Northlake 635(3)-LR 980609.IN-PLACE DENSITY r"ESTING
Date of Service:
Client No.:
Client:
Services:
05/29/I 998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
in-place density testing.
CONTRACTOR: Butler Construction
MOISTURE DENSITY RELATIONS:
M/D No. Description
Reddish/tan clayey sand w/cb's
TEST
NO TEST LOCATION
Report No.: 981390
Project No.: 43-245:
Project: Coppell
Belt Li~
Coppell
PROJECT DATA
Laboratory Test Method:
Field Test Method:
Maximum
ASTI~
ASTI~
ASTI~
Moisture % Density pcf
13.5 115.5
FIELD DENSITY TESTS
M/D MOISTURE
No. (%)
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
.97
Report Date
06/09/1998
Business Center II
~e Rd. & Lakeshore Dr.
Texas
D-698
D-2922
D-3017
Project Requirements
NE Corner
592 70'S, Lift I I 13.7
593 170'S, Lift 1 1 13.9
594 230'S, Lift 1 I 13.6
SE Corner
595 100'S, Lift I 1 13.9
596 200'S, Lift I 1 14.0
597 300'S, Lift ! 1 13.9
598 400'S, Lift I I 14.1
599 500'S, Lift 1 I 14.3
600 600'S, Lift I I 14.1
SW Corner
601 100'N, Lift I l 13.5
This report is exclusively tbr the usc office client indicated abovc and shall not bc reproduced except in full without thc m
Moisture Density
±2% 95%
DRY DENSITY DENSITY
(pcO (% max)
112.7 98
112.8 98
113.2 98
112.4 97
111.9 97
112.3 97
112.4 97
112.5 97
112.0 97
112.7 98
ittcn approval of HBC Engineering, Inc.
07TMI' Page 1 of 2
· Report No.: 9813902
TEST MID MOISTURE
NO TEST LOCATION No. (%)
602 200'N, Lift i I 13.6
NW Corner
603 100'E, Lift I 1 13.9
604 200'E, Lift 1 1 13.9
605 300'E, Lift I 1 14.1
606 400'E, Lift I I 13.9
607 500'E, Lift 1 1 13.7
608 600'E, Lift I I 13.9
Test results on this report meet project specification.
Pourstrip Backfill
Building "C" Interior
Technician: Tex King
Report Distribution:
( I ) Lincoln Property Company
( I ) Butler Construction
( l ) O'Bricn & Associates
( I } AECC. Inc.
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the w~
(1) City of Coppell/Bldg. Insp.
(1) City of Coppell/Constr. Imp.
(I) Mullcn & Powell Teehnistmctures
07TMP Page 2 of 2
111.9 97
112.2 97
112.7 98
113.1 98
113.3 98
113.3 98
H~'~ring, Inc.
Paul D. Smith, P.E.
S mior Project Engineer
itten approval of HBC Engineering, Inc.
111.7 97
DRY DENSITY DENSITY
(pcO (% max)
· IN-PLACE DENSITY STING
Date of Service:
Client No.:
Client:
Services:
05/26/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
In-place density testing.
CONTRACTOR: Butler Construction
MOISTURE DENSITY RELATIONS:
M/D No. Description
1 Med bm silty clay w/organics
TEST
NO TEST LOCATION
Report No.: 981353
Project No.: 43-2451
Project: Coppell
Belt Lix
Coppell
PROJECT DATA
Laboratory Test Method: ASTI~
Field Test Method:
ASTI~
ASTIX
Maximum
Moisture % Density pcf
23.5 99.0
FIELD DENSITY TESTS
M/D MOISTURE
No. (%)
NYV Corner
573 90'E, Lift I 1 26.1
573 180'E, Lift 1 1 26.5
576 270'E, Lift 1 1 26.9
577 360'E, Lift 1 1 26.5
578 450°E, Lift 1 1 26.7
579 540°E, Lift 1 1 26.3
580 630'E, Lift 1 1 26.6
NE Corner
581 100'S, Lift 1 1 26.5
582 200'S, Lift 1 1 26.9
SE Corner
583 130'W, Lift 1 1 26.3
584 260'W, Lift 1 1 26.5
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the va
07TMP Page 1 of 2
ENGINF~Rlbi3, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
.97
Report Date
06/09/1998
D-698
D-2922
D-3017
Project Requirement~
Moisture Density
+2% 93%
DRY DENSITY DENSITY
(pcO (% max)
93.0 94
93.1 94
93.7 95
93.6 95
93.2 94
92.8 94
93.0 94
93.0 94
93.7 95
93.2 94
93.4 94
itten approval of HBC Engineeriug, Inc.
Business Center II
te Rd. & Lakeshore Dr.
Texas
· Report No.: 9813537
TEST
NO
M/D MOISTURE
TEST LOCATION No. (%)
585 340'W, Lift 1
586 470'W, Lift 1
587 550'W, Lift 1
588 650'W, Lift 1
SW Corner
589 50'N, Lift 1
590 150'N, Lift 1
591 230'N, Lift 1
1 26.4
1 26.5
1 26.5
1 . 26.5
1 26.7
1 26.9
1 26.7
Test results on this report meet project specification.
Interior pourstrip backfill at Building C.
DRY DENSITY
(pcO
93.6
93.1
93.2
93.0
93.1
93.4
93.1
DENSITY
(% ma~
95
94
94
94
94
94
94
Technician: Tex King
Report Distribution:
(I) Lincoln Property Company
(I) Butler Construction
( I ) O'Brien & Associates
(I) AECC, Inc.
(I) City of Coppell/Bidg. Insp.
(i) City of Coppell/Constr. lnsp.
(I) Mullen & Powell Technistmctures
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri
07TMP Page 2 of 2
I--~ E~-~ing,
P
S,
Inc.
aul D. Smith, P.E.
mior Project Engineer
tten approval of HBC Engineering, Inc.