Loading...
Northlake 635(3)-LR 980629.CONCRETE COMPRr"SSI STRENGTH TE'"Y Date of Service: 05/30/1998 Report No.: 981394 Client No.: 52617000 Project No.: 43-245: Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppel Belt Lil Coppel Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 05/30/1998 TIME SAMPLED: 5:35 am BY: WEATHER CONDITIONS: Clear, TEMPERATURE (F) - AIR 75 F TRUCK NO: 806 TIC] AIR CONTENT (%): N/A ur PLACEMENT LOCATION: Paving; see attached diagram SAMPLE LOCATION: REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 1 1 4.50 06/06/1998 7 106520 1 2 4.50 06/06/1998 7 105730 Average i 3 4.50 06/27/1998 28 139150 1 4 4.50 06/27/1998 28 146040 Average This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the 01AK Page I of 4 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 -97 Report Date 06/29/1998 Business Center II le Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 5:20 am Damon Cited aim ~ONCRETE: 80 F ETNO: 712368 iIT WEIGHT (pc0: N/A '.CUMULATIVE YARDS: 60 COMPRESSIVE STRENGTH (psi) 3770 3740 3760 4920 5160 5040 FRACTURE TYPE ritten approval of HBC Engineering, Inc. CONCRETE COMPR '3SIVE STRENGTH TES'"? Date of Service: 05/30/1998 Report No.: 981394~ Client No.: 52617000 Project No.: 43-245~ Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppell Belt Lit Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENaTI~: 4000 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 05/30/1998 TIME SAMPLED: 6:45 am BY: WEATHER CONDITIONS: Clear, TEMPERATURE (F) - AIR 77 F ~ TRUCK NO: 768 TICK AIR CONTENT (%): N/A Ur PLACEMENT LOCATION: Paving; see attached diagram SAMPLE LOCATION: CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 2 1 5.50 06/06/1998 7 105350 2 2 5.50 06/06/1998 7 104030 Average 2 3 5.50 06/27/1998 28 147400 2 4 5.50 06/27/1998 28 150680 Average This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the v 01AK Page 2 of 4 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 .97 Report Date 06/29/1998 Business Center II .e Rd. & Lakeshore Dr. Texas 'ed field test and east BATCH TIME: 6:25 am )amon Elrod dm ;ONCRETE: 84 F gTNO: 712376 IIT WEIGHT (per): N/A UCUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 373O 3680 3710 5210 5330 5270 130 FRACTURE TYPE ritten approval of HBC Engineering, Inc. .CONCRETE COMPRr'3SIVE STRENGTH TE'"r Date of Service: 05/30/1998 Report No.: 981394 Client No.: 52617000 Project No.: 43-245~ Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppel Belt Li~ Coppel Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENaTH: 4000 psi @ 28 Days 5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEME~rr DATE: 05/30/199~ TIME SAMPLED: 8:25 am BY: WEATHER CONDITIONS: Sunny, TEMPERATURE (F) - AIR 82 F ~ TRUCK NO: 806 TICK AIR CONTENT (%): N/A ur PLACEMENT LOCATION: Paving; see attached diagram SAMPLE LOCATION: REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 3 I 6.00 06/06/1998 7 99470 3 2 6.00 06/06/1998 7 101770 Average 3 3 6.00 06/27/1998 28 156220 3 4 6.00 06/27/1998 28 159330 Average This report is exclusively for the use oftbe client indicated above and shall not be reproduced except in full without the 01AK Page 3 of 4 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 -97 Report Date 06/29/1998 Business Center II te Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 8:05 am 3amon Elrod :aim ~ONCRETE: 84 F ETNO: 712388 tiT WEIGHT (pc0: N/A ACCUMULATIVE YARDS: 250 COMPRESSIVE STRENGTH (psi) 3520 3600 3560 5520 5630 5580 FRACTURE TYPE ritten approval of HBC Engineering, Inc. CONCRETE COMPR[' SIVE STRENGTH TE 'N2 Date of Service: Client No.: Client: Services: 05/30/1998 Report No.: 981394~ 52617000 Project No.: 43-2455 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell Belt Lit Coppell Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. Butler Construction Pioneer Concrete CONTRACTOR: CONCRETE SUPPLIER: PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days SLUMP: 5" AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: 9351 05/30/1998 ENGINEERII~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 ¸97 Report Date 07/07/1998 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: N/A TIME SAMPLED: 9:20 am BY: l])amon Elrod WEATHER CONDITIONS: Sunny, ~ight wind TEMPERATURE (F)- AIR 79 F (~ONCRETE: 85 TRUCKNO: 813 TICI~TNO: 712394 AIR CONTENT (%}: N/A PLACEMENT LOCATION: Paving; see attached diagram REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE AGE SET NO. (inches) TESTED (days) 4 1 7.00 06/06/1998 7 4 2 7.00 06/06/1998 7 4 3 7.00 06/27/1998 28 4 4 7.00 06/27/1998 28 F Ul~ IT WEIGHT (pc0: N/A ~Avg. of 3 Sets: 4920 psi - This set ~omplies with psi when evaluated in accordance with ACI 318. Technician: Damon Elrod Report Distribution: (1) Lincoln Property Company (1) Butler Construction (1) O'Brien & Associates (1) AECC, Inc. Al MAXIMUM LOAD (lbs. force) 72900 74630 Average 112060 109740 Average project requireme: Started: 3:30 am Finished: 10:30 2CUMULATIVE YARDS: 310 COMPRESSIVE STRENGTH (psi) 2580 2640 2610 3960 3880 3920 ~ tts for 4000 ( 1 ) City of Coppell/Bldg. lnsp. ( I ) City of Coppell/Constr. Insp. (1) Mullen & Powell Technistmctures ~~l~Inc. ~tE'ugen~Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the w FRACTURE TYPE 'itten approval of HBC Engineering, Inc. 01AK Page 4 of 4