Northlake 635(3)-LR 980814 ONCRETE COMPRk N. SIVE STRENGTH
Date of Service: 07/30/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
98200,
43-245:
Coppel
Belt Li~
Coppel
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
SLUMP: 5"
AIR: N/A
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 935 1
PLACEMENT DATE: 07/30/1991~
TIME SAMPLED: 4:55 am BY:
WEATHER CONDITIONS: clear
TEMPERATURE (F)-AIR 83 F
TRUCK NO: 551 TICI~
AIR CONTENT (%): N/A tlr
PLACEMENT LOCATION:
Fire lane and parking on west side ofbuildin
305'-380'
SAMPLE LOCATION: 355'N ofS approach/100'W Bldg face
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
1 1 5.25 08/06/1998 7 98270
I 2 5.25 08/06/! 998 7 100220
Average
1 3 5.25 08/27/1998 28
1 4 5.25 08/27/1998 28
A
This report is exclusively tBr the use of the client indicated above and shall not be reproduced except in full without the
01AK Page I of 3
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
08/14/1998
-97
Business Center II
le Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 4:35 am
2ddie Elrod
~ONCRETE: 90 F
~.T NO: 732774
liT WEIGHT (pcf): N/A
D from south approach going north
CUMULATIVE YARDS: 90
COMPRESSIVE
STRENGTH
(psi)
3480
3540
3510
FRACTURE
TYPE
'itten approval of HBC Engineering, Inc.
CONCRETE COMPI*ar' SIVE STRENGTH
Date of Service: 07/30/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
982004
43-245:
Coppel
Belt Li~
Coppel
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTU: 4000 psi ~ 28 Days
SLUMP: 5"
AIR: N/A
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: 405'N ofS approach/110'W Bldg face
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 07/30/199~
TIME SAMPLED: 6:15 am BY:
WEATHER CONDITIONS: clear
TEMPERATURE (F)- AIR 84 F ~
TRUCK NO: 512 TiCK
AIR CONTENT (%): N/A u~
PLACEMENT LOCATION:
See page 1
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
2 I 6.25 08/06/1998 7 92890
2 2 6.25 08/06/1998 7 106950
Average
2 3 6.25 08/27/1998 28
2 4 6.25 08/27/1998 28
OIAK
This report is exclusively fbr tile use of the client indicated above and shall not be reproduced except ill full without the
Page 2 of 3
ENGINEERING, R,,IC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
08/14/1998
Business Center II
~e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 6:00 am
Eddie EIrod
:ONCRETE: 88 F
CT NO: 732783
tiT WEIGHT (pc0: N/A
UCUMULATIVE YARDS: 180
COMPRESSIVE
STRENGTH
(psi)
3280
3780
3530
FRACTURE
TYPE
ritten approval of HBC Engineering, Inc.
CONCRETE COMPRI SIVE STRENGTH
Date of Service: 07/30/1998 Report No.: 982004
STRENGTH:
SLUMP:
AIR:
TEST METHOD:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
43-245~
Coppe[
Belt Lit
Coppel
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 16
SPECIFICATION REQUIREMENTS
4000 psi @ 28 Days
5"
N/A
ASTM C- 143
ASTM C~172
ASTM C-39
SAMPLE LOCATION:
CYLINDER
MARKED
SET NO.
445'N of S approach/130'W Bldg lace
PROJECT DATA
CONCRETE CLASS: 935 1
PLACEMENT DATE: 07/30/1998
TIME SAMPLED: 6:40 am BY:
WEATHER CONDITIONS: clear
TEMPERATURE (F)-AIR 84 F
TRUCK NO: 551 TICI~
AIR CONTENT (%): N/A tlr
PLACEMENT LOCATION:
See page I
MEASURED
SLUMP
(inches)
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
08/14/1998
Business Center II
te Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 6:20 am
2ddie Elrod
2ONCRETE: 89
ET NO: 732788
lIT WEIGHT (pcf): N/A
3 I 6.25
3 2 6.25
3 3 6.25
3 4 6.25
Technician: Eddie Elrod
Report Distribution:
( l ) Lincoln Property Company
( l ) Butler Construction
~ I ) O'Brien & Associates
(I) AECC, Inc.
