Northlake 635(3)-LR 980831CONCRETE COMPRr' SIVE STRENGTH
Date of Service: 08/12/1998
Report No.: 982123~
Client No.: 52617000
Project No.: 43-2452
Client:
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project: Coppell
Belt Li~
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 08/12/1998
TIME SAMPLED: 12:10 pm BY:
WEATHER CONDITIONS: cloudy
TEMPERATURE (F) - Am 94 F
TRUCK NO: 656 TICI4
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
Paving behind building to the west
SAMPLE LOCATION: See below
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
1 1 5.00 08/19/1998 7 119750
1 2 5.00 08/19/1998 7 119120
Average
1 3 5.00 09/09/1998 28
1 4 5.00 09/09/1998 28
A(
Sample Location: 10' east from first fire hydrant at Lakeshore.
Technician: Greg Dimock
Report Distribution:
(I) Lincoln Property Company
(i) Butler Construction
(I) O'Bricn & Associates
(I) AECC, Inc.
Started: 11:00 Finished: l:00pm
(1) City ofCoppell/BIdg. Insp.
(1) City of Coppell/Constr. Insp.
(1) Mullen & Powell Technistructures
.97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
08/31/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 11:50 am
}reg Dimock
ONCRETE: 93 F
;T NO: 732897
IT WEIGHT (pc0: N/A
:CUMULATIVE YARDS: 240
COMPRESSIVE
STRENGTH
(psi)
4230
4210
4220
FRACTURE
TYPE
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wt
Vice President
,tten approval of HBC Engineering, Inc.
01TM Page I of I
· I ONCRETE COMPI ' SIVE STRENGTH TE?
Date of Service: 07/30/1998 Report No.: 982004
Client No.: 52617000
Project No.: 43-245:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppel
Belt Li~
Coppel
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 07/30/199~
TIME SAMPLED: 4:55 am BY:
WEATHER CONDITIONS: clear
TEMPERATURE (F) - AIR 83 F
TRUCK NO: 551 TiC}
AIR CONTENT (%): N/A ut
PLACEMENT LOCATION:
Fire lane and parking on west side of buildin
305'-380'
SAMPLE LOCATION: 355'N ofS approach/100'W Bidg face
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
1 I 5.25 08/06/1998 7 98270
1 2 5.25 08/06/1998 7 100220
Average
! 3 5.25 08/27/1998 28 125510
! 4 5.25 08/27/1998 28 128010
Average
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the v
01AK Page 1 of 3
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
08/31/1998
Business Center II
te Rd. & Lakeshore Dr.
Texas
~d field test and cast
BATCH TIME: 4:35 am
Sddie Elrod
2ONCRETE: 90
ET NO: 732774
liT WEIGHT (pcl): N/A
D from south approach going north
'CUMULATIVE YARDS: 90
COMPRESSIVE
STRENGTH
(psi)
3480
3540
3510
4440
4530
4490
FRACTURE
TYPE
ritten approval of HBC Enginee~
-CONCRETE COMPR SIVE STRENGTH TE?
Date of Service: 07/30/1998 Report No.: 982004
Client No.: 52617000
Project No.: 43-245:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppel
Belt Li~
Coppel
ServiCes: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 07/30/199~
TIME SAMPLED: 6:15 am BY:
WEATHER CONDITIONS: clear
TEMPERATURE (F) - AIR 84 F
TRUCK NO: 512 TICK
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: 405'N ofS approach/110'W Bldg face
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
2 I 6.25 08/06/1998 7 92890
2 2 6.25 08/06/1998 7 106950
Average
2 3 6.25 08/27/1998 28 109620
2 4 6.25 08/27/1998 28 117010
Average
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the v
01AK Page 2 of 3
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
08/31/1998
Business Center II
te Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 6:00 am
Eddie Elrod
?ONCRETE: 88 F
ET NO: 732783
tiT WEIGHT (pc0: N/A
UCUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
3280
3780
3530
3880
4140
4010
180
FRACTURE
TYPE
ritten approval of HBC Engineering, Inc.
CONCRETE COMPILe' ,SIVE STRENGTH TE?
Date of Service: 07/30/1998 Report No.: 982004
Client No.: 52617000 Project No.: 43-245;
Client:
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project: Coppel]
Belt Li~
Coppel;
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTB: 4000 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C-172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 07/30/1998
TIME SAMPLED: 6:40 am BY:
WEATHER CONDITIONS: clear
TEMPERATURE (F) - AIR 84 F
TRUCK NO: 5 51 TlCi~
AIR CONTENT (%): N/A ur
PLACEMENT LOCATION:
See page 1
SAMPLE LOCATION: 445'N ofS approach/130'W BIdg face
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
3 1 6.25 08/06/1998
3 2 6.25 08/06/1998
3 3 6.25 08/27/1998
3 4 6.25 08/27/1998
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 88600
7 91230
Average
28 117800
28 120160
Average
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
08/31/1998
.97
Business Center II
te Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 6:20 am
Sddie Elrod
?ONCRETE: 89
ST NO: 732788
liT WEIGHT (pc0: N/A
~CUMULATIVE YARDS: 230
COMPRESSIVE
STRENGTH
(psi)
3130
3230
3180
4170
4250
4210
FRACTURE
TYPE
Technician: Eddie Elrod
Report Distribution:
(1) Lincoln Property Company
(1) Butler Construction
(1) O'Bricn & Associates
(1) AECC, Inc.
Started: 3:00 am Finished: 9:00 am
(1) City of Coppell/Bldg. Insp.
(1) City of Coppell/Constr. lnsp.
(1) Mullen & Powcll Tcchnistructures
This report is exclusively tbr thc usc of thc client indicated abovc and shall not bc reprodu~d ex.pt in full without thc w
Vice President
ritten approval of HBC Engineering, Inc.
01AK Page 3 of 3