Loading...
Northlake 635(3)-LR 980610.IN-PLACE DENSITY '"ESTING Date of Service: Client No.: Client: Services: 05/30/1998 526 ! 7000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 In-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: M/D No. Description 1 Reddish Tan Clayey Sand w/CB's Report No.: 981395 Project No.: 43-245: Project: Coppel] Belt Lit Coppell PROJECT DATA Laboratory Test Method: ASTI~ Field Test Method: 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 ASTI~ ASTI~ Maximum Moisture % Density pcf 13.5 115.5 FIELD DENSITY TESTS TEST M/D MOISTURE NO TEST LOCATION No. (%) SW Corner 609 100'E, Final 1 13.2 610 200'E, Final 1 13.6 611 300'E, Final 1 13.4 612 400'E, Final I 13.7 613 500'E, Final 1 13.5 614 600'E, Final 1 13.9 SE Corner 615 100'N, Final 1 14.0 616 200'N, Final 1 13.7 NE Corner 617 150'N, Final 1 13.6 618 300'N, Final I 13.7 This report is exclusively tbr thc usc of the client indicated above and shall not be reproduced except in full without thc wi 07TMP Page 1 of 2 -97 Report Date 06/10/1998 Business Center II te Rd. & Lakeshore Dr. Texas D-698 D-2922 D-3017 Project Requirements Moisture Density ±2% 95% DRY DENSITY DENSITY (pcf) (% max) 112.7 98 113.2 98 112.2 97 112.2 97 112.7 98 111.9 97 112.4 97 112.3 97 112.2 97 112.4 97 ittcn approval of HBC Enginccring, Inc. · Report No.: 9813951 TEST NO M/D MOISTURE TEST LOCATION No. (%) 619 450'N, Final 620 600'N, Final 621 680'N, Final Interior Pourstrip I 14.0 I 14.4 1 13.7 Test resul~ on this repo~ meet project specification. Backfill, Building C DRY DENSITY DENSITY (PcO (% max) 112.3 97 111.5 97 111.9 97 Technician: Tcx King Report Distribution: (I) Lincoln Property Company (I) Butler Construction ( I ) O'Brien & Associates (I) AECC, Inc. ( 1 ) City of Coppell/Bldg. Insp. ( I ) City of Coppell/Constr. Insp. (I) Mullen & Powell Technistructures This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri 07TMP Page 2 of 2 Se nior Project Engineer xen approval of HBC Engineering, Inc. · CONCRETE COMPRr' SIVE STRENGTH TE "F Date of Service: 05/11/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 981207 43-245~ Coppell Belt Lii Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples.** PROJECT DATA SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 4" min., 5" max N/A ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Panel 14 -97 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 06/10/1998 Business Center II .e Rd. & Lakeshore Dr. Texas ed field test and cast CONCRETE CLASS: 9337 PLACEMENT DATE: 05/1 1/1998 BATCH TIME: N/A TIME SAMPLED: 7:30 am aY: lpel Ratliff WEATHER CONDITIONS: Warm, ~lear, light wind TEMPERATURE (F) - AIR 71 F (~ONCRETE: 78 F TRUCK NO: 519 TICKtT NO: 712032 AIR CONTENT (%): N/A U~ IT WEIGIrr (pc0: N/A PLACEMENT LOCATION: Building D, Panels 15, 14, 13, 12, 11, 10, 9, :, 7, 6, 5 REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE AGE SET NO. (inches) TESTED (days) 1 1 7.00 05/18/1998 7 1 2 7.00 05/18/1998 7 1 3 7.00 06/08/1998 28 1 4 7.00 06/08/1998 28 A 2CUMULATIVE YARDS: 150 MAXIMUM COMPRESSIVE LOAD STRENGTH FRACTURE (lbs. force) (psi) TYPE 86640 3060 88320 3120 Average 3090 105790 3740 109220 3860 Average 3800 Note: See comments on page 2. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the 'itten approval of HBC Engineering, Inc. 01AK Page 1 of 3 Report No.: 9812071 Note: Panels 21, 27, 29, 28, S24, S25, 20, 19, 18, 17 and 16 were to technician's arrival. HBC was not notified 24 hours prior to cot placement. Concrete was batched on site and not getting proper mix prior to being placed in forms. Approximately 10 minutes passed fr( of batching until placement of concrete into forms for tilt panels. Superintendent with Butler Construction could not be located in ord~ him of problems. Samples taken from truck discharge; pump hose was accessible. This repot~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the w ~laced prior crete or rotation .m completion r to notify not -itten approval of HBC Engineering, Inc. 01AK Page 2 of 3 .CONCRETE COMPRr'3SIVE STRENGTH TE'" Date of Service: 05/11/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 981207 43-245~ Coppell Belt Lit Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples.** PROJECT DATA SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SlJPPLmR: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 4" min., 5" max N/A ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Panel 6 ENGINEERIlX~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 06/10/1998 -97 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast CONCRETE CLASS: 9337 PLACEMENT DATE: 05/11/1998 BATCH TIME: N/A TIME SAMPLED: 9:00 am BY: Del Ratliff WEATHER CONDITIONS: Warm, (~lear, light wind TEMPERATURE (F) - AIR 74 t~ ~ONCRETE: 80 F TRVCKNO: 519 TICI~T NO: 712042 Ub IT WEIGHT (pc0: N/A AIR CONTENT (%): N/A PLACEMENT LOCATION: See page 1 REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 2 1 6.50 05/18/1998 7 86300 2 2 6.50 05/18/1998 7 88820 Average 2 3 6.50 06/08/1998 28 113140 2 4 6.50 06/08/1998 28 110820 Average Note: Placement cut back to 300 yds. Panels 8, 9, and 10 had excess amount of dirt and trash in forms. was notified. Slump placement was set by pump operator and water a Started: 7:00 am Finished: 11:00 (1) City ofCoppell/BIdg. Insp. (1) City ofCoppell/Constr. Insp. (1) Mullet] & Powell Technistructures Technician: Del Ratliff Report Distribution: (1) Lincoln Property Company (1) Butler Construction (1) O'Brien & Associates (1) AECC, Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the w 01AK Page 3 of 3 A~ 2CUMULATIVE YARDS: 250 COMPRESSIVE STRENGTH (psi) 3050 3140 3100 4000 3920 3960 ',uperintendent {ded by same. Il¢. [Eug~fie Harbour Vice President FRACTURE TYPE · iaea approval of HBC Engineering, Inc.