Loading...
Northlake 635(3)-LR 980902-CONCRETE COMPIL SIVE Date of Service: 08/03/1998 Client No.: 52617000 Client: Services: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 STRENGTH TE? Report No.: 982032, Project No.: 43-2452 Project: Coppell Belt Lit Coppell Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days SLUMP: 5" AIR: N/A TEST METHOD: ' ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 160' N and 8' W/see diagram CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 08/03/1998 TIME SAMPLED: 8:49 am BY: WEATHER CONDITIONS: clear TEMPERATURE (F) - AIR 92 F TRUCK NO: 518 TICK AIR CONTENT (%): N/A PLACEMENT LOCATION: Paving of driveway on west side of property. 1 1 6.75 08/10/1998 1 2 6.75 08/10/1998 1 3 6.75 08/31/1998 1 4 6.75 08/31/1998 REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 7 90190 7 90120 Average 28 115910 28 116720 Average A~ Technician: Danny Neu Report Distribution: (1) Lincoln Property Company (1) Butler Construction (1) O'Brien & Associates (1) AECC, Inc. Started: 8:00 am Finished: 10:30 (1) City of Coppell/Bldg. Insp. (I) City of Coppell/Constr. Insp. (I) Mullen & Powell Technistructures This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the w 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 09/02/1998 .97 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 8:34 am )anny Neu hot )NCRETE: 93 F :.X NO: 732828 IT WEIGHT (pc0: N/A See attached diagram. ~CUMULATIVE YARDS: 220 COMPRESSIVE STRENGTH (psi) 3190 3190 3190 4100 4130 4120 FRACTURE TYPE -~ En~ Inc. Eugene Harbour Vice President itten approval of HBC Engineering, Inc. 01AK Page 1 of I