Loading...
Northlake 635(3)-LR 98072407/21/95 FRI 11:39 FAX 21463P~'~70 FAX TRANSMITTAL 214630?0?0 HBC ENGINEERING Total Pages Including Cover: D/$T, lOUTiO~f:mLarryMooe Butler Construction Tom Albrilht Chris M,xwell Lee Stone La-y Davis Dennis Oa,t TIME: FAX NO_ OFFICE: AoM, Ss, Belov 114-744 O'Brieo & AECC, ho. 972-7B~ 972~96 Ci~ of C_~ppol .I~B. Idl. I,nf. gift of Cop__l?.!_l/~Co. otr. I..p. Mulls, &Pow, II T#k.iotruot.ree 97~-J0 214-52. Re_~rt. H_o_(*_): The information contained in this facsimile message is legally privileged end confidential inforr for the use of the individuel or entity named above. If the reader of this message is not the in! the employee or agent responsible to deliver it to the intended recipient, you are hereby notifiE nation, distribution or copying of this communication is strictly prohibited. If you have receive¢ lion in error, please immediately notify us by telephone and return the original message to us, vie the US Postal service. Thank you.____ . ~-3451 17-589-9618 -4821 ~-7680 -~S14 ~-~$70 /tion ir;tended only ffnded recipient, or d that any dissemi- this communica- nt the address below HOUSTON 2313 W, Sam Houston Pkwy, N, Suite # 107 Houston, Texas 77043 Phone: (713) 722~0700 Fax: (713) 722-0788 DALLAS 8901 Carpcnte~ Frwy Suite #100 Dallas, Tex~ 75247 Phone: (214) 630-1010 ~Fax; (214) 630-7070 AUSTIN 3913 Todd Lane Sait~ #312 Austin, Texas 78744 Phone: (512) 442-1122 Fax: (512) 442-1181 ATLANTA 2470 Windy Hill Suite $$300 Marietta, Georgia 30067 Phone: (770) 618-3055 Fax: (770) 615-3015 001 07/24/98 FRI 11:40 FAX 2140307070 HBC ENGINEERING CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 07/14/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln plaza/Lan~Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 981799, Project No.: 43-245: Project: Coppcl Belt Li, Coppel Services: Obtain samples of fresh concrete at the placement locations, perform requ compressive strength samples. CO~CTOm Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECrFICATION REQUIREMgN'TS ~'RE~G'r'm 4000 psi (~ 28 Days SLUM~: 5" AIR: 3-6% T~aT MBTaOD: ASTM C-143 AS~ C-172 SAMPLE I.OCATION: O02 8901 Carpenter lrr~7. S~ite #100 Dallaa, Texas 75~47 Report Date 07/20/1998 .97 Business Con',er II le Rd. & Lakeshore Dr. Texas 'ed field test and cast PROJECT DATA CONCaETE C~: 935 ] PLACEMENT DATE; 07/14/199: BATCHTIME: 5:30 am TIME SAMPLED: 6:05 ~ BY: rack Farris WEA'I~IER CONDITIONS: Partly loudy · rgMPERATLTRE (F) - Am 80 F CONCRETE: 98 ~r Tm0C-~NO: 1883 TiC :ET NO: 728852 AIR CONTENT (%): 4.5 I2 NIT WEIGHT (PC0: NIA PLACEblEIh'F LOCATION: Pavins, patkin~ on east sid~ of Buildin$ A; s~ attached diagram ASTM C-39 From NE comer, 3'W/a'S REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TE~TgD (d,.y-) Obs. force) 5.50 07/21/1998 7 82250 5.50 07/21/1998 7 81500 Average 1 3 5.50 08/11/1998 28 1 4 5.50 08/11/1998 28 This report is exclusively for the use of the olicnt indic, atcd abovc and shall not bc reproduced except in full