Northlake 635(3)-LR 980727· CONCRETE COMPRC'SSIVE STRENGTH TE T
Date of Service: 06/26/1998 Report No.: 981662
Client No.: 52617000 Project No,: 43-2451
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppel
Belt Li
Coppel
Services: Obtain samples of fresh concrete at the placement locations, perform requ
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: l 6
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
5" max
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
eLACEMENT DATE: 06/26/199~
TIME SAMPLED: 6:45 am BY:
WEATHER CONDITIONS: Clear,
TEMPERATURE {F)- AIR 81 F
TRUCK NO: 1882 TIC
AIR CONTENT (%): N/A u~
PLACEMENT LOCATION:
Paving, north and east of Building A, 225' sc
to center of north face of bldg. and approacl
SAMPLE LOCATION: 15'W/l 5'S from fire hydrant
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
I 1 5.50 07/03/1998 7 109660
1 2 5.50 07/03/1998 7 104750
Average
1 3 5.50 07/24/1998 28 124100
1 4 5.50 07/24/1998 28 129530
Average
Note: Concrete delayed about one and a half hours.
This report is exclusively lbr the use of the client indicated above m~d shall not be reproduced except in full without the
01AK Page I of 4
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
4 Report Date
07/27/1998
L97
Business Center II
te Rd. & Lakeshore Dr.
Texas
'ed field test and cast
BATCH TIME: N/A
)can Martin
dndy
2ONCRETE: 93 F
ETNO: 712617
liT WEIGHT (pcf): N/A
uth from NE corner of bldg. to north approach
20' west of Belt Line to 50' west of Belt Line
CCUMULATIVE YARDS: 60
COMPRESSIVE
STRENGTH
(psi)
3880
3700
3790
4390
4580
4490
FRACTURE
TYPE
ritten approval of HBC Engineering, Inc.
CONCRETE COMPRr"3SIVE STRENGTH TE ITM
Date of Service: 06/26/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Services:
981662
43-245'.
Coppel
Belt Li~
Coppel
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5" max
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 06/26/199~
TIME SAMPLED: 7:32 am BY:
WEATHER CONDITIONS: Sunny,
TEMPERATURE (F)-AIR 80 F ~
TRUCK NO: 845 TICK
AIR CONTENT (%): N/A u~
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: See below
REPORT OF TESTS A
CYLINDER MEASURED MAXIMUM
MARKED SL[~MP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
2 1 5.50 07/03/1998 7 95740
2 2 5.50 07/03/1998 7 93420
Average
2 3 5.50 07/24/1998 28 119360
2 4 5.50 07/24/1998 28 120290
Average
Sample location: 57'N from fire hydrant and tO'E from W end of pav
This report is exclusively ibc the use of the client indicated above aud shall not be reproduced except in full without the
01AK Page 2 of 4
ENGINEERR~, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
4 Report Date
07/27/1998
~-97
Business Center II
~e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 7:10 am
Dean Martin
~vindy
:ONCRETE: 90 F
~TNO: 712623
liT WE1GHT (pc0: N/A
UCUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
3390
3300
3350
4220
4250
4240
Lng.
120
FRACTURE
TYPE
ritten approval of HBC Engineering, Inc.
.CONCRETE COMPR r SIVE STRENGTH
Date of Service: 06/26/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
981662,
43-245~
Coppell
Belt Lit
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.
PROJECT DATA
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 1 6
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5" max
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: 27'S from NEC of bldg., 30'W/E end
97
ENGINEERII~, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/27/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
CONCRETE CLASS: 9351
PLACEMENT DATE: 06/26/1998
TIME SAMPLED: 9:25 am BY: 1Dean Martin
WEATHER CONDITIONS: Sunny, ~vindy
TEMPERATURE (F)-AIR 86 F (~ONCRETE: 91
TRUC~NO: 8115 TlCmI~TNO: 712633
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page 1
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
3 I 6.50 07/03/1998 7 97950
3 2 6.50 07/03/1998 7 93420
Average
3 3 6.50 07/24/1998 28 117490
3 4 6.50 07/24/1998 28 114320
Average
BATCH TIME: 8:40 am
Note: Water added by others; technician
notified superintendent.
