Loading...
Northlake 635(3)-LR 980716REPORT OF STRUC, 'TRAL STEEL INSPECT"DN Date of Service: 07/09/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Services: Structural steel inspection. Report No.: 9817571 Project No.: 43-2452 Project: Coppell Belt Lit Coppell On this date, an HBC Engineering representative arrived at the above jobsite as scheduled for structural steel inspection on the roof dec representative sample of decking attachments have been inspected wit following results. Building B: 1. Interior supports welded at 12 inch centers in lieu of 6 in¢ general notes on structural drawings. 2. Weldout incomplete at deck end supports along various roof openings. Building A: 1. Perimeter and interior supports welded at 12 inch centers in lieu of 6 inch per general notes on structural drawings. 2. Perimeter deck support angle butt splice connections not welded continuous on vertical leg at various locations. 3. Various incomplete areas noted and marked with orange paint. These discrepancies have been reported to the general contractor. ENGINEERII~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 -97 Report Date 07/16/1998 Business Center II e Rd. & Lakeshore Dr. Texas referenced ~ing. A h the h per Technician: Royce Tomlin Report Distribution: (l) Lincoln Property Company (I) Butler Construction (I) O'Brien & Associates (I) AECC, Inc. 99SS (1) City ofCoppell/Bldg. Insp. ( I ) City of Coppell/Constr. Insp. (I) Mullen & Powell Technistructures lnc. " ' S~n~/Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wi itten approval of HBC Engineering, Inc. Page I of 1