Northlake 635(3)-LR 980730CONCRETE COMPRt" SIVE STRENGTH TE["f
Date of Service:
Client No.:
Client:
06/30/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 981692
Project No.: 43-245~
Project: Coppell
Belt Lii
Coppeil
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.
SLUMP:
AlR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5" max.
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 06/30/1998
TIME SAMPLED: 6:39 am BY:
WEATHER CONDITIONS: Sunny,
TEMPERATURE (F) - AIR 85 F
TRUCK NO: 1 854 TICI~
AIR CONTENT (%): N/A ur
PLACEMENT LOCATION:
Slab leaveout, Building A, east wall and Buil
SAMPLE LOCATION: 120' S from NE corner
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
1 1 6.50
1 2 6.50
1 3 6.50
I 4 6.5O
Water was added
without
REPORT OF TESTS
MAXIMUM
DATE
TESTED
07/07/1998
07/07/1998
07/28/1998
07/28/1998
technician's
AGE LOAD
(days) (Ibs.~rce)
7 89960
7 91540
Average
28 120470
28 124160
Average
approval.
A~
Technician: Dean Martin
Report Distribution:
(I) Lincoln Property Company
(I) Butler Construction
(I) O'Brien & Associates
(I) AECC, Inc.
Started: 3:00 am Finished: 8:00 am ~
(1) City of Coppell/Bldg. lusp.
(I) City ofCoppell/Constr, lnsp.
(I) Mullen & Powell Technistructures
This report is exclusively tbr the use of the clieut indicated above and shall not be reproduced except in full without the w
01SS Page I of 1
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/30/1998
.97
Business Center II
te Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 6:20 am
)can Martin
ight wind
.'ONCRETE: 88 F
rTNO: 712696
~lT WEIGHT (pc0: N/A
ding C at southeast comer
2CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
3180
3240
3210
4260
4390
4330
10
FRACTURE
TYPE
Eng__'
Eugenll04~bour
Vice President
'itten approval of HBC Engineering, Inc.
Ju I-~0-98 11:04A Joe K. Mi I ler
TO: Butler Construction
TEXAS SPRINKLER
803 STADIUM DRNE, SUITE 106
ARLINGTON, TX 76011
817-461-0344
FAX 817-461-0624
ATTN: Alex or Kyle
RE: Coppell Busine~__~ Center
FAX #: 589-9618
NO OF
SHEET 3
(IN,C
:L. COVER)
Fire Pump Test
DATE: 7130198
FROM: Erica S. McNutt
~Jex or Kyle -
MESSAGE
A_~__ched are the test report and certified pump curve as resulting from the
test that was performed yesterday at Building C. You will need. this report
your temporary Certificate of Occupancy. I have already faxed a copy of 1
the Fire Marshall, Travis Crump. If you have any questions, please feel ff
contact myself or Terry Button.
Erica
FO(RM&"FAXTRANS .DOC
pump ~
to obtain
his to
se to
· ..]u 1-30-98 11:05A ,Joe K. M-i I let" (.~.[~)~.~.[-u ,z,~. ~-.u..~
' JLtl ~JO ~ U~]: l~,e ~I"/-'4~0-~0~'~
J~1-30-98 11:04A Joe K. Miller
Jul 30 ~8 09~ 1~
PUMP ACCEPTANCE TEST DATA
Rl/e~ to P & P F(A)- (;12.12 & DS 3- 7N
ff~'.l~,~ ~
/
o,U~P
IF
R,tTEO ~EAO.FT. (p&,~ j
LEVEL Ft'
817,)461-0,
524
II)EAFOFL~&NGE
'.7
~ ~A~S$ GOVEA~OA
/75'
~. 6o
o. 60'
~o
0 ~0 20 30 40 SO $0 ?0 80 gO lO0 ilo 120 t30 140 150 t60
P e~'Cl.'ll rated ca~'&Cdy
?c
~,tstar:' ':=':
P.02
p.~
TO:
ATTN:
RE:
I
TEXAS SPRINKLER
803 STADIUM DRIVE, SUITE 106
ARLINGTON, TX 76011
817-461-0344
FAX 817-461-0624
Butler Construction
Alex or Kyle
Coppell Busine~__~_ Center
Fire Pump Test
FAX #: 589-9618
NO OF
SHEET 3
DATE: ~3~98
FROM:
Edca S. McNutt
.~L. COVER)
Alex or Kyle -
MESSAGE
Affeched am the test report and certified pump curve as from
test that was performed yesterday at Building C. You will need this
~our temporary Certificate of Occupancy.. I have already faxed a copy of
the Fire Marshall, Travis Crump. If you have any questions, please feel
contact myself or Terry Button.
Erica
FORMS/FAXTRANS,DOC
to obtain
to
se to
J~j1-30-g8 11:04A Joe K. Miller
Jul 3a si) c)s:l~a
817)461-0
PUMP ACCEPTANCE TEST DATA
Rlle~ to P & P F(A) - <12,12 & OS 3 - ?N
!
624
P.02
80
60,
4O
2O
0 ~n 20 30 40 50 $0 ?0 lO 90 I00 IlO t20 130 ilo ~,$0 t60
f: