Loading...
Northlake 635(3)-LR 980818CONCRETE COMPR ' SIVE STRENGTH Date of Service: 07/17/1998 Report No.: 981835' Client No.: 52617000 Project No.: 43-245: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppell Belt Li~ Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/17/199 TIME SAMPLED: 5:55 am BY: WEATHER CONDITIONS: Sunny TEMPERATURE (F)- AIR 82 F TRUCK NO: 858 TICI AIR CONTENT (%): N/A Ur PLACEMENT LOCATION: Paving south end of Building D SAMPLE LOCATION: 44'E/! st dock door, from E/W REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 1 1 5.00 07/24/1998 7 86380 1 2 5.00 07/24/1998 7 87550 Average 1 3 5.00 08/14/1998 28 104740 I 4 5.00 08/14/1998 28 109550 Average This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the 01TM Page 1 of 4 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 -97 Report Date 08/18/1998 Business Center II ~e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 5:43 am 3arrin Phillips clear 7ONCRETE: 88 F ETNO: 728975 liT WEIGHT (peO: N/A ~CUMULATIVE YARDS: 50 COMPRESSIVE STRENGTH (psi) 3050 3100 3080 3700 3870 3790 FRACTURE TYPE ritten approval of HBC Engineering, Inc. CONCRETE COMPR SIVE STRENGTH TE ""Y Date of Service: 07/17/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 981835 43-245~ Coppel] Belt Li~ Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 1 6 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/17/1998 TIME SAMPLED: 7.' 10 am BY: WEATHER CONDITIONS: Sunny TEMPERATURE (F) - AIR 83 F TRUCK NO: 843 TIC} AiR CONTENT (%): N/A Ur PLACEMENT LOCATION: See page 1 SAMPLE LOCATION: 20'9" W/I st island, from E/W CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 2 1 5.75 07/24/1998 7 84810 2 2 5.75 07/24/1998 7 86960 Average 2 3 5.75 08/14/1998 28 120620 2 4 5.75 08/14/1998 28 124750 Average This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without thc 01TM Page 2 of 4 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 .97 Report Date 08/18/1998 Business Center II ,e Rd. & Lakeshore Dr. Texas 'ed field test and cast BATCH TIME: N/A )atria Phillips clear :ONCRETE: 90 F ST NO: 728986 IT WEIGHT (pc0: N/A .~CUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3000 3080 3040 4270 4410 4340 150 FRACTURE TYPE itten approval of HBC Engineering, Inc. CONCRETE COMPR? SIVE STRENGTH TE /TM. Date of Service: 07/17/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 981835~ 43-245~ Coppell Belt Lil Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/17/1998 TIME SAMPLED: 8:15 am BY: WEATHER CONDITIONS: Sunny TEMPERATURE(F)- AIR 88 F TRUCK NO: 843 TICm AIR CONTENT (%): N/A PLACEMENT LOCATION: See page I SAMPLE LOCATION: 15'8" W/3rd island, from E/W REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 3 1 5.00 07/24/1998 7 89560 3 2 5.00 07/24/1998 7 86030 Average 3 3 5.00 08/14/1998 28 118660 3 4 5.00 08/14/1998 28 121000 Average This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the 01TM Page 3 of 4 8901 Carpenter Frwy., Suite gl00 Dallas, Texas 75247 .97 Report Date 08/18/1998 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: N/A )arrin Phillips Clear iONCRETE: 90 F ~T NO: 728975 IT WEIGHT (PCO: N/A Al ;CUMULATIVE YARDS: 230 COMPRESSIVE STRENGTH (psi) 3170 3040 3110 4200 4280 4240 FRACTURE TYPE ittcn approval of HBC Engineering, Inc. .CONCRETE COMPI SIVE STRENGTH TE? Date of Service: 07/17/1998 Report No.: 981835! Client No.: 52617000 Project No.: 43-245~ Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moou 500 North Akard Street Dallas TX 75201-3394 Coppell Belt Lit Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRV_~GTH: 4000 psi ~ 28 Days 5** N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/17/1998 TIME SAMPLED: 9:20 am BY: WEATHER CONDITIONS: Sunny TEMPERATURE (F)-AIR 88 F TRUCK NO: 803 TICK AIR CONTENT (%): N/A PLACEMENT LOCATION: See page I SAMPLE LOCATION: 5'W/5th island, island runs E/W CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 4 I 5.75 4 2 5.75 4 3 5.75 4 4 5.75 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 07/24/1998 7 90840 07/24/1998 7 87240 Average 08/14/1998 28 110980 08/14/1998 28 114710 Average A~ Technician: Darrin Phillips Report Distribution: (I) Lincoln Property Company (!) Butler Construction (I) O'Brien & Associates (i) AECC, Inc. Started: 3:30 am Finished: 11:30 (1) City ofCoppell/Bldg. Insp. ( 1 ) City of Coppell/Constr. I nsp. (1) Mullen & Powell Technistructures This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the w 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 ,97 Report Date 08/18/1998 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 9:04 am )arrin Phillips clear :ONCRETE: 91 F ~T NO: 729004 IT WEIGHT (pc0: N/A ~CUMULATIVE YARDS: 320 COMPRESSIVE STRENGTH (psi) 3210 3080 3150 3920 4060 3990 FRACTURE TYPE '~ gin~nc .~ gn . Eugene l~trbour Vice President ~tten approval of HBC Engineering, Inc. 01TM Page 4 of 4 REPORT OF STRUC JRAL STEEL INSPEC'I iON Date of Service: 08/03/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/L~ Moon 500 North Akard Street Dallas TX 75201-3394 Services: Structural steel inspection. Report No.: 982030 Project No.: 43-245: Project: Coppel Belt Lil Coppel] On this date, an HBC Engineering representative arrived at the above jobsite as scheduled for structural steel inspection on roof deck a~ Building D. As directed by Mr. Chris Butler with Butler Constructi¢ inspections were performed on roof deck attachment conditions throu(· D. The only specification available indicated Hilti pins on 6-inch it was noted that deck was puddle welded on 12-inch centers instead. stated that there was a change order issued. Therefore, the inspectJ Observations were as follows: 2o Welds were on 12-inch centers. However, according to Mr. G~ with Mullin & Powell Technistructures they should be on 6-ir centers at all supports including perimeters. Butt splices in deck support angles (including expansion joJ have not been welded at vertical legs as required. Locations where welds were missing or otherwise non-conformJ were marked with orange paint. Side lap screws marked during a previous trip have not yet corrected. Technician: Ray Waldrop Report Distribution: (I) Lincoln Property Company (I) Buffer Construction (1) O'Brien & Associates (I) AECC, Inc. (I) City of Coppell/Bldg lnsp. (1) City of Coppell/Constr. Insp. (I) Mullen & Powell Tecimistructures This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wr 8901 Carpenter Frwy., Suite #100 Dallas, Te:r~ 75247 -97 Report Date 08/18/1998 Business Center II le Rd. & Lakeshore Dr. Texas referenced 5achment, ,n, visual hout Building centers and Mr. Butler .on proceeded. .nt .ch nts) ng ,een En , Inc. D. Smith, P.E. Project Engineer tten approval of HBC Engineering, inc. 99SS Pa~e 1 of I