Loading...
Northlake 635(3)-LR 980707CONCRETE COMP1L SIVE STRENGTH TE? Date of Service: 06/03/1998 Report No.: 981427~ Client No.: 52617000 Project No.: 43-2452 Client: Lincoll~ Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppell Belt Lin Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requil compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 06/03/1998 TIME SAMPLED: 7:30 am BY: WEATHER CONDITIONS: Warm, TEMPERATURE {F) - AIR 80 F TRUCK NO: 1843 TICK! AIR CONTENT (%): N/A liN PLACEMENT LOCATION: Leaveout around inside perimeter west and sc SAMPLE LOCATION: 60'N/5'E of SW bldg. corner CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 I 5.50 06/10/1998 I 2 5.50 06/10/1998 1 3 5.50 07/01 / 1998 1 4 5.50 07/01/1998 REPORT OF TESTS MAXIMUM AG E LOAD (days) (lbs. force) 7 93540 7 97310 Average 28 114450 28 112740 Average A( Technician: Del Ratliff Report Distribution: (!) Lincoln Property Company (I) Butler Construction (I) O'Brien & Associates (I) AECC, lnc. Started: 5:00 am Finished: 9:00 am (1) City of Coppell/BIdg. Insp. (I) City ofCoppell/Constr, lnsp. (I) Mullen & Powell Technistructures -97 ENGINEER]lq3, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/07/1998 Business Center II : Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 6:45 am )el Ratliff azy, light wind ONCRETE: 88 F rNO: 712494 T WEIGHT (pcf): N/A atheast sides of Building C slab-on-grade :CUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3310 3440 3380 4050 3990 4020 lnc. Vice President 20 FRACTURE TYPE This report is exclusively tbr the use of the client indicated above aqd shall not be reproduced except in full without the w itten approval of HBC Engineering, Inc. 01AK Page I of I .IN-PLACE DENSITY "ESTING Date of Service: Client No.: Client: Services: 06/30/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 In-place density testing. CONTRACTOR: Butler Construction r~ Report No.: 981698 Project No.: 43-245; Project: Coppel] Belt Li~ Coppell MOISTURE DENSITY RELATIONS: PROJECT DATA Laboratory Test Method: ASTI~ 07ss Field Test Method: Maximum ASTI~ ASTI~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 .97 Report Date 07/07/1998 Business Center II te Rd. & Lakeshore Dr. Texas D-698 D-2922 D-3017 Project Requirements M/D No. TEST NO 720 721 722 723 724 725 726 727 728 729 730 Description Light gray, reddish and medium brown shaley clay Interior Building Building Building Building Building Building Building Building Building Building Building Moisture % Density pcf 23.5 98.5 FIELD DENSITY TESTS TEST LOCATION Grade Beam Backfill D, NW corner, 60 feet east, 2nd lift D, NW corner, 70 feet east, 1st lift D, NW corner, 180 feet east, 2nd lift D, NW comer, 190 feet east, 1st lift D, NW corner, 260 feet east, 2nd lift D, NW corner, 270 feet east, 1st lift D, NW corner, 360 feet east, 2nd lift D, NW corner, 370 feet east, 1st lift D, NE corner, 100 feet south, 2nd lift D, NE corner, 110 feet south, 1 st lift D, NE comer, 230 feet south, 2nd lift M/D MOISTURE No. (%) Moisture 1 26.9 1 27.0 1 27.3 1 27.1 1 27.2 1 27.1 1 27.3 1 26.9 I 26.7 1 26.6 I 27.1 Tiffs report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the w Page I of 2 % or above DRY DENSITY (pcO Density 92% DENSITY (% max) 91.7 93 91.5 93 91.7 93 91.8 93 91.2 93 91.3 93 91.1 93 91.4 93 91.7 93 92.1 94 91.9 93 · itten approval of HBC Engineering, Inc. Report No.: 9816988 TEST NO TEST LOCATION 240 feet south, 1st lift 390 feet south, 2nd lift 400 feet south, 1st lift 500 feet south, 2nd lift 510 feet south, 1st lift 50 feet west, 2nd lift 60 feet west, 1st lift 130 feet west, 2nd lift 140 feet west, ist lift 290 feet west, 2nd lift 300 feet west, I st lift 380 feet west, 2nd lift 390 feet west, 1st lift 80 feet north, 2nd lift 90 feet north, 1st lift 170 feet north, 2nd lift 180 feet north, Ist lift 290 feet north, 2nd lift 300 feet north, 1st lift 400 feet north, 2nd lift 410 feet north, 1 st lift 500 feet north, 2nd lift 510 feet north, I st lift 731 Building D, NE corner 732 Building D, NE corner 733 Building D, NE corner 734 Building D, NE corner 735 Building D, NE corner 736 Building D, SE corner 737 Building D, SE corner 738 Building D, SE corner 739 Building D, SE corner 740 Building D, SE corner 741 Building D, SE corner 742 Building D, SE conrer 743 Building D, SE corner 744 Building D, SW corner. 745 Buidling D, SW corner. 746 Building D, SW corner. 747 Building D, SW corner. 748 Building D, SW corner. 749 Building D, SW corner. 750 Building D, SW corner 751 Building D, SW corner. 752 Building D, SW corner. 753 Building D, SW corner. Technician: Tex King Report Distribution: (I) Lincoln Property Company (I) Butler Construction (I) O'Brien & Associates (I) AECC, Inc. MID MOISTURE No. (%) 26.8 27.1 26.7 26.9 26.6 27.1 26.9 27.3 27.1 26.9 26.6 27.1 26.8 26.7 26.5 27.1 27.0 27.3 27.1 26.9 26.7 26.7 26.6 Test results on this report meet project specification. (I) City ofCoppell/Bldg. Insp. (I) City of Coppell/Constr. Insp. (I) Mullen & Powell Technistmctures This report is exclusively fur the use of the client indicated above and shall not be reproduced except in full without the wr DRY DENSITY (pcf) DENSITY (% max) 92.2 94 91.7 93 91.5 93 91.3 93 92.2 94 91.7 93 91.1 93 91.3 93 92.2 94 92.3 94 92.1 94 91.7 93 91.0 92 91.2 93 91.5 93 91.7 93 91.9 93 91.5 93 91.3 93 91.6 93 91.8 93 92.2 94 91.7 93 ing, Inc. ~ul D. Smith, P.E. ',nior Project Engineer tten approval of HBC Engineering, Inc. 07SS Page 2 of 2