Loading...
Northlake 635(3)-LR 980710CONCRETE COMPRr' SIVE STRENGTH Date of Service: 06/29/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 981678, 43-2452 Coppell Belt Lit Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTIt: 4000 psi @ 28 Days 5" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Same PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 06/29/1998 TIME SAMPLED: 5;30 am BY: ] WEATHER CONDITIONS: Clear, Ii TEMPERATURE (F)-AIR 82 F ( TRUCK NO: 410 TICKi AIR CONTENT (%): 3.6 V~ PLACEMENT LOCATION: Paving; see attached diagram REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) I I 4.50 07/06/1998 7 107670 Al 1 2 4.50 07/27/1998 28 I 3 4.50 07/27/1998 28 This report is exclusively for the use of the client iudicated above and shall not be reproduced except in full without the ~ 01AK Page I of 4 8901 Carpenter Frwy., Suite gl{N} Dallas, Texas 75247 ,97 Report Date 07/10/1998 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCHTIME: 5:23 am )amon Elrod ght wind :ONCRETE: 90 F :~T NO: 712660 iX WEIGHT (pet): N/A ~CUMULATIVE YARDS: 60 COMPRESSIVE STRENGTH FRACTURE (psi} TYPE 3810 'itten approval of HBC Engineering, Inc. -CONCRETE COMPR SIVE STRENGTH TE. "ITM Date of Service: 06/29/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 981678 43-245~ Coppell Belt Li~ Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: ] 6 SPECIFICATION REQUIREMENTS STRENGTfI: 4000 psi ~ 28 Days 5" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 06/29/1998 'FIME SAMPLED: 7:20 am BY: WEATHER CONDITIONS: Cloudy TEMPERATURE (F) - AIR 83 F TRUCK NO: 551 TICI~ AIR CONTENT (%): 3.5 UI~ PLACEMENT LOCATION: Paving; see attached diagram SAMPLE LOCATION: Same REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 2 I 4.50 07/06/1998 7 105670 2 2 4.50 07/27/1998 28 2 3 4.50 07/27/I 998 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the v 01AK Page 2 of 4 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/10/1998 .97 Business Center II ~e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 7:05 am )amon Elrod light wind ~'ONCRETE: 90 F ~.T NO: 712668 !iT WEIGHT (pcf): N/A 2CUMULATIVE YARDS: 150 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 3740 tten approval of HBC Engineering, Inc. CONCRETE COMPR SIVE STRENGTH TE, Date of Service: 06/29/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 981678. 43-245: Coppell Belt Lit Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTtl: 4000 psi ~ 28 Days 5" 3-6% ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 06/29/1998 TIME SAMPLED: 8:35 am BY: WEATHER CONDITIONS: Partly TEMPERATURE (F) - AIR 85 F ~ TRUCK NO: 512 TICK AIR CONTENT (%): 3.7 tlr PLACEMENT LOCATION: Paving; see attached diagram SAMPLE LOCATION: Same REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 3 1 5.00 07/06/1998 7 90110 A~ 3 2 5.00 07/27/1998 28 3 3 5.00 07/27/1998 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the 01AK Page 3 of 4 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/10/1998 .97 Business Center II te Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: N/A )amon Elrod ~oudy, light wind 2ONCRETE: 91 F ~.T NO: 712680 'IT WEIGHT (pcf): N/A ~CUMULATIVE YARDS: 250 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 3190 -itten approval of HB~ Engineering, Inc. CONCRETE COMPR SIVE STRENGTH TE. 7 Date of Service: 06/29/1998 Report No.: 981678, Client No.: Client: 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project No.: 43-245~ Project: Coppell Belt Lit Coppell Services: Obtain samples of fresh concrete at the placelnent locations, perform requi compressive strength samples. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/10/1998 .97 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and east SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 5" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Same CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 4 1 4.50 4 2 4.50 4 3 4.50 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 06/29/1998 TIME SAMPLED: 10:00 am BY: WEATHER CONDITIONS: Partly TEMPERATURE (F)-AIR 87 F TRUCK NO: 410 TICKI AIR CONTENT (%): 3.7 PLACEMENT LOCATION: Paving; see attached diagram REPORT OF TESTS DATE AGE TESTED (days) · 07/06/1998 7 07/27/1998 28 07/27/1998 28 MAXIMUM LOAD (lbs. force) 90720 Al BATCH TIME: 9:34 am )amon Elrod oudy, light wind 'ONCRETE: 92' F :TNO: 712687 IT WEIGHT (pef): N/A :CUMULATIVE YARDS: 320 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 