Loading...
Northlake 635(3)-LR 980706.CONCRETE COMPR;"SSIVE STRENGTH Date of Service: 06/02/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 981415: 43-245; Coppell Belt Lit Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENaT~: 4000 psi @ 28 Days 4-6" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 06/02/1998 TIME SAMPLED: 6:30 am BY: WEATHER CONDITIONS: Clear, TEMPERATURE (F) - AIR 76 F TRVC~:NO: 849 TICm AIR CONTENT (%): 4.0 PLACEMENT LOCATION: Firelane between Buildings A & B, northwes~ SAMPLE LOCATION: 100'W/60'N CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) I 1 7.75 06/09/1998 7 92080 1 2 7.75 06/09/1998 7 95610 Average 1 3 7.75 06/30/1998 28 124930 I 4 7.75 06/30/1998 28 122630 Average A~ This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the 01AK Page I of 3 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/06/1998 ¸97 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 5:35 am ~,eith Fowler ~ol ONCRETE: 82 F :TNO: 712456 IT WEIGHT (pct): N/A comer of Building A ~CUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3260 3380 3320 4420 4340 4380 50 FRACTURE TYPE" itten approval of HBC Engineering, Inc. .CONCRETE COMPR " SIVE STRENGTH TE. Date of Service: 06/02/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 9814151 43-2452 Coppell Belt Lin Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requil compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STREN(;Tm 4000 psi ~ 28 Days 4-6" 3-6% ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 06/02/1998 TIME SAMPLED: 7:30 am BY: WEATHER CONDITIONS: Clear, TEMPERATURE (F) - AIR 74 TRUCK NO: 832 AIR CONTENT (%): 5.1 PLACEMENT LOCATION: See page I SAMPLE LOCATION: 10'E/100'N CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 2 1 5.50 06/09/1998 7 111990 2 2 5.50 06/09/1998 7 105650 Average 2 3 5.50 06/30/1998 28 156710 2 4 5.50 06/30/1998 28 158410 Average This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri 01AK Page 2 of 3 .97 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/06/1998 Business Center II e Rd. & Lakeshore Dr. Texas FRACTURE TYPE tten approval of HBC Engineering, Inc. BATCH TIME: 6:55 am 2eith Fowler ~ol F CONCRETE: 86 F TlCm.T NO: 712467 UN IT WEIGHT (pc0: N/A A( CUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3960 3740 3850 5540 5600 5570 ed field test and cast 150 .CONCRETE COMPR SIVE STRENGTH TE? 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 06/02/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Services: SLUMP: AIR: TEST METHOD: CONTRACTOR: CONCRETE SUPPLIER: PLANT: SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 4-6" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 98 43-2452 Coppell Belt Lin, Coppell, -97 Business Center II ~ Rd. & Lakeshore Dr. Texas 3 I 5.00 3 2 5.00 3 3 5.00 3 4 5.00 Technician: Keith Fowler Report Distribution: (l) Lincoln Property Company (1) Butler Construction (1) O'Brien & Associates (l) AECC, Inc. REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 06/09/1998 06/09/1998 7 103510 7 105280 Average 28 148270 28 149910 Average 06/30/1998 06/30/1998 Started: 4:00 am Finished: 12:30 I--~ ( 1 ) City of Coppell/Bldg. Insp. (!) City of Coppell/Constr. Insp. (1) Mullen & Powell Technistructures AC Tiffs report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wi 01AK Page 3 of 3 WEATHER CONDITIONS: Clear, w~ TEMPERATURE (F)-AIR 78 F C~ TRUCK NO: 801 TICKE AIR CONTENT (%): 5.0 UNI PLACEMENT LOCATION: See page I CYLINDER MEASURED MARKED SLUMP SET NO. (inches) ~rm )NCRETE: 88 F rNO: 712474 T WEIGHT (pcf): N/A UUMULATIVE YARDS: 220 UOMPRESSIVE STRENGTH (psi) 3660 3720 3690 5240 5300 5270 Engin~c. ageno-l~f'rbour Vice President ten approval of HBC Engineering, Inc. FRACTURE TYPE Report Date 07/06/1998 SAMPLE LOCATION: 100°N/140'E Obtain samples of fresh concrete at the placement locations, perform requlr :d field test and cast compressive strength samples. PROJECT DATA Butler Construction CONCRETE CLASS: 9351 Pioneer Concrete PLACEMENT DATE: 06/02/1998 BATCH TIME: 7:51 am 16 TIME SAMPLED: 8:30 am BY: g.eith Fowler .IN-PLACE DENSITYr"ESTING Date of Service: Client No.: Client: Services: 06/29/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 ha-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: M/D No. Description I Reddish tan clayey and with clay balls Report No.: 981684 07SS Project No.: 43-245: Project: Coppel Belt Lil Coppei PROJECT DATA Laboratory Test Method: ENGINEERII~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Field Test Method: AST~ AST~ AST~ Maximum Moisture % Density pcf 13.5 115.5 -97 Report Date 07/07/1998 Business Center II le Rd. & Lakeshore Dr. Texas D-698 { D-2922 4D-3017 Project Requirements FIELD DENSITY TESTS TEST M/D MOISTURE NO TEST LOCATION No. (%) Interior Grade Beam Backfill 704 Building B, NW corner, 50 feet east, Final lift 1 13.3 705 Building B, NW corner, 180 feet east, Final lift. 1 13.5 706 Building B, NE corner, 60 feet south, Final lift 1 13.4 707 Building B, NE corner, 130 feet south, Final lift 1 13.7 708 Building B, NE corner, 200 feet south, Final lift. I 13.6 709 Building B, NE comer, 270 feet south, Final lift 1 13.9 710 Building B, NE corner, 330 feet south, Final lift 1 13.3 711 Building B, NE corner, 400 feet south, Final lift I 13.6 712 Building B, SE corner, 50 feet west, Final lift 1 13.1 713 Building B, SE corner, 170 feet west, Final lift 1 13.5 714 Building B, SW corner, 50 feet north, Final lift 1 13.2 Moisture Density -2/+2% 95% DRY DENSITY DENSITY (pcO (% max) 111.9 97 111.5 97 112.2 97 111.2 96 111.5 97 111.0 96 111.3 96 112.0 97 111.9 97 111.7 97 111.9 97 This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the ~ Page 1 of 2 ritten approval of HBC Engineering, Inc. Report No.: 9816847 ,~' TEST M/D MOISTURE NO TEST LOCATION No. (%) Building B, SW corner, 150 feet north, Final lift 1 13.6 Building B, SW corner, 230 feet north, Final lift 1 13.7 Building B, SW corner, 300 feet north, Final lift 1 13.3 Building B, SW corner, 370 feet north, Final lift I 13.6 Building B, SW corner, 420 feet north, Final lift I 13.4 Test results on this report meet project specification. 715 716 717 718 719 Technician: Tex King Report Distribution: (I) Lincoln Property Company (!) Butler Construction ( I ) O'Brien & Associates (I) AECC, Inc. (I) City of Coppell/Bldg. Insp. ( I ) City of Coppell/Constr. Insp. (I) Mullen & Powell Technistructures This report is exclusively lbr the use of the client indicated above and shall not be reproduced except in full without the wr DRY DENSITY DENSITY (pc0 (% max) 111.7 97 111.8 97 111.0 96 110.5 96 110.9 96 .. En , Inc. ~ul D. Smith, P.E. mior Project Engineer .tten approval of HBC Engineering, Inc. 07SS Page 2 of 2