Northlake 635(3)-LR 980708.IN-PLACE DENSITY""ESTING
Date of Service:
Client No.:
Client:
Services:
07/02/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
ha-place density testing.
CONTRACTOR: Butler Construction
MOISTURE DENSITY RELATIONS:
M/D No. Description
1 Reddish tan clayey sand with
clay balls
TEST
NO TEST LOCATION
07SS
Report No.: 981720
Project No.: 43-2452
Project: Coppell
Belt Lit
Coppell
PROJECT DATA
Laboratory Test Method:
Field Test Method:
ASTI~
ASTI~
ASTI~
Maximum
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
,97
Report Date
07/08/1998
Business Center II
~e Rd. & Lakeshore Dr.
Texas
D-698
D-2922
D-3017
Project Requirements
Moisture %
13.5
Density pcf
115.5
FIELD DENSITY TESTS
Interior Grade Beam Backfill
773 Building D, SE corner, 60 feet north, Final lift
774 Building D, SE corner, 200 feet north, Final lift
775 Building D, SE corner, 300 feet north, Final lift
776 Building D, SE corner, 400 feet north, Final lift
777 Building D, SE corner, 500 feet north, Final lift
778 Building D, NE corner, 50 feet west, Final lift
779 Building D, NE corner, 200 feet west, Final lift
780 Building D, NE corner, 300 feet west, Final lift
781 Building D, NE corner, 400 feet west, Final lift
782 Building D, NW corner, 50 feet south, Final lift
783 Building D, NW corner, 200 feet south, Final lift
Moisture Density
M/D
MOISTURE
(%)
1 13.9
1 13.6
1 13.8
1 13.4
1 13.6
1 13.8
1 13.5
1 13.7
1 13.9
1 13.8
1 13.9
-2/+2% 95%
DRY DENSITY DENSITY
(pcO (% max)
111.9 97
111.2 96
111.7 97
112.2 97
111.2 96
111.7 97
111.8 97
111.6 97
111.9 97
112.3 97
111.7 97
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the w~
Page I of 2
ittcn approval of HBC Engineering, Inc.
,.Report No.: 9817200
TEST
NO TEST LOCATION
Building D, NW corner, 300 feet south, Final lift
Building D, NW corner, 400 feet south, Final lift
Building D, NW corner, 500 feet south, Final lift
Building D, SW corner, 40 feet east, Final lift
Building D, SW corner, 150 feet east, Final lift
Building D, SW corner, 250 feet east, Final lift
Building D, SW corner, 370 feet east, Final lift
784
785
786
787
788
789
790
Technician: Tex King
Report Distribution:
(I) Lincoln Property Company
(I) Butler Construction
(I) O'Brien & Associates
(I) AECC, Inc.
MID MOISTURE
No. (%)
1 13.6
1 13.7
1 13.9
1 13.5
1 13.7
1 13.9
I 13.8
Test results on this report meet project specification.
(I) City ofCoppell/Bldg. Insp.
( I ) City of Coppell/Constr. Insp.
(I) Mullen & Powell Technistructures
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wr
DRY DENSITY
(pcf)
112.2
111.2
111.2
111.9
111.7
112.0
111.8
DENSITY
(% max)
97
96
96
97
97
97
97
~ En , Inc.
aul D. Smith, P.E.
mior Project Engineer
ittcn approval of HBC Enginccring, Inc.
07SS Page 2 of 2
.IN-PLACE DENSITY STING
Date of Service:
Client No.:
Client:
Services:
O7/01/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
In-place density testing.
CONTRACTOR: Butler Construction
Report No.: 981708:
Project No.: 43-2455
Project: Coppell
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
07/08/1998
Business Center II
MOISTURE DENSITY RELATIONS:
M/D No.
PROJECT DATA
Laboratory Test Method:
Field Test Method:
07SS
Description
Maximum
Moisture % Density pcf
Reddish tan clayey sand with
clay balls
13.5 115.5
FIELD DENSITY TESTS
TEST
NO
TEST LOCATION
M/D
Interior Grade Beam Backfill
Building D, SW corner, 50 feet north, 1st lift
754
755 Building D, SW comer,
756 Building D, SW corner,
757 Building D, SW corner
758 Building D, SW corner
759 Building D, SW corner
760 Building D, NW corner
761 Building D, NW corner
762 Building D, NW corner
763 Building D, NW corner
764 Building D, NE corner
160 feet north, 1st lift
230 feet north, 1st lift
340 feet north, 1st lift
440 feet north, 1st lift
500 feet north, 1st lift
60 feet east, 1st lift
120 feet east, 1 st lift
330 feet east, 1st lift
400 feet east, 1st lift
70 feet south, 1st lift
Belt Lin
Coppell
ASTN
ASTN
ASTN
MOISTURE
(%)
e Rd. & Lakeshore Dr.
