Loading...
Northlake 635(3)-LR 980820.CONCRETE COMP SIVE STRENGTH Date of Service: 07/21/1998 Report No.: 981866 Client No.: 52617000 Project No.: 43-245: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppeil Belt Lil Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: i 6 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 3-6% ASTM C~ 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/21 / 1998 TIME SAMPLED: 12:00 pm BY: WEATHER CONDITIONS: Clear, h TEMPERATURE (F) - AIR 98 TRUCK NO: 857 TICK AIR CONTENT (%): 5.1 PLACEMENT LOCATION: Paving, Building D - southwest comer ofbui SAMPLE LOCATION: 70'E/12'S CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 1 1 6.50 07/28/1998 7 103250 1 2 6.50 07/28/1998 7 106550 Average I 3 6.50 08/18/1998 28 140880 1 4 6.50 08/18/1998 28 144780 Average A This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the; 01AK Page I of 2 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 -97 Report Date 08/20/1998 Business Center II te Rd. & Lakeshore Dr. Texas 'ed field test and cast BATCH TIME: 11:10 am (eith Fowler ot ;ONCRETE: 97 F ST NO: 729064 liT WEIGHT (pcl): N/A ding 2CUMULATIVE YARDS: 80 COMPRESSIVE STRENGTH (~i) 3650 3770 3710 4980 5120 5050 FRACTURE TYPE ritten approval of HBC Engineering, Inc. .CONCRETE COMPW" SIVE STRENGTH Date of Service: 07/21/1998 ReportNo.: 981866 Client No.: 52617000 Project No.: 43-245~ Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppell Belt Lit Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 3-5" 3-6% ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/21/1998 TIME SAMPLED: 1:30 pm BY: WEATHER CONDITIONS: Partly TEMPERATURE (F) - AIR 103 F TRUCK NO: 857 TICK AIR CONTENT (%): 5.0 PLACEMENT LOCATION: Paving, Building B - southeast approach SAMPLE LOCATION: South end of southeast approach CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 2 1 5.50 07/28/1998 2 2 5.50 07/28/1998 2 3 5.50 08/18/1998 2 4 5.50 08/18/1998 REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 7 92690 7 88820 Average 28 125100 28 129440 Average Technician: Keith Fowler Report Distribution: (1) Lincoln Property Company (I) Butler Construction (1) O'Brien & Associates (1) AECC, inc. Started: 8:00 am Finished: 2:00 pm ~ (I) City ofCoppell/Bldg. Insp. (1) City ofCoppell/Constr, lnsp. (I) Mullen & Powell Technistructures This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 -97 Report Date 08/20/1998 Business Center II ~e Rd. & Lakeshore Dr. Texas 'ed field test and cast BATCHTIME: 11:55 am ~eith Fowler .oudy, hot :ONCRETE: 98 F ST NO: 729068 IT WEI(;~rr (PC0: N/A 2CUMULATIVE YARDS: 120 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 3280 3140 3210 4420 4580 4500 ~ Engine Eugene Harbour Vice President w itten approval of HBC Engineering, Inc. 01AK Page 2 of 2