Northlake 635(3)-LR 980720CONCRETE COMPR SIVE STRENGTH TE'"F Date of Service: 07/02/1998 Report No.: 98171, Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 43-245~ Coppell Belt Lil Coppel] Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days SLUMP: AIR: PROJECT DATA CONCRETECLASS: 9351 PLACEMENTDATE: 07/02/1998 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 .97 Report Date 07/20/1998 Business Center II te Rd. & Lakeshore Dr. Texas 'ed field test and cast BATCH TIME: 5:05 am TIME SAMPLED: 5:30 am BY: ]~arrin Phillips WEATHER CONDITIONS: Clear ] TEMPERATURE (F) - AIR 84 F t~ONCRETE: 78 F TRUCKNO: 730 TICK~TNO: 712714 AIR CONTENT (%): N/A Ur'IT WEIGHT (pcO: N/A PLACEMENT LOCATION: Paving, southeast end of site REPORT OF TESTS A~ MAXIMUM TEST METHOD: SAMPLE LOCATION: N/A ASTM C-143 ASTM C- 172 ASTM C-39 100'E of 3rd dock door 01AK CYLINDER MEASURED MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 1 1 5.50 07/09/1998 7 110750 I 2 5.50 07/09/1998 7 107860 Average I 3 5.50 07/30/1998 28 I 4 5.50 07/30/1998 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the Page I of 5 2CUMULATIVE YARDS: 30 COMPRESSIVE STRENGTH (psi) 3920 3810 3870 FRACTURE TYPE · itten approval of HBC Engineering, Inc. 'CONCRETE COMP SIVE STRENGTH Date of Service: 07/02/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza]Larry Moon 500 North Akard Street Dallas TX 75201-3394 Services: 981714 43-245~ Coppel] Belt Lil Coppel] CONTRACTOR: CONCRETE SUPPLIER: PLANT: SLUMP: AIR: TEST METHOD: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. Butler Construction Pioneer Concrete 16 SPECIFICATION REQUIREMENTS STRENGTm 4000 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 124'E of 5th dock door 01AK CYLINDER MARKED SET NO. -97 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/20/1998 Business Center II te Rd. & Lakeshore Dr. Texas ed field test and cast PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/02/1998 BATCU TIME: 6:30 am TIME SAMPLED: 6:50 am BY: ]Darrin Phillips WEATHER CONDITIONS: Sunny, ~:lear TEMPERATURE (FI - AIR 86 F CONCRETE: 83 F TRUCKNO: 730 TICK~TNO: 712724 AIR CONTENT (%): N/A w 'IT WEIGHT (pc0: N/A PLACEMENT LOCATION: See page 1 ~CUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 4140 4100 4120 REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 2 1 5.75 07/09/1998 7 117180 2 2 5.75 07/09/1998 7 115870 Average 2 3 5.75 07/30/1998 28 2 4 5.75 07/30/1998 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the v Page 2 of 5 A~ 130 FRACTURE TYPE itten approval of HBC Engineering, Inc. CONCRETE COMPR r' SIVE STRENGTH Date of Service: Client No.: Client: 07/02/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 981714~ Project No.: 43-2452 Project: Coppell Belt Lir Coppeli Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 1 6 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 75'E of 5th lock door PROJECT DATA CONCRETE CLASS: 93 5 1 PLACEMENT DATE: 07/02/1998 TIME SAMPLED: 7:50 am BY: WEATHER CONDITIONS: Sunny, TEMPERATURE (F)-AIR 84 F ( TRUCKNO: 730 TICm AIR CONTENT (%): N/A u~ PLACEMENT LOCATION: See page I REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 3 1 5.50 07/09/1998 3 2 5.50 07/09/1998 MAXIMUM AGE LOAD (days) (lbs. force) 7 109420 7 106550 Average 3 3 5.50 07/30/1998 28 3 4 5.50 07/30/1998 28 This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the 01AK Page 3 of 5 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 -97 Report Date 07/20/1998 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 7:30 am )arrin Phillips :lear 'ONCRETE: 80 F :TNO: 712734 IT WEIGHT (pct): N/A A~2CUMULATIVE YARDS: 230 COMPRESSIVE STRENGTH (psi) 3870. 