U~
This report is exclusively lbr the usc ol'the client indicated above and shall not be reproduced except in full without the v
IT WEIGHT (pcf): N/A
7CUMULATIVE YARDS: 210
COMPRESSIVE
STRENGTH
(psi)
3460
3300
3380
4150
4040
4100
FRACTURE
TYPE
ritten approval of HBC Engineering, Inc.
01AK Page 3 of 4
.CONCRETE COMPR ' SIVE STRENGTH
Date of Service:
Client No.:
Client:
SLUMP:
AIR:
TEST METHOD:
06/26/1998
526 ! 7000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 981662~
Project No.: 43-2452
Project: Coppell
Belt Lit
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5" max
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: 45'N from NE corner of bldg.
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
4 I 6.00 07/03/1998
4 2 6.00 07/03/1998
4 3 6.00 07/24/1998
4 4 6.00 07/24/1998
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 06/26/1998
TIME SAMPLED: 11:25 am BY:
WEATHER CONDITIONS: Sunny,
TEMPERATURE {F) - AIR 91 F
TRUCK NO: 768 TICK1
AIR CONTENT (%): N/A uN
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 98720
7 95300
Average
28 119040
28 123370
Average
AC
Technician: Dean Martin
Report Distribution:
( I ) Lincoln Property Compauy
(I) Butler Construction
(I) O'Brien & Associates
(I) AECC, Inc.
Started: 3:00 alii Finished: 2:00 pm I-~
(1) City ofColq~ell/Bldg. Insp.
(1) City of Coppell/Constr. Insp.
(1) Mullen & Powcll Techuistmctures
This report is exclusively Ibc tile use of the client indicated above and shall not be reproduced except in full without tile wr
-97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/27/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 10:35 am
)eau Martin
vindy
ONCRETE: 91 F
:T NO: 712642
IT WEIGHT (pcf): N/A
:CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
3490
3370
3430
4210
4360
4290
300
'~ gine~~nc.
.~ En
Eugene Harbour
Vice President
FRACTURE
TYPE
tten approval of HBC Engiueering, Inc.
01AK Page 4 of 4
.CONCRETE COMPRr 3SIVE STRENGTH TE"'Y
Date of Service: 06/29/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
43-245',
Coppel
Belt Li~
Coppel
Services: Obtain samples of £resh concrete at the placement locations, perform requi
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 06/29/1992
TIME SAMPLED: 5:30 am BY:
WEATHER CONDITIONS: Clear, I:
TEMPERATURE (F)-AIR 82 F t
TRUCKNO: 410 TICK
AIR CONTENT (%): 3.6 ur
PLACEMENT LOCATION:
Paving; see attached diagram
SAMPLE LOCATION: Same
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches} TESTED (days) (lbs. force)
1 1 4.50 07/06/1998 7 107670
A
1 2 4.50 07/27/1998 28 130980
I 3 4.50 07/27/1998 28 136940
Average
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the
01AK Page 1 of 4
ENGINF_~, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/29/1998
L97
Business Center II
~e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 5:23 am
)croon EIrod
ght wind
~'ONCRETE: 90 F
ETNO: 712660
liT WEIGHT (pcf}: N/A
2CUMULATIVE YARDS: 60
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
3810
4630
4840
4740
'itten approval of HBC Engineering, Inc.