without th 01AK Pa~e 1 of 6 ~CCUMUI.A'I'tVE YARDS: 40 COMPRESSIVE STRENGTH 1~ua-CTU~E (psi) 2910 2880 29O0 writtct~ ~proval ofHBC Engin~--rin$, Inc. 07/24/98 FRI 11:40 FAX 2146307070 HBC ENGINEERING CONCRETE COMPRESSIVE STRENGTH TEST I Ill III · Date of Service: 07/14/1998 Report No.: 98179~ Client No.: 52617000 Project No.: 43-245 CHent: Lincoh~ Property Company 3300 Lincoln P[aza~Larry Moon 500 North Akaxd Street Dallas TX 75201-3394 Project: Coppel Belt Li Coppel Services: Obtain samples of fresh concrete at the placement locations, perform rcqu compressive strength samples. CO~O, CrOR: Butler Construction CONCRI;TE SUPPLIER: Pioneer Concrete PI.a~T: 16 SVtC,r~C^T~ON REOUI~MEnTS ST~nGTU; 4000 psi (~ 28 Days SLUMP: 5" ^IR: 3-6% TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMEI~T DATF;: 07/14/199: TIMESAMPLF~D: 7:35 am BY: WEATHER CONDITIONS: Partly TEMPERATURE (F)- AIR 82 F TRUCK NO: 853 TIC: Am CONTENT (%): 5.0 tl PLACEMENT LOCATION: Sec I~le I SAMPLE LOCATION: From NW corner, 15 yds S, 3 yds E CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SI, U MP DATE AGE LOAD (lnche~) TESTED (dayn) (lbs. force) 2 1 5.25 07/21/1998 7 75430 2 2 5.25 07/21/1998 7 81250 Average 2 3 5.25 08/11/1.998 28 2 4 5.25 08/11/1998 28 This report iS exclusively for thc use of thc client indicated above m~d sh~ll not bc reproduced except in full without the OIAK Page 2 of 6 4 -97 ~003 8901 Carpenter Fray., ,Suite #109 Dallas, Texas 7~4'~ II Report Date 07/20/1998 Business Center 11 ae Rd. & Lakeshore Dr. 1, Texas Lred field test and ~ast BATCH TIME; 6:47 am 'ack Farris umy CONCRETE: 98 V :ET NO: 728862 NI'F WI:SIGHT (pet): N/A kCCUMULATIVE YAIIDS: 140 COMPRESSIVE STRENGTH (psi) 2670 2870 2770 rfitten approval of I'~C F,n[;ineerin&, Inc. 07/24/98 FRI 11:i0 FAX 2146307070 ltBC ENGINEERING CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 07/14/1998 Report No.: 981799 Client No.: 52617000 Project No.: 43-245: Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppei Belt Li~ Coppe[ Services: Obtain samples of fresh concrete at thc placement locations, perform requ compressive strength samples. ~FR£NG'fH: SLUMP: AIR: 'FF. ST MI~THOD: CO~'RACTOm Butler Construction CONCRETE SUI'PL~R: Pioneer Concrete et,AWn 16 SPECIFICATION REQUIREMENTS 4000 psi (~ 28 Days 5" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCe~TE CIaSa: 9351 PCAC~T OAT[: 07/14/1991 TIME SAMPLED: 9: ] 9 am nv: WEATHER CONDITIONS: Partly TZMPE~ATtrRE (F)- AIR 88 TRUCXNO: 1883 AIR CONTENT (%): 5.0 L PL0kCEMENT LOCATION: $~ p~e i SAMPLE LOCATION: From SEC of paving. S yds W, 2' N REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD S£T NO. (inches) TESTED (daye) (lin. force) 3 1 6.00 07/21/1998 7 83950 3 2 6.00 07~1/1998 7 84980 Average 3 3 6.00 08/11/1998 28 3 4 6.00 08/11/1998 28 01AK This report is ex¢luaively foe b~e use of the ~lien! indicated above an~ shall not bc mprodu~d except in full without th Page $ of 6 004 89Ol Carpeater Frwy, Suitc #10~ Dallas, T~xu 75347 Report Date 07/20/1998 -97 Business Center II ,e Rd. & Lakeshore Dr. Texas 'ed field test and cas~ BATCH TIME: 8:00 am lack Farris ;onny CONCRETI;: 98 v ~T ~O: 728873 NIT WEIGHT (p~f): N/A %CCUMULATWg YARDS: 240 COMPRESSI¥£ 2970 3010 2990 F~URE TYPE written approval of HBC Engineering, Inc. 07/24/95 FRI 11:41 FAX 2146307070 HBC ENGINEERING r CONCRETE COMPRESSIVE STRENGTH TESF I II I I III Date of Service: 07/14/1998 Report No.: 981799 Client No.: 52617000 Project No.: 43-2451 Client: Lincoln PropezW Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Slreet Dallas TX 75201-3394 Project: Coppel Belt Li~ Coppel Services: Obtain samples of fresh concrete at the placement IDeations, perform requ' compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER; Pioneer Concrete eton'r: 16 SPgCIFICATION REQUIREMENTS STRENGTlt: 4000 psi ~ 28 Days 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA co,camm CLASS: 9351 PLACEMENT OATI"-: 07/14/1991 TIME SA~D: ~ ] :30 am BY: WEATHBR CONDITIONS: Su~y TE~~ ~- Am 90 ~ TgUCgnO: 1883 ~c~ Am CO~ (%): 5.5 v P~CE~ LO~ON: Pavln~ p~ ~ ~u~ side of Buildin$ A ~MPL£ LOCATION: From SWC of bldg., 8 yds S, 4'E CYLINDER MARlff~ SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE I,OAD (inches) TgfflT.,D (days) (lbs. for~) 4 1 5.00 07/21/1998 7 56590 4 2 5.00 07/21/1998 7 84910 Average 4 3 5,00 08/11/1998 28 4 4 5.00 08/11/1998 28 This rcpoR is exclusively for thc usc of the client indicated above and shall not bc rcwoduc~d except in full without 0IAK Page 4 of 6 005 8901 Carpenter Frwy., Suite #100 Dallas, Tcxu ¢ !-97 Report Date 07/20/1998 Business Center [I [e Rd. & Lakeshore Dr. Texas 'cd field test and cast I BATcH'rIMg: 10:05 am lack Farris coNc~TE: 95 F XT NO: 728883 ~lX WEIGHT (pcO: N/A CCUMILILATIVE YARDS: 340 COMPRESSIVE STRENGTI-I (psi) 2000 3000 2500 FRACTURE ~riRcn approval of HBC Engineering. Inc. 07/24/98 FRI 11:41 FAX 2146307070 HBC ENGINEERING 'CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 07/14/1998 Ill Report No.: 981799, Client No.: 52617000 Project No.: 43-245: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppel] Belt Lis CoppelJ Services: Obtain sarnp]es of fresh concrete at the placement locations, perform requi compressive strength samples, STRENGTH: SLUMP: Am: TEST METHOD: COnTaAC'rOR: Butler Construction CONCRETE SUPPLIER: PiOB¢¢r Coflcrete eUa~T: 16 S~ZCIWCA~O~ ~ZQ~mZ~TS 4000 psi ~ 28 Days 3-6% AS~ C- la3 ASTM C- ~ 72 ASTM C-39 PROJECT DATA concn~xz CL,~Ss: 935 l PLAC£MENT DAT~; 07/14/199~ TI~S~: l :05 pm ~V: w~n'r~ co~moNs: P~ly TE~E~(~-AIR 100 F 'tarock No: 515 AIR CO~ (%): 5.5 UI PLAC[ME~ LO~TION: P~vin~. pmkln~ on zou~ ~id~ of ~uild~ng A 8AMPLE LOCATION: From NWC of paving, 14 y~L~ E, 4'S REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (|nchea) TESTED (day-.) (lbs. force) 5 ] 5.75 07/21/1998 7 75340 5 2 5.75 07/21/1998 7 83200 Average 5 3 5.75 08/11/1995 28 5 4 5.75 08/11/1998 28 This t~ort is ~¢lusivoly Fur ~he us~ of~c ¢li~l indicamd abovg and shall nut be r~mduc~d cx~p! in 1~11 without 01AK Page 5 of 6 006 8901 Carpcntcr Frwy., Saffe #10~ Dallas, Texas I1 Report Date 07/20/] 998 ,97 Business Center 1I ,e Rd. & Lakcshore Dr. . Texas ed field test and cast BATCH TIME: 12:08 pm rack Fan'is unny :ONCRETg: 98 F gT No: 728894 ~IT WEIGHT (pcO: N/A CCUMULATIVE YARi~: 440 COMPRE.