Northlake 635(3)-LR 980807Date of Service: 07/07/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
981741~
43-245~
Coppell
Belt Lit
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.
STRENGTH:
SLUMP:
AIR:
TEST METHOD:
SAMPLE LOCATION:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 15
SPECIFICATION REQUIREMENTS
4000 psi @ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
20'w offcenter entrance, E side
PROJECT DATA
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
1 I 5.50
1 2 5.50
I 3 5.50
1 4 5.50
Technician: Terry L. Smith
Report Distribution:
(I) Lincoln Property Company
(1) Butler Construction
(I) O'Brien & Associates
(I) AECC, Inc.
¸97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
08/07/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
CONCRETE CLASS: 9349
PLACEMENT DATE: 07/07/1998
TIME SAMPLED: 7:10 am BY: Terry L. Smith
WEATHER CONDITIONS: Hot
TEMPERATURE (F)-AIR 80 F ~ONCRETE: 77
TmJCK NO: 1527 TICmI~T NO: 728767
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Slab leaveout Building B
BATCH TIME: 6:15 am
U~
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
07/14/I 998 7 97400
07/14/1998 7 100810
Average
08/04/1998 28 137560
08/04/1998 28 134110
Average
Started: 4:30 am Finished: 11:30
IT WEIGHT (pc0: N/A
2CUMULATIVE YARDS: 20
COMPRESSIVE
STRENGTH
(psi)
3440
3560
3500
4860
4740
4800
FRACTURE
TYPE
(I) City of Coppell/Bldg. lnsp.
(I) City ofCoppcli/Constr, lnsp.
(I) Mullen & Powell Technistructures
] EugL~e Harbour
This report is exclusively tbr tile use of the client indicated above and shall not be reproduced except in full without the w
Vice President
'itten approval of HBC Engineering, Inc.
01AK Page I of 1