3210 Technician: Damon Elrod Report Distribution: (i) Lincoln Property Company (I) Butler Construction (l) O'Brien & Associates (I) AECC, Inc. 01AK Started: 3:30 am Finished: 11:00 I'~ (I) City ofCoppell/Bldg. Insp. (I) City of Coppell/Constr. Insp. (I) Mullen & Powell Technistructures This report is exclusively Ibr the use of the client indicated above and shall not be reproduced except in full without the wl Page 4 of 4 ~. Engin Eugene Harbour Vice President itten approval of HBC Engineering, Inc. I I I' CONCRETE COMPR SIVE STRENGTH TES"? Date of Service: 06/09/1998 Report No.: 981481 Client No.: 52617000 Project No.: 43-245: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppel Belt Li~ Coppel Services: Obtain samples of fresh concrete at the placement locations, perform requ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 5" 3-5% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 06/09/199~ TIME SAMPLED: 6:15 am BY: WEATHER CONDITIONS: Partly TEMPERATURE (F) - AIR 78 F TRUCK NO: 803 TIC', AIR CONTENT (%): 3.0 U1 PLACEMENT LOCATION: Paving, south side of Building C SAMPLE LOCATION: 200'E/W from SEC of bldg., 25'S/N REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 1 1 5.00 06/16/1998 7 110180 1 2 5.00 06/16/1998 7 106630 Average 1 3 5.00 07/07/1998 28 140020 1 4 5.00 07/07/1998 28 137480 Average This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the 01AK Page I of 5 ENGINEERING, INC. 8901 Carpenter Frwy. Suite #100 Dallas, Texas 7~247 Report Date 07/10/1998 -97 Business Center II te Rd. & Lakeshore Dr. Texas ed field test and cast ; BATCH TIME: Ferry L. Smith loudy 2ONCRETE: 81 F ETNO: 712509 41T WEIGHT (pcl): N/A 5:59 am CCUMULATIVE YARDS: 60 COMPRESSIVE STRENGTH (psi) 3900 3770 3840 4950 4860 4910 FRACTURE TYPE ritten approval of HBC Engineering, Inc. CONCRETE COMPR " SIVE STRENGTH TEAC'"7_ Date of Service: 06/09/1998 Report No.: 9814811 Client No.: 52617000 Project No.: 43-2452 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell Belt Li~ Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi~ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" 3-5% ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 06/09/1998 T[MESAMPLED: 7:35 am BY: WEATHER CONDITIONS: Partly TEMPERATURE (F) - Am 81 F TRUCK NO: 849 TICm AIR CONTENT (%): 3.2 PLACEMENT LOCATION: Sec page I SAMPLE LOCATION: 120'E/W, 15'S/N from SEC of bldg. REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SL[JMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 2 1 6.50 06/16/1998 7 110390 2 2 6.50 06/16/1998 7 109210 Average 2 3 6.50 07/07/1998 28 130060 2 4 6.50 07/07/1998 28 133800 Average A( This report is exclusively for the use of the client indicated abov9 and shall not be reproduced except in full without the 01AK Page 2 of 5 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/I0/1998 -97 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: N/A 'erry L. Smith oudy ONCRETE: 83 F XNO: 712533 IT WEIGHT (pcO: N/A ;CUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3900 3860 3880 4600 4730 4670 170 FRACTURE- TYPE itten approval of HBC Engineering, Inc. · CONCRETE COMPR,_ SIVE STRENGTH Date of Service: 06/09/1998 Report No.: 98148 Client No.: 52617000 Project No.: 43-24.' Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppel] Belt Li~ Coppel] Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CO~ACrOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" 3-5% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 06/09/1998 TIME SAMPLED: 9:35 am BY: WEATHER CONDITIONS: Clear, TEMPERATURE (F) - AIR 84 F ~ TRUCK NO: 849 TICK AIR CONTENT (%): 3.5 U~ PLACEMENT LOCATION: Sec page I SAMPLE LOCATION: 165'W/E, 45'S/N from SWC of bldg. CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 3 1 6.50 06/16/1998 7 102700 3 2 6.50 06/16/1998 7 98460 Average 3 3 6.50 07/07/1998 28 120070 3 4 6.50 07/07/1998 28 122470 Average This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the 01AK Page 3 of 5 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date ' 07/10/1998 -97 Business Cent6r II te Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 9:26 am Ferry L. Smith Jnny 2ONCRETE: 82 F STNO: 712520 lIT WEIGHT (pc0: N/A 2CUMULATIVE YARDS: 240 COMPRESSIVE STRENGTH (psi) 3630 3480 3560 4250 4330 4290 FRACTURE TYPE · itten approval of HBC Engineering, Inc. .CONCRETE COMPR? SIVE STRENGTH Date of Service: 06/09/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 