Loading...
Northlake WE P10C-LR 970131FUGRO-McCLELLAND (SOUTHWEST), INC. i -~. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Site Concrete Report Date: January 31, 1997 PROJECT: Northlake Woodlands 10C, Coppell, Texas Project No.: 0761-2105 SAMPLE DATE: January 24, 1997 CONTRACTOR: Site Concrete TICKET NO.: N/A CONCRETE SUPPLIER: Site Concrete AMBIENT TEMP. (°F): 51 PLANT/TRUCK: On site CONCRETE TEMP. (°F): 56 MIX ID NUMBER: N/^ TIME BATCHED: N/A AIR (%) (ASTM C-231) N/A TIME SAMPLED: 8:45 am WATER ADDED (gal): N/A WEATHER CONDITION: Clear SLUMP (inches) (ASTM C-143) 5 1/4 LOCATION OF PLACEMENT: Paving: Alley G, station 7+00 'CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) NLW 65 7 01/31/97 105000 3714 3000/28 days NLW 66 28 02/21/97 NLW 67 28 02/21/97 NLW 68 Hold Specifications: Making & Curing: ASTM C-31 Testing Methods: ASTM C-143, ASTM C-39 REMARKS: Technician: Hal Patterson FUGRO-McCLELLAND (SOUTHWEST), INC. Checked By: ("'" / SMH/rm Distribution: Site Concrete - Mike Boney Site Concrete - Jean Boney Northlake Woodlands Development - Steve Parsons -=i~ FUGRO-McCLELLAND (SOUTHWEST), INC. - 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Site Concrete Report Date: January 31, 1997 PROJECT: Northlake Woodlands 10C, Coppell, Texas Project No.: 0761-2105 I.I. ':.:' ::~... .:- ..... SAMPLE DATE: JanUary.-23, 1997 - - - ..-:i . i:.!.' i-".!-:~!'~:i:~1 CONTRACTOR: Site Concrete TICKET NO.: N/A CONCRETE SUPPLIER: On site AMBIENT TEMP. (°F): 57 PLANT/TRUCK: N/A CONCRETE TEMP. (°F): 59 MIX ID NUMBER: N/A TIME BATCHED: 10:45 am AIR (%) (ASTM C-231) N/A TIME SAMPLED: 10:50 am WATER ADDED (gal): N/A WEATHER CONDITION: Overcast SLUMP (inches) (ASTM C-143) 4.0 LOCATION OF PLACEMENT: Paving: South most point of radius, 2 feet north from curb on Mallard -- 'CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS': ..... " i: ..- standard 6" x 12'', 28.27 square inches- ~ ' CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) NLW 61 7 01/30/97 120000 4245 3000/28 days NLVV 62 28 02/20/97 NLW 63 28 02/20/97 NLW 64 Hold Specir~.ations: Making & Curing: ASTM C-31 Testing Methods: ASTM C-143. ASTM C-39 REMARKS: Technician: Scott Rogers FUGRO-McCLELLAND (SOUTHWEST), INC. Checked By: ~ SMH/rm Distribution: Site Concrete - Mike Boney Site Concrete - Jean Boney Northlake Woodlands Development - Steve Parsons FUGRO-McCLELLAND (SOUTHWEST), INC. i -'_ 2880 virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Site Concrete Report Date: January 31, 1997 PROJECT: Northlake Woodlands 10C, Coppell, Texas Project No.: 0761-2105 [' :' '" '. "iSAMPLEDATE::::Januaryi24, t997:: :-"-i~i. ::' :::':-~:-' CONTRACTOR: Site Concrete TICKET NO.: N/A CONCRETE SUPPLIER: Site Concrete AMBIENT TEMP. (°F): 51 PLANT/TRUCK: On site CONCRETE TEMP. (°F): 56 MIX ID NUMBER: N/A TIME BATCHED: N/A AIR (%) (ASTM C-231) N/A TIME SAMPLED: 8:45 am WATER ADDED (gal): N/A WEATHER CONDITION: Clear SLUMP (inches) (ASTM C-145) 5 1/4 LOCATION OF PLACEMENT: Paving: Alley G, station 7+00 --:' cONCRETE CYLINDER COMPRESSIVE STRENGTH:TESTS' ...... ' Standard 6" x 12", 28.27:. Square inches. -~-' CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) NLW 65 7 01/31/97 105000 3714 3000/28 days NLW 66 28 02/21/97 NLW 67 28 02/21/97 NLW 68 Hold Specifications: Making & Curing: ASTM C-31 Testing Methods: ASTM C-143, ASTM C-39 REMARKS: Technician: Hal Patterson FUGRO-McCLELLAND (SOUTHWEST), INC. Checked By: C'""' / SMH/rm Distribution: Site Concrete - Mike Boney Site Concrete - Jean Boney Northlake Woodlands Development - Steve Parsons