of HBC Engineering, Inc. · CONCRETE COMPR? SIVE STRENGTH Date of Service: 05/06/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 981165 43-245~' Coppell Belt Lit Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete P~,NT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 3-5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 05/06/1998 TIME SAMPLED: 8:06 am BY: WEATHER CONDITIONS: Cloudy TEMPERATURE (F) - AIR 70 V TRUCK NO: 856 TICKI AIR CONTENT (%): 1.4 U5 PLACEMENT LOCATION: See page I SAMPLE LOCATION: Panel 80 REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 3 I 5.00 05/13/1998 7 97440 3 2 5.00 05/13/1998 7 92730 Average 3 3 5.00 06/03/1998 28 113940 3 4 5.00 06/03/1998 28 117720 Average Note: See page 1 A( This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the ~n 01AK Page 3 of 4 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 06/04/1998 .97 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 7:50 am /Iario Villanueva 'ONCRETE: 72 F :TNO: 711923 IT WEIGHT (oeO: N/A ~CUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3450 3280 3370 4030 4160 4100 200 FRACTURE TYPE tten approval of HBC Engineering, Inc. · CONCRETE COMPI F' SIVE STRENGTH Date of Service: 05/06/1998 Report No.: 981165. Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 43-245~ Coppell Belt Lit Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples.** CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days SLUMP: 3-5" PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 05/06/1998 TIME SAMPLED: 8:45 am BY: WEATHER CONDITIONS: Cloudy TEMPERATURE (F) - AIR 71 F ( TRUCK NO: 856 TICKl .97 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 06/04/1998 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCHTIME: 8:35 am /Iario Villanueva IONCRETE: 73 F NO: 711929 AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Panel 82 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 4 1 5.25 4 2 5.25 4 3 5.25 4 4 5.25 Note: See page 1 Technician: Marlo Villanueva Report Distribution: (1) Lincoln Property Company (1) Butler Construction (I) O'Brien & Associates (1} AECC, Inc. AIR CONTENT (%): 2.0 PLACEMENT LOCATION: See page 1 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 05/13/1998 7 99540 05/13/1998 7 89620 Average 06/03/1998 28 111090 06/03/1998 28 109210 Average Al Started: 4:00 am Finished: 9:00 am ~ (1) City of Coppell/Bldg. Insp. (1) City of Coppcll/Constr. insp. (I) Mullen & Powell Techoistructures This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the w~ IT WEIGHT (pc0: N/A :CUMULATIVE YARDS: 224 COMPRESSIVE STRENGTH (psi) 3520 3170 3350 3930 3860 3900 FRACTURE TYPE Engineer Eugene Harbour Vice President ittcn approval of HBC Engineering, Inc. 01AK Page 4 of 4 · CONCRETE COMPRESSIVE STRENGTH Date of Service: 05/06/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 981167: 43-2455 Coppell Belt Lit Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi: compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: ! 6 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi ~ 28 Days 3-5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCR£TE CLASS: 9373 PLACEMEWr DATE: 05/06/1998 TIME SAMPLED: 9:20 am BY: WEATHER CONDITIONS: Cloudy TEMPERATURE (1~ - AIR 80 F TRUCK NO: 553 TICKI AIR CONTENT (%): 2.0 uN PLACEMENT LOCATION: Building C, comer columns 12, 13, 16, 60, 62 SAMPLE LOCATION: Column 16 CYLINDER MARKED SET NO. MEASURED SLUMP DATE AGE (inches) TESTED (days) 1 I 5.00 05/13/1998 1 2 5.00 05/13/1998 1 3 5.00 06/03/1998 1 4 5.00 06/03/1998 REPORT OF TESTS MAXIMUM Note: Samples obtained at point of discharge LOAD (Ibs.~e) 7 104660 7 108840 Average 28 141940 28 143840 Average of pump hose. A( This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the w 01AK Page I of 2 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 06/04/1998 ¸97 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 8:30 am /lario Villanueva ONCRETE: 76 V ;TNO: 711927 IT WEIGHT (pcf): N/A 66 CUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3700 3850 3780 5020 5090 5060 10 FRACTURE TYPE tten approval of HBC Engineering, inc. .CONCRETE COMPIL SIVE STRENGTH Date of Service: 05/06/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 981167', 43-245~ Coppell Belt Lit Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi ~ 28 Days 3-5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9373 PLACEMENT DATE: 05/06/1998 TIME SAMPLED: 1 !.'45 am BY: WEATHER CONDITIONS: Cloudy TEMPERATURE (F) - AIR 88 F ( TRUCK NO: 550 TICK1 AIR CONTENT (%): 1.7 UN PLACEMENT LOCATION: See page I SAMPLE LOCATION: Column 60 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 2 I 5.00 2 2 5.00 2 3 5.00 2 4 5.00 Note: See page 1 REPORT OF TESTS DATE TESTED 05/13/1998 05/13/1998 MAXIMUM AGE LOAD (days) (lbs. force) 7 97400 7 106010 Average 28 141350 28 141490 Average 06/03/1998 06/03/1998 A( Technician: Mario Villanueva Report Distribution: (I) Lincoln Property Company (I) Butler Construction (I) O'Brien & Associates (I) AECC, Inc. Started: 9:00 am Finished: 12:30 I--~ (1) City of Coppell/BIdg. insp. (1) City of Coppell/Constr. Insp. (I) Mullen & Powell Technistructures This report is exclusively for the use o£the client indicated above and shall not be reproduced except in full without the wr ENGIN-EERING, INC. 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Report Date 06/04/1998 ~97 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 11; 10 am /lario Villanueva ONCRETE: 83 F :TNO: 711948 ~TWEIGHT(pc0: N/A ~UMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3440 3750 3600 5000 5000 5000 120 FRACTURE TYPE J Engineer Eugene Harbour Vice President tten approval of HBC Engineering, Inc. 01AK Page 2 of 2