Loading...
Northlake 635(3)-LR 980807Date of Service: 07/07/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 981741~ 43-245~ Coppell Belt Lit Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: SAMPLE LOCATION: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 15 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 20'w offcenter entrance, E side PROJECT DATA CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 I 5.50 1 2 5.50 I 3 5.50 1 4 5.50 Technician: Terry L. Smith Report Distribution: (I) Lincoln Property Company (1) Butler Construction (I) O'Brien & Associates (I) AECC, Inc. ¸97 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 08/07/1998 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast CONCRETE CLASS: 9349 PLACEMENT DATE: 07/07/1998 TIME SAMPLED: 7:10 am BY: Terry L. Smith WEATHER CONDITIONS: Hot TEMPERATURE (F)-AIR 80 F ~ONCRETE: 77 TmJCK NO: 1527 TICmI~T NO: 728767 AIR CONTENT (%): N/A PLACEMENT LOCATION: Slab leaveout Building B BATCH TIME: 6:15 am U~ REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 07/14/I 998 7 97400 07/14/1998 7 100810 Average 08/04/1998 28 137560 08/04/1998 28 134110 Average Started: 4:30 am Finished: 11:30 IT WEIGHT (pc0: N/A 2CUMULATIVE YARDS: 20 COMPRESSIVE STRENGTH (psi) 3440 3560 3500 4860 4740 4800 FRACTURE TYPE (I) City of Coppell/Bldg. lnsp. (I) City ofCoppcli/Constr, lnsp. (I) Mullen & Powell Technistructures ] EugL~e Harbour This report is exclusively tbr tile use of the client indicated above and shall not be reproduced except in full without the w Vice President 'itten approval of HBC Engineering, Inc. 01AK Page I of 1