Loading...
Northlake 635(3)-LR 980609.IN-PLACE DENSITY r"ESTING Date of Service: Client No.: Client: Services: 05/29/I 998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 in-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: M/D No. Description Reddish/tan clayey sand w/cb's TEST NO TEST LOCATION Report No.: 981390 Project No.: 43-245: Project: Coppell Belt Li~ Coppell PROJECT DATA Laboratory Test Method: Field Test Method: Maximum ASTI~ ASTI~ ASTI~ Moisture % Density pcf 13.5 115.5 FIELD DENSITY TESTS M/D MOISTURE No. (%) ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 .97 Report Date 06/09/1998 Business Center II ~e Rd. & Lakeshore Dr. Texas D-698 D-2922 D-3017 Project Requirements NE Corner 592 70'S, Lift I I 13.7 593 170'S, Lift 1 1 13.9 594 230'S, Lift 1 I 13.6 SE Corner 595 100'S, Lift I 1 13.9 596 200'S, Lift I 1 14.0 597 300'S, Lift ! 1 13.9 598 400'S, Lift I I 14.1 599 500'S, Lift 1 I 14.3 600 600'S, Lift I I 14.1 SW Corner 601 100'N, Lift I l 13.5 This report is exclusively tbr the usc office client indicated abovc and shall not bc reproduced except in full without thc m Moisture Density ±2% 95% DRY DENSITY DENSITY (pcO (% max) 112.7 98 112.8 98 113.2 98 112.4 97 111.9 97 112.3 97 112.4 97 112.5 97 112.0 97 112.7 98 ittcn approval of HBC Engineering, Inc. 07TMI' Page 1 of 2 · Report No.: 9813902 TEST MID MOISTURE NO TEST LOCATION No. (%) 602 200'N, Lift i I 13.6 NW Corner 603 100'E, Lift I 1 13.9 604 200'E, Lift 1 1 13.9 605 300'E, Lift I 1 14.1 606 400'E, Lift I I 13.9 607 500'E, Lift 1 1 13.7 608 600'E, Lift I I 13.9 Test results on this report meet project specification. Pourstrip Backfill Building "C" Interior Technician: Tex King Report Distribution: ( I ) Lincoln Property Company ( I ) Butler Construction ( l ) O'Bricn & Associates ( I } AECC. Inc. This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the w~ (1) City of Coppell/Bldg. Insp. (1) City of Coppell/Constr. Imp. (I) Mullcn & Powell Teehnistmctures 07TMP Page 2 of 2 111.9 97 112.2 97 112.7 98 113.1 98 113.3 98 113.3 98 H~'~ring, Inc. Paul D. Smith, P.E. S mior Project Engineer itten approval of HBC Engineering, Inc. 111.7 97 DRY DENSITY DENSITY (pcO (% max) · IN-PLACE DENSITY STING Date of Service: Client No.: Client: Services: 05/26/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 In-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: M/D No. Description 1 Med bm silty clay w/organics TEST NO TEST LOCATION Report No.: 981353 Project No.: 43-2451 Project: Coppell Belt Lix Coppell PROJECT DATA Laboratory Test Method: ASTI~ Field Test Method: ASTI~ ASTIX Maximum Moisture % Density pcf 23.5 99.0 FIELD DENSITY TESTS M/D MOISTURE No. (%) NYV Corner 573 90'E, Lift I 1 26.1 573 180'E, Lift 1 1 26.5 576 270'E, Lift 1 1 26.9 577 360'E, Lift 1 1 26.5 578 450°E, Lift 1 1 26.7 579 540°E, Lift 1 1 26.3 580 630'E, Lift 1 1 26.6 NE Corner 581 100'S, Lift 1 1 26.5 582 200'S, Lift 1 1 26.9 SE Corner 583 130'W, Lift 1 1 26.3 584 260'W, Lift 1 1 26.5 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the va 07TMP Page 1 of 2 ENGINF~Rlbi3, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 .97 Report Date 06/09/1998 D-698 D-2922 D-3017 Project Requirement~ Moisture Density +2% 93% DRY DENSITY DENSITY (pcO (% max) 93.0 94 93.1 94 93.7 95 93.6 95 93.2 94 92.8 94 93.0 94 93.0 94 93.7 95 93.2 94 93.4 94 itten approval of HBC Engineeriug, Inc. Business Center II te Rd. & Lakeshore Dr. Texas · Report No.: 9813537 TEST NO M/D MOISTURE TEST LOCATION No. (%) 585 340'W, Lift 1 586 470'W, Lift 1 587 550'W, Lift 1 588 650'W, Lift 1 SW Corner 589 50'N, Lift 1 590 150'N, Lift 1 591 230'N, Lift 1 1 26.4 1 26.5 1 26.5 1 . 26.5 1 26.7 1 26.9 1 26.7 Test results on this report meet project specification. Interior pourstrip backfill at Building C. DRY DENSITY (pcO 93.6 93.1 93.2 93.0 93.1 93.4 93.1 DENSITY (% ma~ 95 94 94 94 94 94 94 Technician: Tex King Report Distribution: (I) Lincoln Property Company (I) Butler Construction ( I ) O'Brien & Associates (I) AECC, Inc. (I) City of Coppell/Bidg. Insp. (i) City of Coppell/Constr. lnsp. (I) Mullen & Powell Technistmctures This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri 07TMP Page 2 of 2 I--~ E~-~ing, P S, Inc. aul D. Smith, P.E. mior Project Engineer tten approval of HBC Engineering, Inc.