· CONCRETE COMPRr"SSIVE STRENGTH TE T
Date of Service: 06/29/1998
Client No.: 52617000
Client: Lincoln Property Colnpany
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 981678
Project No.: 43-2451
Project: Coppel
Belt Li~
Coppel
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 06/29/199~
TIME SAMPLED: 7:20 am BY:
hVEATHER CONDITIONS: Cloudy
TEMPERATURE (F)- AIR 83 ~ ,
TRUCK NO: 5 5 1 TICl~
AIR CONTENT (%): 3.5 t~t
PLACEMENT LOCATION:
Paving; see attached diagram
SAMPLE LOCATION: Same
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
2 1 4.50 07/06/1998 7 105670
2 2 4.50 07/27/1998 28 142000
2 3 4.50 07/27/1998 28 140020
Average
This report is exclusively for thc use of the client indicated abovc and shall not be reproduced except in lull without the
01AK Page 2 of 4
ENGINEERRqG, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
4 Report Date
07/29/1998
~,-97
Business Center II
le Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 7:05 am
Damon Elrod
light wind
2ONCRETE: 90 F
ET NO: 712668
liT WEIGHT (pc0: N/A
ECUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
3740
5020
4950
4990
150
FRACTURE
TYPE
ritten approval of HBC Eagineering, Inc.
,CONCRETE COMPRr' ,SIVE STRENGTH
Date of Service:
Client No.:
Client:
06/29/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 981671
Project No.: 43-245
Project: Coppell
Belt Lit
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
3-6%
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 06/29/1998
TIME SAMPLED: 8:35 am BY:
WEATHER CONDITIONS: Partly
TEMPERATURE (F) - AIR 85 F (
TRUO< NO: 512 TICK:
AIR CONTENT (%): 3.7 u~
PLACEMENT LOCATION:
Paving; see attached diagram
SAMPLE LOCATION: Same
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
3 1 5.00 07/06/1998 7 90110
Al
3 2 5.00 07/27/1998 28 101930
3 3 5.00 07/27/1998 28 105790
Average
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without tbe,
01AK Page 3 of 4
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/29/1998
.97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: N/A
)amon Elrod
oudy, light wind
:ONCRETE: 91 F
~TNO: 712680
IT WEIGHT (pc0: N/A
~CUMULATIVE YARDS: 250
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
3190
36O0
3740
3670
itten approval of HBC Engineering, Inc.
· CONCRETE COMPR? SIVE STRENGTH TE?
Date of Service:
Client No.:
Client:
06/29/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 981678,
Project No.: 43-2452
Project: Coppell
Belt Lit
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi:
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: l 6
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi (~ 28 Days
5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Same
CYLINDER MEASU RED
MARKED SLUMP
SET NO. (inches)
4 I 4.50
4.50
4.50
4 2
DATE
TESTED
PROJECT DATA
CONCRETE CLASS: 9351
eLACEMENT DATE: 06/29/1998
TIME SAMPLED: 10:00 am BY:
WEATHER CONDITIONS: Partly
TEMPERATURE (F) - AIR 87 F
TRUCK NO: 410 TICKI
AIR CONTENT (%): 3.7 tIN
PLACEMENT LOCATION:
Paving; see attached diagram
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
07/06/1998 7
07/27/1998 28
07/27/1998 28
90720
123310
121170
Average
Al
Technician: Damon Elrod
Report Distribution:
(I) Lincoln Property Company
(I) Butler Construction
(I) O'Brien & Associates
(I) AECC, Inc.
Started: 3:30 am Finished: I 1:00
( 1 ) City of Coppell/Bldg. lusp.
(1) City ofCoppell/Constr. Insp.
(I) Mulleu & Powcll Technistructures
This report is exclusively lbr the use of the client indicated above and sball not be reproduced except in full without the w~
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
07/29/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 9:34 am
)amon Elrod
oudy, light wind
ONCRETE: 92 F
:TNO: 712687
IT WEIGHT (pcf): N/A
:CUMULATIVE YARDS: 320
COMPRESSIVE
STRENGTH
(psi)
FRACTURE
TYPE
3210
436O
4290
4330
_~ Engin~.~nc.
Eugene Harbour
Vice President
itten approval of HBC Engineering, Inc.
01AK Page 4 of 4
\