Loading...
Northlake 635(3)-LR 980702CONCRETE COMPR ' SIVE STRENGTH Date of Service: 06/01/1998 Report No.: 981403 Client No.: 52617000 Project No.: 43-245~ Client: L i ncoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppel'~ Belt Li~ CoppeY Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENaTH: 4000 psi ~ 28 Days 3-5" 3-6% ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 06/01/1998 TIME SAMPLED: 8:28 am BY: WEATHER CONDITIONS: Clear TEMPERATURE (F)- AIR 80 F TRUCK NO: 1842 TIC~ AIR CONTENT (%): 4.3 ur PLACEMENT LOCATION: Parking lot at northwest corner of Building SAMPLE LOCATION: 75'S/28'W of NW corner CYLINDER MARKED SET NO. MEASURED SLUMP (inches) ! I 5.25 1 2 5.25 I 3 5.25 I 4 5.25 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 06/08/1998 7 93930 06/08/1998 7 92700 Average 06/29/1998 28 116840 06/29/1998 28 114240 Average Technician: Marlo Viilanueva Report Distribution: (I) Lincoln Prnper~y Company (I) Butler Construction (I) O'Brien & Associates (I) AECC, Inc. Started: 8:00 am Finished: 9:30 am I'~ (i) City of Coppcll/Bldg. lnsp. (1) City ofCoppcll/Constr, lnsp. (1) Mullen & Powcll Tcchnistructurcs This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the x~ ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 .97 Report Date 07/02/1998 Business Center II te Rd. & Lakeshore Dr. Texas ed field test and cast BATCHTIME: 8:20 am vlario Villanueva 7ONCRETE: 72 F ST NO: 712422 liT WEIGHT (pc0: N/A ~CUMULATIVE YARDS: 220 COMPRESSIVE STRENGTH (psi) 3320 3280 3300 4130 4040 4090 FRACTURE TYPE Eugene Harbour Vice President ritten approval of HBC Engineering, Inc. OIAK Page I of I .IN-PLACE DENSITY r' STING Date of Service: Client No.: Client: Services: 06/20/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 In-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: M/D No. Description 1 Reddish tan clayey sand with - clay balls TEST NO TEST LOCATION 691 692 Bldg B, 693 Bldg B, 694' Bldg B, 695 Bldg B, 696 Bldg B, 697 Bldg B, 698 Bldg B, 699 Bldg B, NE corner, 700 Bidg B, NE corner, 701 Bldg B, NE corner, 07SS Report No.: 981592 Project No.: 43-245~ Project: Coppell Belt Li[ Coppell PROJECT DATA Laboratory Test Method: Field Test Method: ASTI~ ASTI~ ASTI~ Maximum 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 .97 Report Date 07/02/1998 Business Center II ~e Rd. & Lakeshore Dr. Texas D-698 D-2922 D-3017 Project Requirements Moisture % 13.5 Density pcf 115.5 FIELD DENSITY TESTS Interior Grade Beam Backfill Bldg B, SW corner 70' N, Select, 2nd lift SW corner 150' N, Select, 2nd lift SW corner 270' N, Select, 2nd lift SW corner 350' N, Select, 2nd lift NW corner 60' E, Select, 2nd lift NW corner 140' S, Select, 2nd lift NE corner, 50' S, Select, 2nd lift NE corner, 110' S, Select, 2nd lift 200' S, Select, 2nd lift 270' S, Select, 2nd lift 360' S, Select, 2nd lift Moisture Density M/D MOISTURE (%) 1 13.7 1 13.9 I 13.6 1 13.9 I 14.2 1 14.1 I 14.2 I 13.9 1 13.7 1 13.8 1 13.5 -2/+2% 95% DRY DENSITY DENSITY (pcl) (% max) 113.1 98 112.7 98 112.8 98 112.7 98 113.3 98 113.1 98 113.2 '98 112.7 98 112.6 98 112.8 98 112.7 98 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wr Page I of 2 itten approval of HBC Engineering, Inc. Report No.: 9815928 TEST MID MOISTURE NO TEST LOCATION No. (%) 702 703 BIdg B, SE corner, 60' W, Select, 2nd lift 1 13.6 BIdg B, SE corner, 130' W, Select, 2nd lift 1 13.9 Test results on this report meet project specification. DRY DENSITY DENSITY (OCt') (% max) 112.8 98 112.8 98 Technician: Tex King Report Distribution: (1) Lincoln Property Company (1) Butler Construction (1) O'Brien & Associates (I) AECC, Inc. This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wri ( I ) City of Coppell/BIdg. lnsp. ( I ) City of Coppell/Constr. lnsp. (I) Mullen & Powell Technistructures 07SS Page 2 of 2 H~ En~ng, Inc. P:tul D. Smith, P.E. S¢ nior Project Engineer tten approval of HBC Engineering, Inc.