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
08/06/1998 7 88600
08/06/1998 7 91230
Average
08/27/1998 28
08/27/1998 28
Started: 3:00 am Finished: 9:00 am
(I) City of Coppcll/Bldg. Insp.
( I ) City ofCol~pell/Constr. Insp.
( 1 ) Mullcn & Powell Technistructures
This report is exclusively lbr the use of the client indicated above and shall not be reproduced except in lull without the x~
A
COMPRESSIVE
STRENGTH
(psi)
3130
3230
3180
2CUMULATIVE YARDS: 230
~ Enginee
Eugene Harbour
Vice President
FRACTURE
TYPE
ritten approval of HBC Engineering, Inc.
01AK Page 3 of 3
CONCRETE COMPR SIVE STRENGTH
Date of Service: 07/16/1998
Client No.: 52617000
Report No.: 9818231
Project No.: 43-245; -97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
08/14/1998
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Services:
SLUMP:
AIR:
TEST METHOD:
Coppell
Belt Lit
Coppell
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: E.5 to D.2
MEASURED
SLUMP
(inches)
PROJECT DATA
CONCRETE CLASS:
PLACEMENT DATE:
9349
07/16/1998
TIME SAMPLED: 7:25 am BY:
WEATHER CONDITIONS: Sunny
TEMPERATURE (F) - AIR 82 F
TRUCKNO: 739 TICi
AIR CONTENT (%): N/A up
PLACEMENT LOCATION:
Leaveouts
REPORT OF TESTS
CYLINDER
MARKED
SET NO.
1 1 5.00
1 2 5.00
1 3 5.00
1 4 5.00
Technician: Darrin Phillips
Report Distribution:
(1) Lincoln Property Company
(1) Butler Construction
(l) O'Brien & Associates
(l) AECC, Inc.
Business Center II
.e Rd. & Lakeshore Dr.
Texas
'ed field test and cast
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
07/23/1998 7 106990
07/23/1998 7 102390
Average
08/13/1998 28 124990
08/13/1998 28 125890
Average
Started: 6:00 am
BATCH TIME: 7:06 am
A
Finished: 8:00 am ~
(1) City of Coppell/Bldg. I nsp.
(1) City of Coppell/Constr. Insp.
(!) Mullen & Powell Technistructures
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the ~a
)arrin Phillips
Clear
:ONCRETE: 84 F
;T NO: 112034
lIT WEIGHT (pc0: N/A
UCUMULATIVE YARDS: 30
COMPRESSIVE
STRENGTH
(psi)
3780
3620
3700
4420
4450
4440
Eugene Pd[rbour
Vice President
FRACTURE
TYPE
ritten approval of HBC Engineering, Inc.
01TM Page I of 1
.CONCRETE COMPR SIVE STRENGTH TE?I'
Date of Service: 07/15/1998 Report No.: 981811
Client No.: 52617000 Project No.: 43-245:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppel]
Belt Li~
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 935 l
PLACEMENT DATE: 07/15/1998
TIME SAMPLED: 6;55 am BY:
WEATHER CONDITIONS: Clear,
TEMPERATURE (F) - AIR 88 F
TRUCK NO: 1843 TlCi
AIR CONTENT (%): 3.7 t~
PLACEMENT LOCATION:
Paving, parking in front of Building B
SAMPLE LOCATION: See attached diagram
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
1 I 6.50 07/22/1998
1 2 6.50 07/22/1998
I 3 6.50 08/12/1998
I 4 6.50 08/12/1998
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 106700
7 107960
Average
28 120550
28 125190
Average
Note: All trucks slumped by technician; as concrete was being plac
added water at their discretion.