981481 43-245~ Coppel] Belt Li~ Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days SLUMP: 5" AIR: 3-5% TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 90'W/E, 10'S/N from SWC of bldg. PROJECT DATA .97 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/10/1998 Business Center II te Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIMEs N/A CONCRETE CLASS: 9351 I'LACEMENT DATE: 06/09/1998 TIME SAMPLED: 10:50 am BY: Terry L. Smith WEATHER CONDITIONS: Sunny, ~lear TEMPERATVRE(F)-Am 90 F ~ONCRETE: 89 TRUCK NO: 843 TlC~I~T NO: 712545 U~ AIR CONTENT (%): 3.2 PLACEMENT LOCATION: See page I REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 4 1 5.00 06/16/1998 7 108300 4 2 5.00 06/16/1998 7 112030 Average 4 3 5.00 07/07/1998 28 125420 4 4 5.00 07/07/1998 28 121190 Average IT WEIGHT (pcO: N/A ~CUMULATIVE YARDS: 400 COMPRESSIVE STRENGTH (psi) 3830 3960 3900 4440 4290 4370 A~ This report is exclusively for the use of the client indicated above and shall not be repmduccd except in full without the v~ 01AK Page 4 of 5 FRACTURE TYPE ittcn approval of HBC Engineering, Inc. · CONCRETE COMPR? SIVE STRENGTH TE? Date of Service: 06/09/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 981481 43-245~ Coppel] Belt Li~ Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 9-8 Days SLUMP: 5" AIR: 3-5% TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 60'W/E, 45'S/N from SWC of bldg. PROJECT DATA CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 5 1 5.00 5 2 5.00 5 3 5.00 5 4 5.00 Technician: Terry L. Smith Report Distribution: (1) Lincoln Property Company (1) Butler Construction (I) O'Brien & Associates (I) AECC, Inc. -97 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/10/1998 Business Center II ~e Rd. & Lakeshore Dr. Texas ed field test and cast CONCRETE CLASS: 9351 PLACEMENT DATE: 06/09/1998 TIME SAMPLED: 12:00 pm BY: ~'erry L. Smith WEATHER CONDITIONS: Sunny, ~:lear TEMPERATURE (F) - AIR 92 F (~ONCRETE: 91 TRUCK NO: 725 TICI~T NO: 712552 AIR CONTENT (%): 3.0 PLACEMENT LOCATION: See page 1 REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) BATCH TIME: 1 1:40 am DATE TESTED 06/16/1998 06/16/1998 07/07/1998 07/07/1998 7 104240 7 106580 Average 28 124330 28 123770 Average U~ Started: 4:00 am Finished: 2:30 pm I--~ (1) City of Coppell/BIdg. lnsp. (1) City ofCoppell/Constr, lnsp. (1) Mullen & Powell Technistructures Tiffs report is exclusively for tire use of the client indicated above and shall not be reproduced except in full without the w 'IT WEIGHT (pc0: N/A ~CUMULATIVE YARDS: 470 COMPRESSIVE STRENGTH (psi) 3690 3770 3730 4400 4380 4390 FRACTURE TYPE En~ Eugeffe Harbour Vice President 'itten approval of HBC Engineering, Inc. 01AK Page 5 of 5 CONCRETE COMPResSIVE STRENGTH Date of Service: Client No.: Client: Services: 06/30/1998 Report No.: 981692~ 52617000 Project No.: 43-2452 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell Belt Lin Coppell: Obtain samples of fresh concrete at the placement locations, perform requi~ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" max. N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 06/30/1998 TIME SAMPLED: 6:39 am BY: WEATHER CONDITIONS: Sunny, -TEMPERATURE (F) - AIR 85 F TRUCK NO: 1854 TICKi AIR CONTENT (%): N/A uN PLACEMENT LOCATION: Slab leaveout, Building A, east wall and Buil, SAMPLE LOCATION: 120' S from NE corner REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED I 1 6.50 07/07/1998 I 2 6.50 07/07/1998 MAXIMUM AGE LOAD (days) (lbs. force) 7 89960 7 91540 Average 1 3 6.50 07/28/1998 28 I 4 6.50 07/28/1998 28 A( Water was added without technician's approval. Technician: Dean Martin Report Distribution: (l) Lincoln Property Company (I) Butler Construction (i) O'Brien & Associates (I) AECC, Inc. Started: 3:00 am Finished: 8:00 am (I) City ofCoppell/BIdg, lnsp. (I) City ofCoppell/Constr. Insp. (I) Mullen& Powell Technistructures -97 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/10/1998 Business Center II ,~ Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 6:20 am )ean Martin ight wind ONCRETE: 88 F :T NO: 712696 IT WEIGHT (pc0: N/A ling C at southeast comer ~CUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3180 3240 " 3210 10 FRACTURE TYPE This report is exclusively for the usc of thc client indicated above and shall not be reproduced except in full without the w Vice President itten approval of HBC Engineering, Inc. 01SS Page I of I