~,~iIVE STRENGTH (psi) 2660 2940 2800 FRACTURE TYPE vHIten ~proval ofllBC Engin~rin$, Inc. 07/Z4/98 FRI 11:41 FAX 2146307070 HBC ENGINEERING -CONCRETE COMPRESSIVE STRENGTH TEST / Date of Service: 07/14/1998 Report No.: 981799 Client No.: 52617000 Project No.: 43-245: Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppel Belt Li: Coppel Services: Obtain samples of fresh concrete at the placement locations, perform requ compressive strength samples. STRENGTH: SLUMP: AIR: TEST METIIOD: COnTgAcroR: Butler Construction CONCRE~FIK SUPPLIER: Pioneer Concrete PLANT: ] 6 SI)ECIFICATION R£QUIREMENTS 4000 psi ~ 28 Days 5" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CO~CRE'r£ CLASS: 9351 PI..AC~ME1NT DATE: 07/14/199: TIMESAMPI~D: 3:15 pm ~v: W~AT~R COND~IONS: Sunny, TE~E~(~-Am 101 F A~ CO~ (%): 5.0 PLACEM~ L~TION: Paving. p~kin~ on ~o~& sid~ of SAMPL£ LOCATION: NWC of paving, 6 yds E, 8 yds $ ~Yt.INDER MKA~UI~D ~ SLUMP DATE -~j~n~-----~, (inches) TF~"fED 6 I 5.25 07/21/1998 6 2 5.25 07/21/1.998 6 3 5.25 08/11/1998 6 4 5.25 08/11/1998 REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 7 99430 7 96060 Average 28 28 007 Carpenter F~y., Suite #I00 Dallal, Tc~ns TS~I7 Repo~ Date 07~0/1998 [-97 Business Center 1I te Rd. & Lakeshore Dr. [, Texas ired field test and cast a~TC~: 2:05 pm :ack Farris lot CONCRETE: 98 g ~T nO: 728906 qFFWEIGHT (P¢O: N/A ~ccu~t~xrv~ v~ms: 550 COMPRESSIVE STRENGTH (psi) 3520 3400 3460 Technician: Jack Farris Report Dbtributiom (1) Ll~colfl Property Company (1) Butler Construction (1) O'Bri~n & Associates (!) AECC. In~, Started: 4:00 am (~) City ot'Coppcll/gldl~, lnsp. (1) City of Copp~ll/Con~t~. lnsp. (t) Mullcn & Powell Tcchni~cturcs Finished: 4:00 pm This report is exclusivety for the usc of thc client indicated above ~nd shah nut b~ reproduced except in full without thc Page 6 of 6 Vico President writton ~pproval of HBC Engineering, Inc. 07/24/98 FRI 11:23 FAX 21461},~'~070 2146307070 IIBC ENGINEERING FAX TRANSMITTAL ~001 DATE: 07/24/98 TO: Se, Belw PROJECT: Co. ppoll B,sine. Center II FROM: Olivia for E.le.e Hifbe. r Total Pages Including Cover: TIME: FAX NO. OFFICE: A.M. Oi~rR/BuTioNL LI_L~ Moon __ Lieeel, Preporll Cempalf 114-74( Butler Construction Tom alkri{ht. O'Brien & Asseeiltea 972-781 Chris Maxwell Lee Stone Lsq Davis De,nO, Grit AEO$, I.e. Ci_tl ef $ofpdl/~ldl. I.sft. City of Cqqmll/Geutr. I.ef. Mille. & P.w.ll Teik.ietrletifee 972-96 972-J0, 9~-{0 214-S2~ ..Re__Port No(s); Tt~e information contained in this facsimil~ message is legally privileged a~c/ confidential inf~ for the use of the individual or entity named above. If the reader of this message is not the int the employee or agent responsible to deliver it to the intended re~pient, you are hereby notifit ,-{451 ;17-s89-9618 ~-4818 )-7680 )-{$14 :-1718 Ination, distribution or copying of this communication is strictly prohibited. If you have receive~ lion in error, please immediately notify us by telephone and return the original message to us via the US Postal service. Thank you, 1alien intended only '"'-~ · .nded recipient, or d that any dies.mi. 