Loading...
Northlake WE P10C-LR 970116 FUGRO-McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane: Dallas, Texas 75229 ~.~. o ~ ~'5 . Ph (972) 484-8301; Fax (972) 620-732~ I IN-PLACE DENSITY OF SOIL Project Name ~/o~ ~/~i~ JO ~ Project Number ~J · ~ O~ Density Test Method ASTM D-2922 & 3017 TEX 115-E Method of Compaction ASTM D-698 TEX 113 ASTM 1557 TEX 114 Project Density Requirement ~ o~ Project Moisture Requirement Moisture/Densi~ Relationship Proctor ~ Proctor Results No. Material Description Max. D~ Density (pc~ Optimum Moisture Test Resul~ Gauge No. ~ O Daily Std. Den. ~ ~ ~ j Daily Std. Moist. 50~ Lift ~[~[ ' Does not meet proje~ specifications for percent moisture content. T~nni~.: JASON BBIMINGHAM -- Does not meet project specification for percent compaction. FUGRO-McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301: Fax (972) 620-7328 I IN-PLACE DENSITY OF SOIL I Client '~1' ~ ~'_~*4r ~'-~.~'P Sample Date Project Name ~,~4~ ~*~ /~' ~ Proje~ Number ASTM D-698 TEX 113 Density Test Method ASTM D-2922 & 3017 TEX 115-E Meth~ of Compaction ASTM 1557 TEX 114 Project Density Requirement ~ ~ Project Moisture Requirement MoisturelDensi~ Relationship Pro,or Proctor Results No. Material Description Max. D~ Density (pc~ Optimum Moisture % Test Resul~ J Gauge No. ~O Daily Std. Den. -~ Lift ~ ,'. ~l I Lift J Lift * Does not meet project specifications for percent moisture content. TechT)icia~): JASON BRIMINGHAM ** Does not meet project specification for percent compacJ;on,