This report is exclusively tbr the use oftbe client indicated above and shall not be reproduced except in full without the x~
01AK Page I of 3
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
08/14/1998
.97
Business Center II
~e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 6:30 am
3rian Otis
,arm
~'ONCRETE: 100 F
ET NO: N/A
lit WEIGHT (pc0: N/A
CUMULATIVE YARDS: 90
;OMPRESSIVE
STRENGTH
(psi)
3770
3820
3800
4260
4430
4350
d, finishers
FRACTURE
TYPE
ritten approval of HBC Engineering, Inc.
CONCRETE COMPI SIVE STRENGTH TE?I'
Date of Service: 07/15/1998 Report No.: 981811
Client No.: 52617000
Project No.: 43-245
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Services: Obtain samples of fresh concrete at the placement locations, perform requ
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 07/15/1991
TIME SAMPLED: 8:30 am BY:
WEATHER CONDITIONS: Clear,
TEMPERATURE (F)-AIR 90 F
TRUCK NO: 1854
AIR CONTENT (%): 3.5
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: See attached diagram
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
2 1 5.25 07/22/1998 7 99690
2 2 5.25 07/22/1998 7 102420
Average
2 3 5.25 08/12/1998 28 126860
2 4 5.25 08/12/t998 28 131110
Average
Note: See page 1
This report is exclusively fbr the use of thc client indicated above and shall not be reproduced except in full without the
01AK Page 2 of 3
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
8
~--97
Coppel Business Center II
Belt Li ~e Rd. & Lakeshore Dr.
Coppel 1, Texas
red field test and cast
BATCH TIME: 8:04 am
3rian Otis
~arm
2ONCRETE: 96 V
TIC ET NO: N/A
U] ~IIT WEIGHT (pet): N/A
,6 CCUMULATIVE YARDS: 190
COMPRESSIVE
STRENGTH
(psi)
3530
3620
3580
4490
4640
4570
ritten approval of HBC Engineering, Inc.
Report Date
08/14/1998
FRACTURE
TYPE
· CONCRETE COMPRr"sSIVE STRENGTH TE-e"F
Date of Service: 07/15/1998 Report No.: 98181
Client No.: 526! 7000 Project No.: 43-24'
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppel
Belt Li~
Coppel
Services: Obtain samples of fresh concrete at the placelnent locations, perform requ
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: ! 6
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 07/15/199~
TIME SAMPLED: 9:55 am BY:
WEATHER CONDITIONS: Clear,
TEMPERATURE (F) - AIR 90 F
TRUCK NO: 1854 TIC:
AIR CONTENT (%): 3.8 U]
PLACEMENT LOCATION:
See page 1
SAMPLE LOCATION: See below
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
3 1 5.75
3 2 5.75
3 3 5.75
3 4 5.75
Sample location:
Note: See page 1
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
07/22/1998 7 101160
07/22/1998 7 96740
Average
08/12/1998 28 113260
08/12/1998 28 115720
Average
Southernmost approach on Belt Line leading to Bui
Technician: Brian Otis
Report Distribution:
(1) Lincoln Property Company
(l) Butler Construction
(I) O'Brien & Associates
(1) AECC, Inc.
Started: 4:00 am Finished: 11:30 ~
(1) City ofCoppell/Bldg. Insp.
(I) City ofCoppell/Constr. Insp.
(1) Mullen & Powell Technistructures
This report is exclusively for the use of the client indicated above and sball not be reproduced except in full without the v
01AK Page 3 of 3
ENGRqEEPdNG, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
08/14/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
i BATCH TIME: 9:09 am
Brian Otis
larm
2ONCRETE: 98 F
ET NO: N/A
~IIT WEIGHT (pc0: N/A
CCUMULATIVE YARDS: 270
COMPRESSIVE
STRENGTH
(psi)
3580
3420
3500
· 4010
4090
4050
lding A.
FRACTURE
TYPE
C En~c
Eugen~ Harbour
Vice President
'ritten approval of HBC Engineering, Inc.