Texas
D-698
l D-2922
lD-3017
Project Requirements
Moisture Density
-2/+2% 95%
1 13.7
1 13.5
1 13.6
1 13.3
1 13.5
1 13.7
1 13.3
1 13.6
1 13.5
1 13.5
1 13.7
DRY DENSITY DENSITY
(pcl) (% max)
111.7 97
111.5 97
111.7 97
111.9 97
111.6 97
111.7 97
112.0 97
111.8 97
111.9 97
111.5 97
111.7 97
This report is exclusively lbr the use of the client indicated above and shall not be reproduced except in full without the w:
Page I of 2
itten approval of HBC Engineering, Inc.
.Report No.: 9817085
TEST
NO
765
766
767
768
769
770
771
772
TEST LOCATION
MfD MOISTURE
No. (%)
Building D, NE corner, 190 feet south, 1st lift
Building D, NE corner, 310 feet south, 1st lift
Building D, NE corner, 410 feet south, 1st lift
Building D, NE corner, 500 feet south, 1st lift
Building D, SE corner, 50 feet west, 1st lift
Building D, SE corner, 130 feet west, 1st lift
Building D, SE corner, 260 feet west, 1st lift
Building D, SE corner, 330 feet west, 1st lift
1 13.6
1 13.4
1 13.2
1 13.6
1 13.4
1 13.5
1 13.7
1 13.6
Test results on this report meet project specification.
DRY DENSITY
(pcO
111.9
111.5
111.0
111.5
111.2
111.3
111.6
111.3
DENSITY
(% max)
97
97
96
97
96
96
97
96
Technician: Tex King
Report Distribution:
(I) Lincoln Property Company
(I) Butler Construction
(I) O'Brien & Associates
(I) AECC, Inc.
(1) City ofCoppell/Bldg. Insp.
( I ) City of Coppell/Constr. lnsp.
(I) Mullen & Powell Technistructures
I'"I~ Ending, Inc.
aul D. Smith, P.E.
,nior Project Engineer
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the ~
07SS Page 2 of 2
ittcn approval of HBC Engineering, Inc.
CONCRETE COMPR SIVE STRENGTH
Date of Service: 06/26/1998 Report No.: 981662,
Client No.: 52617000 Project No.: 43-245~
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppell
Belt Lit
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5" max
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 06/26/1998
TIME SAMPLED: 6:45 am BY:
WEATHER CONDITIONS: Clear,
TEMPERATURE (FI - AIR 81 F (
TRIJCK NO: 1 882 TICK
AIR CONTENT (%): N/A ur
PLACEMENT LOCATION:
Paving, north and east of Building A, 225' so
to center of north face of bldg. and approach
SAMPLE LOCATION: 15'W/I 5'S from fire hydrant
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
1 1 5.50 07/03/1998
I 2 5.50 07/03/1998
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 109660
7 104750
Average
I 3 5.50 07/24/1998 28
I 4 5.50 07/24/1998 28
A4
Note: Concrete delayed about one and a half hours.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the v
01AK Page I of 4
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
.97
Report Date
07/08/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and east
BATCH TIME: N/A
)can Martin
'indy
:ONCRETE: 93 F
~TNO: 712617
'IT WEIGHT (pc0: N/A
;th from NE comer of bldg. to north approach
20' west of Belt Line to 50' west of Belt Line
2CUMULATIVE YARDS: 60
COMPRESSIVE
STRENGTH
(mi)
3880
3700
3790
FRACTURE
TYPE
fitten approval of HBC Engineering, Inc.
CONCRETE COMP1L ' SIVE STRENGTH TE?
