Northlake 635(3)-LR 980723CONCRETE COMPRE oSIVE STRENGTH TES
Date of Service:
Client No.:
Client:
07/15/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9818118
Project No.: 43-2452.
Project: Coppell
Belt Li~
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requil
compressive strength samples.
STRENGTH:
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 07/15/1998
TIME SAMPLED: 6:55 am BY:
WEATHER CONDITIONS: Clear,
TEMPERATURE (F) - AIR 88 F (
TRUCK NO: 1843 TICK
AIR CONTENT (%): 3.7 Ur
PLACEMENT LOCATION:
Paving, parking in front of Building B
SAMPLE LOCATION:
See a~ached diagram
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
1 '- '---i--- 6.50 07/22/1998 7 106700
1 2 6.50 07/22/1998 7 107960
Average
1 3 6.50 08/12/1998 28
I 4 6.50 08/12/1998 28
Note: All trucks slumped by technician; as concrete was being pla¢
added water at their discretion.
01AK
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the
Page I of 3
ENGINF. ERII~, RqC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
¸97
Report Date
07/23/1998
3usiness Center II
i Rd.-& Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 6:30 am
lrian Otis
arm
:ONCRETE: 100 F
~T NO: N/A
!IT WEIGHT (pcf): N/A
:CUMULATIVE YARDS: 90
COMPRESSIVE
STRENGTH
(psi)
3770
3820
3800
FRACTURE
TYPE
,d, finishers
written approval of HBC Engineering, Inc.
4 ONCRETE COMPR _r SIVE STRENGTH
Date of Service: 07/15/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
981811
43-245~
Coppell
Belt L~
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
3-6%
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 07/15/1998
TIME SAMPLED: 8:30 am BY:
WEATHER CONDITIONS: Clear,
TEMPERATURE (F) - AIR 90 F
TRUCK NO: 1854 TICK
AIR CONTENT (%): 3.5 UI~
PLACEMENT LOCATION:
See page 1
SAMPLE LOCATION: See attached diagram
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
2 1 5.25 07/22/1998 7 99690
2 2 5.25 07/22/1998 7 102420
Average
2 3 5.25 08/12/1998 28
2 4 5.25 08/12/1998 28
Note: See page 1
This report is exclusively for tbe use of the client indicated above and shall not be reproduced except in full without the
01AK Page 2 of 3
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/23/1998
.97
Business Center II
[e R~'. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 8:04 am
3tiaA Otis
'arm
?ONCRETE: 96 V
gT NO: N/A
1T WEIGHT (PC0: N/A
?CUMULATIVE YARDS: 190
COMPRESSIVE
STRENGTH
(psi)
3530
3620
3580
FRACTURE
TYPE
'itten approval of HBC Engineering, Inc.
CONCRETE COMPResSIVE STRENGTH
Date of Service:
Client No.:
Client:
Services:
07/15/1998 Report No.: 9818111
52617000 Project No.: 43-2452
Lincoln Property Company
3300 Lincoln Plaza/Larry Mooll
500 North Akard Street
Dallas TX 75201-3394
Project: Coppell
Belt L~
Coppell
Obtain samples of fresh concrete at ~he placement locations, perform requi
compressive strength samples.
STRENGTH:
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENTDATE: 07/15/1998
TIME SAMPLED: 9;55 am BY:
WEATHER CONDITIONS: Clear,
TEMPERATURE (F) - AIR 90 F
TRUCK NO: 1854 TIC~
AIR CONTENT (%): 3.8 UP
PLACEMENT LOCATION:
See page 1
SAMPLE LOCATION: See below
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
3 1 5.75 07/22/1998 7 101160
3 2 5.75 07/22/1998 7 96740
Average
3 3 5.75 08/12/1998 28
3 4 5.75 08/12/1998 28
Sample location: Southernmost approach on Belt Line leading to
Note: See page 1
Technician: Brian Otis
Report Distribution:
(1) Lincoln Property Company
(t) Butler Construction
(1) O'Brien & Associates
(!) AECC, Inc.
Started: 4:00 am Finished: 11:30
(1) City ofCoppell/Bldg. Insp.
(1) City ofCoppell/Constr. Insp.
(I) Mullen & Powell Technistructures
This report is exclusively for tile use of the client indicated above and shall not be reproduced except in full without the
01AK Page 3 of 3
ENGINF_F_RING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/23/1998
-97
Business Center II
~ R~. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 9;09 am
~rian Otis
'arm
.~ONCRETE: 98 F
ET NO: N/A
IIT WEIGHT (pcf): N/A
A ?CUMULATIVE YARDS: 270
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
3580
3420
3500
BuiLding A.
Vice President
;ritten approval of HBC Engineering, Inc.