Loading...
Northlake 635(3)-LR 980831CONCRETE COMPRr' SIVE STRENGTH Date of Service: 08/12/1998 Report No.: 982123~ Client No.: 52617000 Project No.: 43-2452 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell Belt Li~ Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi~ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 08/12/1998 TIME SAMPLED: 12:10 pm BY: WEATHER CONDITIONS: cloudy TEMPERATURE (F) - Am 94 F TRUCK NO: 656 TICI4 AIR CONTENT (%): N/A UN PLACEMENT LOCATION: Paving behind building to the west SAMPLE LOCATION: See below REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 1 1 5.00 08/19/1998 7 119750 1 2 5.00 08/19/1998 7 119120 Average 1 3 5.00 09/09/1998 28 1 4 5.00 09/09/1998 28 A( Sample Location: 10' east from first fire hydrant at Lakeshore. Technician: Greg Dimock Report Distribution: (I) Lincoln Property Company (i) Butler Construction (I) O'Bricn & Associates (I) AECC, Inc. Started: 11:00 Finished: l:00pm (1) City ofCoppell/BIdg. Insp. (1) City of Coppell/Constr. Insp. (1) Mullen & Powell Technistructures .97 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 08/31/1998 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 11:50 am }reg Dimock ONCRETE: 93 F ;T NO: 732897 IT WEIGHT (pc0: N/A :CUMULATIVE YARDS: 240 COMPRESSIVE STRENGTH (psi) 4230 4210 4220 FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wt Vice President ,tten approval of HBC Engineering, Inc. 01TM Page I of I · I ONCRETE COMPI ' SIVE STRENGTH TE? Date of Service: 07/30/1998 Report No.: 982004 Client No.: 52617000 Project No.: 43-245: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppel Belt Li~ Coppel Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/30/199~ TIME SAMPLED: 4:55 am BY: WEATHER CONDITIONS: clear TEMPERATURE (F) - AIR 83 F TRUCK NO: 551 TiC} AIR CONTENT (%): N/A ut PLACEMENT LOCATION: Fire lane and parking on west side of buildin 305'-380' SAMPLE LOCATION: 355'N ofS approach/100'W Bidg face REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 1 I 5.25 08/06/1998 7 98270 1 2 5.25 08/06/1998 7 100220 Average ! 3 5.25 08/27/1998 28 125510 ! 4 5.25 08/27/1998 28 128010 Average This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the v 01AK Page 1 of 3 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 -97 Report Date 08/31/1998 Business Center II te Rd. & Lakeshore Dr. Texas ~d field test and cast BATCH TIME: 4:35 am Sddie Elrod 2ONCRETE: 90 ET NO: 732774 liT WEIGHT (pcl): N/A D from south approach going north 'CUMULATIVE YARDS: 90 COMPRESSIVE STRENGTH (psi) 3480 3540 3510 4440 4530 4490 FRACTURE TYPE ritten approval of HBC Enginee~ -CONCRETE COMPR SIVE STRENGTH TE? Date of Service: 07/30/1998 Report No.: 982004 Client No.: 52617000 Project No.: 43-245: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppel Belt Li~ Coppel ServiCes: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/30/199~ TIME SAMPLED: 6:15 am BY: WEATHER CONDITIONS: clear TEMPERATURE (F) - AIR 84 F TRUCK NO: 512 TICK AIR CONTENT (%): N/A PLACEMENT LOCATION: See page I SAMPLE LOCATION: 405'N ofS approach/110'W Bldg face REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 2 I 6.25 08/06/1998 7 92890 2 2 6.25 08/06/1998 7 106950 Average 2 3 6.25 08/27/1998 28 109620 2 4 6.25 08/27/1998 28 117010 Average This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the v 01AK Page 2 of 3 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 -97 Report Date 08/31/1998 Business Center II te Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 6:00 am Eddie Elrod ?ONCRETE: 88 F ET NO: 732783 tiT WEIGHT (pc0: N/A UCUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3280 3780 3530 3880 4140 4010 180 FRACTURE TYPE ritten approval of HBC Engineering, Inc. CONCRETE COMPILe' ,SIVE STRENGTH TE? Date of Service: 07/30/1998 Report No.: 982004 Client No.: 52617000 Project No.: 43-245; Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppel] Belt Li~ Coppel; Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTB: 4000 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/30/1998 TIME SAMPLED: 6:40 am BY: WEATHER CONDITIONS: clear TEMPERATURE (F) - AIR 84 F TRUCK NO: 5 51 TlCi~ AIR CONTENT (%): N/A ur PLACEMENT LOCATION: See page 1 SAMPLE LOCATION: 445'N ofS approach/130'W BIdg face CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 3 1 6.25 08/06/1998 3 2 6.25 08/06/1998 3 3 6.25 08/27/1998 3 4 6.25 08/27/1998 REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 7 88600 7 91230 Average 28 117800 28 120160 Average 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 08/31/1998 .97 Business Center II te Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 6:20 am Sddie Elrod ?ONCRETE: 89 ST NO: 732788 liT WEIGHT (pc0: N/A ~CUMULATIVE YARDS: 230 COMPRESSIVE STRENGTH (psi) 3130 3230 3180 4170 4250 4210 FRACTURE TYPE Technician: Eddie Elrod Report Distribution: (1) Lincoln Property Company (1) Butler Construction (1) O'Bricn & Associates (1) AECC, Inc. Started: 3:00 am Finished: 9:00 am (1) City of Coppell/Bldg. Insp. (1) City of Coppell/Constr. lnsp. (1) Mullen & Powcll Tcchnistructures This report is exclusively tbr thc usc of thc client indicated abovc and shall not bc reprodu~d ex.pt in full without thc w Vice President ritten approval of HBC Engineering, Inc. 01AK Page 3 of 3