Northlake 635(3)-LR 980717REPORT OF STRUC STEEL INSPEC N
Date of Service: 07/10/1998
Client No.: 52617000
Report No.: 981757
Project No.: 43-245; .97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/17/1998
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Services: Structural steel inspection.
Project: Coppell
Belt Li~
Coppel]
Business Center II
~e Rd. & Lakeshore Dr.
Texas
On this date, an HBC Engineering representative arrived at the abow
jobsite as scheduled for structural steel inspection on roof deckin¢
B and Building A. The following items have been reinspected.
Refer to Structural Steel Inspection Report #9817578, dated
07/09/98, Item #1 - Deck ends marked for repair at roof opei
have been completed. Remaining discrepancies (on Building
are outstanding.
Refer to Structural Steel Inspection Report #9817578, dated
07/09/98, Item #2, Building A - Discrepant conditions noted
referenced
on Building
L~ngs
~)
along south wall have not been corrected.
Technician: Royce Tomlin
Report Distribution:
(I) Lincoln Property Company
( l ) Butler Constructio.
(1) O'Brien & Associates
(I) AECC, h~c.
(I) City ol'Coppell/Bldg, lnsp.
( 1 ) City of Coppell/Co,str. lnsp.
( l ) Mullen & Powell Technistructures
This report is exclusively tbr tile use of the client indicated above and shall not be reproduced except in full without the,
... En ng, Inc.
aul D. Smith, P.E.
enior Project Engineer
rittcn approval of HBC Engineering, Inc.
99SS Page I of l