'this communica- tor the address below HOUSTON 2313 W. Sam Houston Pkwy. N. Suite #I07 Houston, Texas 77043 Phone: (713) 722.0700 DALLAS 8901 Carpenter Frwy Suite #100 Dallas, Texas 75247 Phone: (214) 630-1010 AUSTIN 3913 Todd Lane Suite #312 Austin, T~xas 757aa Phone: ($12) 442-1122 Fax: (713) 722-0785 Fax: (214)630-7070 Fax: (512)442-1181 ATLANTA 2470 Windy Hill Rd. Suite #300 Marietta, Georgia 30067 Phone: (770) 615-3055 Fax: (770) 618-3015 07/24/98 FRI 11:24 FAX 2146507070 HBC ENGINEERING .CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 07/02/1998 Client No.: 52617000 Client: Lincoln Prope~tyCompany 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 98171 ~ Project No.: 43-245 Project: Coppe! l~elt Li Copp¢' Services: Obtain samples of fresh concrete at thc placement locations, perform req~ compressive strength samples. 6 2-97 ~002 8901 Carpenter Frwy., Suit~ #10~ Dali&s, Texas '/$M't Report Date 07/20/1998 Business Center II ~e Rd. & Lakeshore Dr. , Texas red field test and cast STRENGTH: SLUMP; AIR: ~ METHOD: CONTRACTOR: Butler Construction CONCRETE $UPPLIER: Pioneer Concrete PLANT: ! 6 SI'[~CliqCATION aEOVIREMr-ri'rs 4000 psi ~ 28 Days N/A ASTM C-143 ASTM G. 172 ASTM C-39 SAMPLE LOCATION: 100'E of 3rd dock door CYLINDER MARKgl) - SET NO. PROJECT DATA COr~CR~:TE CLASS: 935 l PI,,*.CEMENT DATE: 07/02/199 TIME SAMPLED: 5:30 8Jll BY': WEATRER CONDITION8: Clear TEMPERATURE (F). AIR 84 F TRUCKNO: 730 TIC AiR CO~TENT (%): N/A PLACEMENT LOCATION: Paving, so~h¢~St cad of site REPORT OF TESTS MEASURED bL'~f~lMU M SLUMP DATE AGE LOAD (inche~) TI[SI'ED (days) (Ib~. force) I i 5.50 07/09/1998 7 110750 I 2 5.50 07/09/1998 7 107860 Average 01AK 1 3 5.50 07/30/1998 28 1 4 5.50 07/30/1998 28 BATCH TIME: 5:05 am Darrin Phillips CO~Ca£TE: 78 F ~TNO: 712714 INIT WEIGHT (pet}: N/A ACCUMUI,A'r~vE YARDS: :30 COMPRESSIVE STRENGTI'I (psi) 3920 3810 3870 This ~po~t is exclusively for thc us,: of thc client indicated above: and shall nO! b~ rcproduoed exoept in futt without t Page ! of .5 TYPE written approval of HBC £nginecring. inc. 07/24/98 FRI 11:24 FAX 2148307070 ItBC ENGINEERING "cONCRETE COMPRESSIVE STRENGTH TEST i I Ilnnln n ........ Date of Service: 07/02/1998 Report No.: 981714~ CHentNo.: 52617000 Project No.: 43~245~ Client: Lincoln Property Company_ :;300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201.3394 Project: Coppell Belt Lit Coppell Services: Obtein samples of fresh concrete at the placement locations, perform requi compressive strength samples. PROJ-ECT DATA CO~a~,CrOR: Butler Construction CO~C~Tr etaS: 9351 CONCegTr. S[]rPI,iER: Pioneer Concrete PLACrMENT DATE: 07/02/1998 PLANT: ] 6 TIME 8.4.MPLED: 6;50 am SPECIFICATION REQUIREMENTS WEATHER colvorrioN$: Sunny, STR£NGTR: 4000 psi ~ 28 Days TEMPERATURE (F). AIR 86 SLUMP: 5" TRUCK nO: 730 TICK AIR: N/A AIR CONTENT (%): N/A UI TEST METHOD: ASTM C- 143 r~ct~r~NT LOCATION: 5c¢ page I ASTM C-172 ASTM C-39 SAMPLE LOCATION: 124'E of ~th dock door REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED S UtIM P DATE AGE LOAD SET NO. (;aches) TESTED (days) (lin. force) 2 1 5.75 07/09/1998 7 117180 2 2 5.75 07/09/i 998 7 i 15870 Average 2 3 5.75 07/30/1998 28 2 4 5.75 07/30/1998 28 Tld~ mpo~ is cxolu~ivety fur thc us~ of thc client indicated above and shall not be reproduccd cxccpt in full without th, 01AK Page 2 ors 003 8901 Carpenter Frwy,, Suite #100 Dallas, Texas ?~47 II Report Date 07/20/1998 -97 Business Center II Rd. & Lakeshore Dr. Texas 'ed field test and cast BATCH TIME; 6:30 am )an'in Phillips :lear :ONCRETE; 83 F ET NO: 712724 I~T WEIGHT (per/: N/A CCUMULATIVE YARDS: 130 COMPRESSIVE STRENGTH (oil) 4140 4100 4120 wrlttcn .pprovul of HBC Eflgineeriflg, Inc. 07/24/98 FRI 11:24 FAX 2140307070 HBC ENGINEERING -CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 07/02/! 998 Report No,: 981714 Client No.: 52617000 Project No.: a3-245: Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppel Belt Li~ Coppel Services: Obtain samples of fresh concrete at the placement locations, perform requ compressive strength samples. STRENGTH: SLUMP: AIR: TEb'T METHOD: CONTRAC'rOR: Butler Construction CONCRETE SUPPLI};R: Pioneer Concrete rCAIVI': 16 SPECIFICATION REOUIREM EN'rS 4000 psi ~ 28 Days N/A ASTM C- i 43 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRBT~ CLASS: 9351 PLAO;MZ~rr DATE: 07/02/199: TIMESAM~LED: 7:50 am WEATHER CONDITIONS: Sunny, TEMPEIL&TURE (1~- Am 8~, F TRUCK NO: 730 TICi AIR CONTENT (%): N/A pLACEMENT LOCATION; Sec page ! SAMPLE LOCATION: 75'E of S~ t'ock door CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUM P DATE ACE LOAD (inches) TESTED (days) (lbs. force) 3 I 5.50 07/09/1998 7 109a20 3 2 5.50 07/09/i 998 7 106550 Average 3 3 5,50 07t3011998 28 3 4 5.50 07/30t!998 28 Th{$ report is exclusively tbr tho use of t~c client indicated above and shall act bc reproduced ex.pt in full without th~ OlAK Page 3 ors OO4 8901 Carpenter Fray., Suite #100 Dallas, Texas 752d7 5 ~.-97 Report Date 07/20/1998 Business Center II ~e Rd. & Lakeshore Dr. Texas 'ed field test and cast BATCH TI~ME: 7:30 am Dan'in Phillips clea~ OnCKI?.TE: 80 F ;ET NO: 712734 NIT WEIGIIT (p~l}: N/A tCCUMULATlVE YARDS: 230 COMPRESSIVE $TR£NGTI4 (pst) 3870 3770 3820 FRACTURE TYPE writmn approval of ltBC F,n$ineering, Inc. 07/24/98 FRI 11:28 FAX 2145307070 tIBC ENGINEERING CONCRETE COMPRF, SSIVE STRENGTH TEST Date of Service: 07/02/1998 Report No.: 98171d Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201.3394 Project No,: 43-245 Project: Coppel Belt Li Coppel Services: Obtain samples of fresh concrete at the placement locations, perform requ compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER; Pioneer Concrete PL4~qT: 16 SPEcIIrlCATION REQI. I[REM EN'I'S 4000 psi ~ 28 Days N/A ASTM C- 143 ASTM C-i 72 ASTM C-39 PRO.TECT DATA cOr~CaETE o,,ss: 9351 et~CtMg~n' nATEs 07/02/199 TIME SAILED: 9:40 ~ BY; wgn~gR COND~ONS: Sunny~ TRUCK NO: 1884 TIC; AIR CO~ENT (%); ~/A P~CEM~ LOCA~ON: SAMPLE LOCATION: I$'E of 7th dock door REPORT OF TESTS CYLINDER MgASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO, (inch.) TESTED (days) 0bs. force) 4 I 5.75 07/09/1998 7 99730 4 2 5.75 07/09/1998 7 92760 Average 4 3 5.75 07/30/1998 28 4 4 535 07/30/1998 28 01AK This report is exclusively for thc use of thc client indicted above and shall not bc rcproduc, ed except in full without t Page 4 ors 6 2-97 005 8901 Carpenter Frwy., Suite #100 Dallas, Texas Report Date 07/20/1998 Business Center I! te Rd, & Lakeshore Dr. I, Texas ired field test and cast BATCH TIME: 9:00 am )arriu Phillips clear CONCRETE; 83 F ClOT NO: 712745 'NIT WEIGHT (pen'. N/A qCCUMULATIVE YARDS: 330 COMPRESSIVE STRENGTH (psi) 3530 3280 3410 FRA~URE written approval of riSC Engin~rln{, Inc. 07/24/98 FRI 11:25 FAX 2146307070 HBC ENGINEERING ;coNCRETE COMPRESSIVE STRENGTH TEST Datc of Service: 07/02/1998 Report No.: 9817146 006 Cerpen~er Frwy., Suite Dallas, Texas 751d7 Client No.: 52617000 Client: Services: STRENGI~: SLUMP: AIR: TEST METROD: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project No.: 43-245 Project: Coppel Belt Li Coppel Obtain samples of fresh concrete at the placement locations, perform requ compressive strength samples. CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete pi.ANT: ~ 6 SPF, CIFICATION REQU ! REMENT~ 4000 psi @ 28 Days N/A ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 10'N of I st island. N to S PROJECT DATA COr, CR~T~. CLASS: 9351 rt~Cl~Mt;~rt' DATE: 07/02/199 TIMESAMPI~O: 11:15 am aY-- WEATHBR CONDITIONS: Sunny: TEMPERATURE (F) - AIR 92 F TRUCK NO: 1884 TICI Air CO~nZ~T (%): N/A PLACEMENT LOCATION: Sec page I REPORT OF TESTS CYLINDER MEASU RED MAXIMIJM MARKED SLUMP DATE AGE LOAD ~ (inches) TESTED {days) (Ib~. force) 5 1 5.75 07/09/1998 7 83140 5 2 5.75 07/09/1998 7 77070 Average 5 3 5.75 07/30/1998 28 5 4 5.75 07/30/1998 28 Started: 3:00 am Finished: 1:30 pm E Technician: Darrin Phillips Report Distribution: (I) LincOln P~opcrty Company (I) Bufle~ ConsUuofion (t) O'8tien & Asso~i~ (1) AECC, Inc. This report is exclusively for thc use of thc olicnt indicated abOVe end shall not be ~eproduced except jn full without th (]) City of CoppclltUldg. I nsp. (I) City ofCoppcll/Constr. Insp. ( I ) Mullcn & Powell 'l'echnistructur~$ Report Date 07/20/1998 !-97 Business Center I1 ~e Rd. & Lakeshore Dr. 1, Texas ired field test and cast BATC~TIME: 10:30 am ~)arrin Phillips :lear CONCRETE: 84 F ce;'r NO: 728756 wrr wE~O'm' (peO: N/A kCCUMULATIVIr. YARDS: 430 COMPRE~IVE STRENGTH FRACIIJRE (psi) TYPE 2940 2730 18~0 ~ Engi~~c. Eugene Harbour Vicc Prosid~nt written approval of HBC Eflgin~crlnll 0tAK Page $ of S