Loading...
Northlake 635(3)-LR 980811 CONCRETE COMPI SIVE STRENGTH Date of Service: 07/10/1998 Report No.: 98177(3 Client No.: 52617000 Project No.: 43-2451 Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppel Belt Li: Coppel Services: Obtain samples of fresh concrete at the placement locations, perform requ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 Batched on Site SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07,/ 10/199~ TIME SAMPLED: 7:55 am BY: WEATHER CONDITIONS: Clear, TEMPERATURE (F) - AIR 85 F TRUCK NO: 552 TICI AIR CONTENT (%): 5.3 U1 PLACEMENT LOCATION: Paving, parking in front of Building B SAMPLE LOCATION: See attached diagram REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) I 1 7.00* 07/17/1998 7 85320 ! 2 7.00' 07/17/1998 7 84950 Average 1 3 7.00* 08/07/1998 28 116190 I 4 7.00' 08/07/1998 28 119020 Average * Note: Contractor notified of slump coming from on site batch pla This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the w 01AK Page I of 4 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 7 ~.-97 Report Date 08/11/1998 Business Center II te Rd. & Lakeshore Dr. Texas ed field test and cast : BATCH TIME: 7:30 am Brian Otis ~ONCRETE: 96 F ETNO: N/A ~iT WEIGHT (pcl): N/A CCUMULATIVE YARDS: 90 COMPRESSIVE STRENGTH (psi) 3020 3000 3010 4110 4210 4160 F~CTURE TYPE rittcn approval of HBC Engineering, Inc. CONCRETE COMPRr" SIVE STRENGTH Date of Service: 07/10/1998 Report No.: 981770 Client No.: 52617000 Project No.: 43-245: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppel Belt Li~ Coppel Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE St~eeLIER: Pioneer Concrete PLANT: 16 Batched on Site SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/10/199~ TIME SAMPLED: 9:10 am BY: WEATHER CONDITIONS: Clear, TEMPERATURE (F) - AIR 88 F TRUCKNO: 1870 TICI AIR CONTENT (%): 4.0 ur PLACEMENT LOCATION: Paving, parking in front of Building B SAMPLE LOCATION: See attached diagram CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 2 I 6.50* 07/17/1998 7 105180 2 2 6.50* 07/17/1998 7 108670 Average 2 3 6.50* 08/07/1998 28 132300 2 4 6.50* 08/07/1998 28 134570 Average Note: See page 1 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the' 01AK Page 2 of 4 8901 Carpenter Frwy., Suite gl{N} Dallas, Texas 75247 -97 Report Date 08/11/1998 Business Center II he Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 9:00 am 3rian Otis larm 2ONCRETE: 97 F ET NO: N/A liT WEIGHT (pc0: N/A CCUMULATIVEYARDS: 200 COMPRESSIVE STRENGTH (psi) 3720 3840 3780 4680 4760 4720 FRACTURE TYPE ritten approval of HBC Engineering, Inc. CONCRETE COMPRr'3SI STRENGTH Date of Service: 07/10/1998 Report No.: 98177(] Client No.: 52617000 Project No.: 43-245 Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppel Belt Li] Coppel Services: Obtain samples of fresh concrete at the placement locations, perform reqU compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 Batched on Site SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/10/199 TIME SAMPLED: 11:10 am BY: WEATHER CONDITIONS: Clear, TEMPERATURE (F) - Am 92 g TRUCK NO: 1870 TIC~ AIR CONTENT (%): 5.0 UI PLACEMENT LOCATION: Paving, parking in front of Building B SAMPLE LOCATION: See attached diagram REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 3 I 7.50' 07/17/1998 7 84780 3 2 7.50' 07/17/1998 7 83850 Average 3 3 7.50* 08/07/1998 28 114210 3 4 7.50* 08/07/1998 28 117610 Average * Note: See page 1 This report is exclusively for the use of the client indicated above and shall not be repmduoed except in full without the v 01AK Page 3 of 4 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 7 Report Date 08/11/1998 !-97 Business Center II ~e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 11:00 am Brian Otis ~arm 2ONCRETE: 99 F ET NO: N/A aT WEIGHT (pet): N/A CCUMULATIVE YARDS: 300 COMPRESSIVE STRENGTH (psi) 3000 2970 2990 4040 4160 4100 FRACTURE TYPE ritten approval of HBC Engineering, Inc. -'CONCRETE COMPR SIVE STRENGTH Date of Service: 07/10/1998 Report No.: 981770 Client No.: 52617000 Project No.: 43-245: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppel Belt Li~ Coppel Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 Batched on Site SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/10/1998 TIME SAMPLED: 12:40 pm aY: WEATHER CONDITIONS: Clear, TEMPERATURE (F) - AIR 92 F TRUCK NO: 526 TICI AIR CONTENT (%): 5.0 Ut PLACEMENT LOCATION: Paving, parking in front of Building B SAMPLE LOCATION: See attached diagram CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 4 I 7.00* 4 2 7.00* 4 3 7.00* 4 4 7.00* * Note: See page 1 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs, force) 07/17/1998 7 87300 07/17/1998 7 86510 Average 08/07/1998 28 113090 08/07/1998 28 119010 Average Technician: Brian Otis Report Distribution: (I) Lincoln Property Company ( I ) Butler Construction ( I ) O'Brien & Associates ( 1 ) AECC, Inc. Started: 4:00 am Finished: 2:00 pm ~ ( 1 ) City of Coppell/Bldg. lnsp. (1) City of Coppell/Constr. Insp. (l) Mullen & Powell Technistructures This report is exclusively for thc usc of the client indicated above and shall not be reproduced except in full without thc w ENGINEERIM3, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 7 ~.-97 Report Date 08/11/1998 Business Center II he Rd. & Lakeshore Dr. Texas ed field test and cast BATCHTIME: 12:15 pm 3rian Otis :ONCRETE: 101 F ;T NO: N/A lIT WEIGHT (pc0: N/A 2CUMULATIVE YARDS: 390 COMPRESSIVE STRENGTH (~i) 3090 3060 3080 4000 4210 4110 FRACTURE TYPE '~ gin~ ~ En Eugene l~arbour Vice President 'itten approval of HBC Engineering, Inc. 01AK Page 4 of 4