3770 3820 F~URE TYPE itten approval of HBC Engineering, Inc. · CONCRETE COMPRr' . SIVE STRENGTH Date of Service: 07/02/1998 Client No.: 52617000 Report No.: 981714~ Project No.: 43-245~ .97 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/20/1998 Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Services: SLUMP: AIR: TEST METHOD: Coppell Belt Lit Coppell Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 18'E of 7th dock door Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the ~ 01AK Page 4 of 5 4 3 5.75 07/30/1998 28 4 4 5.75 07/30/1998 28 4 I 5.75 07/09/1998 7 99730 4 2 5.75 07/09/1998 7 92760 Average REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) A~2CUMULATIVE YARDS: 330 COMPRESSIVE STRENGTH (psi) 3530 3280 3410 d itten approval of HBC Engineering, Inc. FRACTURE TYPE AIR CONTENT (%): N/A PLACEMENT LOCATION: See page 1 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/02/1998 BATCH TIME: 9:00 am TIME SAMPLED: 9:40 am BY: l~arrin Phillips WEATHER CONDITIONS: Sunny, ~:lear TEMPERATURE (F) - AIR 86 F (~ONCRETE: 83 F TRUCK NO: 1884 TICK/gT NO: 712745 Ub 1T WEIGHT (pcf): N/A CONCRETE COMPR SIVE STRENGTH Date of Service: Client No.: Client: Services: 07/02/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 981714~ Project No.: 43-2452 Project: Coppell Belt Coppell Obtain samples of fresh concrete at the placement locations, perform requi~ compressive strength samples. .97 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days N/A ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 10'N of 1st island, N to S CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 5 I 5.75 5 2 5.75 5 3 5.75 5 4 5.75 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/02/1998 TIME SAMPLED: 11:15 am BY: WEATHER CONDITIONS: Sunny, TEMPERATURE (F) - AIR 92 F TRUCK NO: 1884 TICm AIR CONTENT (%): N/A u~ PLACEMENT LOCATION: See page I REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 07/09/1998 7 83140 07/09/1998 7 77070 Average 07/30/1998 28 07/30/i 998 28 At Report Date 07/20/1998 Business Center II e Rd. & Lakeshore Dr. Texas Technician: Darrin Phillips Report Distribution: (!) Lincoln Property Company (I) Butler Construction (I) O'Brien & Associates (l) AECC, Inc. Started: 3:00 am Finished: 1:30 pm ~ (l) City of Coppell/Bldg. Insp. ( 1 ) City of Coppell/Constr. Insp. (1) Mu lien & Powell Technistructures This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wi ed field test and cast BATCHTIME: 10:30 am )arrin Phillips ~lear ONCRETE: 84 F :T NO: 728756 IT WEIGHT (pc0: N/A ]CUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 2940 2730 2840 .~'n Engi~c' . Eugene Harbour Vice President 430 FRACTURE TYPE itten approval of HBC Engineering, Inc. 01AK Page 5 of 5 CONCRETE COMPR SIVE STRENGTH Date of Service: 07/10/1998 Report No.: 981770 Client No.: 52617000 Project No.: 43-245: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppel] Belt Lil Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 Batched on Site SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" 3-6% ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/10/1998 TIME SAMPLED: 7:55 am BY: WEATHER CONDITIONS: Clear, ~ TEMPERATURE (F) - AIR 85 F t TRUCK NO: 552 TICK AIR CONTENT (%): 5.3 Ut PLACEMENT LOCATION: Paving, parking in front of Building B SAMPLE LOCATION: Sec attached diagram REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) I 1 7.00* 07/17/1998 7 85320 1 2 7.00* 07/17/1998 7 84950 Average 1 3 7.00' 08/07/1998 28 I 4 7.00* 08/07/1998 28 A * Note: Contractor notified of slump coming from on site batch pla This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the s~ 01AK Page 1 of 4 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 .97 Report Date 07/20/1998 Business Center II te Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 7:30 am 3rian Otis ,arm ~ONCRETE: 96 V ET NO: N/A liT WEIGHT (pcl): N/A UCUMULATIVE YARDS: 90 COMPRESSIVE STRENGTH (psi) 3020 3000 3010 FRACTURE TYPE ritten approval of HBC Engineering, Inc. CONCRETE COMPR 3SIVE STRENGTH Date of Service: 07/10/1998 ReportNo.: 981770' Client No.: 52617000 Project No.: 43-245~ Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppell Belt Lk Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 Batched on Site SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/10/1998 TIME SAMPLED: 9:10 am BY: WEATHER CONDITIONS: Clear, TEMPERATURE (F) - AIR 88 F ~ TRUCK NO: 1870 TICK AIR CONTENT (%): 4.0 U~ PLACEMENT LOCATION: Paving, parking in front of Building B SAMPLE LOCATION: See attached diagram REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 2 1 6.50* 07/17/1998 7 105180 2 2 6.50* 07/17/1998 7 108670 Average 2 3 6.50* 08/07/1998 28 2 4 6.50* 08/07/1998 28 * Note: See page 1 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the v OlAK Page 2 of 4 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/20/1998 .97 Business Center II ~e Rd. & Lakeshore Dr. Texas 'ed field test and cast BATCH TIME: 9:00 am ~rian Otis 'arm ;ONCRETE: 97 F ;T NO: N/A 'IT WEIGHT (pc0: N/A ~CUMULATIVE YARDS: 200 COMPRESSIVE STRENGTH (psi) 3720 3840 3780 FRACTURE TYPE ritten approval of HBC Engineering, Inc. CONCRETE COMP SIVE STRENGTH TE 'r Date of Service: 07/10/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 981770 43-245; Coppel] Belt Li~ Coppel] Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 Batched on Site SPECIFICATION REQUIREMENTS STRESS;Tm 4000 psi @ 28 Days 5" 3-6% ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See attached diagram CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 3 1 7.50* 07/17/1998 3 2 7.50* 07/17/1998 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/10/1998 TIME SAMPLED: 11:10 am BY: WEATHER CONDITIONS: Clear, TEMPERATURE (F} - AIR 92 g ~ TRUCK NO: 1870 TICK AIR CONTENT (%): 5.0 UP PLACEMENT LOCATION: Paving, parking in front of Building B REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 7 84780 7 83850 Average 3 3 7.50* 08/07/1998 28 3 4 7.50* 08/07/1998 28 Note: See page 1 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the ~ 01AK Page 3 of 4 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 .97 Report Date 07/20/1998 Business Center II te Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 11:00 am ~rian Otis 'arm :ONCRETE: 99 F *~T NO: N/A rr WEiG}rr (0c0: N/A 2CUMULATIVE YARDS: 300 COMPRESSIVE STRENGTH (psi) 3000 2970 2990 FRACTURE TYPE itten approval of HBC Engineering, Inc. CONCRETE COMPRt SIVE STRENGTH TE, ITM Date of Service: 07/10/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 981770' 43-2452 Coppell Belt Lit Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 Batched on Site SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/10/1998 TIME SAMPLED: 12:40 pm BY: WEATHER CONDITIONS: Clear, TEMPERATURE (F) - AIR 92 TRUCK NO: 526 TICKJ AIR CONTENT (%): 5.0 U~ PLACEMENT LOCATION: Paving, parking in front of Building B SAMPLE LOCATION: See attached diagram CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 4 1 7.00' 4 2 7.00' 4 3 7.00* 4 4 7.00* REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 07/17/1998 7 87300 07/17/1998 7 86510 Average 08/07/1998 28 08/07/1998 28 Al * Note: See page 1 Technician: Brian Otis Report Distribution: (I) Lincoln Property Company (I) Butler Construction (1) O'Brien & Associates (I) AECC, Inc. Started: 4:00 am Finished: 2:00 pm H] (1) City ofCoppell/Bldg. Insp. (1) City ofCoppell/Constr. Insp. (1) Mullen & Powell Tcchnistructurcs This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the w~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 ~97 Report Date 07/20/1998 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCHTIME: 12:15 pm ~rian Otis 'arm :ONCRETE: 101 V ,:T NO: N/A rr WEIGHT (pc0: N/A 2CUMULATIVE YARDS: 390 COMPRESSIVE STRENGTH (pzi) 3090 3060 3080 FRACTURE TYPE Eugene Pl~bour Vice President itten approval of HBC Engineering, Inc. 01AK Page 4 of 4