Date of Service: 06/26/1998
Report No.: 981662~
Client No.: 52617000 Project No.: 43-2452
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppell
Belt Lin
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requn
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5" max
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE Ct~SS: 9351
PLACEMENT DATE: 06/26/1998
TIME SAMPLED: 7:32 am BY:
WEATHER CONDITIONS: Sunny,
TEMPERATURE (F) - AIR 80 F
TRUCK NO: 845 TICKI
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: See below
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
2 1 5.50 07/03/1998 7 95740
2 2 5.50 07/03/1998 7 93420
Average
2 3 5.50 07/24/1998 28
2 4 5.50 07/24/1998 28
A(
Sample location: 57'N from fire hydrant and 10'E from W end of pay.
This report is exclusively for thc usc of the client indicated above and shall not be reproduced except in full without thc wr
01AK Page 2 of 4
.97
ENG~Nq~JNG, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/08/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 7:10 am
)can Martin
~indy
ONCRETE: 90 F
',T NO: 712623
IT WEIGHT (pc0: N/A
!CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
3390
3300
3350
120
FRACTURE
TYPE
rig.
:tten approval of HBC Engineering, Inc.
CONCRETE COMPRI' SIVE STRENGTH TE r" _
Date of Service: 06/26/1998 Report No.: 981662z
Client No.: 52617000 Project No.: 43-2452
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppell
Belt Lin
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform reqml
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENaTm 4000 psi ~ 28 Days
5" max
N/A
ASTM C- ! 43
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 06/26/1998
TIME SAMPLED: 9:25 am BY:
WEATHER CONDITIONS: Sunny,
TEMPERATURE (F) - AIR 86 F
TRUCK NO: 8115 TICm
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: 27'S from NEC of bldg., 30'W/E end
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
3 I 6.50 07/03/1998 7 97950
3 2 6.50 07/03/1998 7 93420
Average
3 3 6.50 07/24/1998 28
3 4 6.50 07/24/1998 28
A~
Note: Water added by others; technician notified superintendent.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the ~
01AK Page 3 of 4
8901 Carpenter Frwy. Suite #100
Dallas, Texas 75247
,97
Report Date
07/08/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 8:40 am
)ean Martin
vindy
ONCRETE: 91 F
:TNO: 712633
IT WEIGHT (pcf): N/A
2CUMULATIVE YARDS: 2 ! 0
COMPRESSIVE
STRENGTH
(psi)
3460
3300
3380
FRACrURE
TYPE
itten approval of HBC Engineering, Inc.
CONCRETE COMPRI SIVE STRENGTH TE?
Date of Service: 06/26/1998
Report No.: 9816624
Client No.:
Client:
Services:
52617000 Project No.: 43-2452
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project:
Coppell
Belt Lin~
Coppell,
Obtain samples of fresh concrete at the placement locations, perform requir
compressive strength samples.
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
.97
Report Date
07/08/1998
Business Center II
~ Rd. & Lakeshore Dr.
Texas
.~d field test and cast
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5" max
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: 45'N from NE corner of bldg.
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
4 I 6.00 07/03/1998
4 2 6.00 07/03/1998
4 3 6.00 07/24/1998
4 4 6.00 07/24/1998
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 06/26/1998
TIME SAMPLED: 11:25 am BY: 1~
WEATHER CONDITIONS: Sunny, v
TEMPERATURE (F) - AIR 91 F C
TRUCK NO: 768 TICK[
AIR CONTENT (%): N/A UN:
PLACEMENT LOCATION:
See page !
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 98720
7 95300
Average
28
28
A£
BATCH TIME: 10:35 am
,can Martin
,indy
~)NCRETE: 91 F
TNO: 712642
T WEIGHT (pc0: N/A
CUMULATIVE YARDS: 300
COMPRESSIVE
STRENGTH
(psi)
3490
3370
3430
FRACTURE
TYPE
01AK
Technician: Dean Martin
Report Distribution:
(1) Lincoln Propcrty Company
(l) Butler Construction
(I) O'Brien & Associates
(I) AECC, Inc.
Started: 3:00 am Finished: 2:00 pm H~
(1) City of Coppell/Bldg. Insp.
(1) City of Coppell/Constr. Insp.
(I) Mullen & Powell Technistructures
This report is exclusively for the use of the client indicated above aqd shall not be reproduced except in full without the wt
Page 4 of 4
~ Engin
Eugene Harbour
Vice President
ittcn approval of HBC Enginecring, Inc.