Northlake 635(3)-LR 980902-CONCRETE COMPIL SIVE
Date of Service: 08/03/1998
Client No.: 52617000
Client:
Services:
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
STRENGTH TE?
Report No.: 982032,
Project No.: 43-2452
Project:
Coppell
Belt Lit
Coppell
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
SLUMP: 5"
AIR: N/A
TEST METHOD: ' ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: 160' N and 8' W/see diagram
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 08/03/1998
TIME SAMPLED: 8:49 am BY:
WEATHER CONDITIONS: clear
TEMPERATURE (F) - AIR 92 F
TRUCK NO: 518 TICK
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Paving of driveway on west side of property.
1 1 6.75 08/10/1998
1 2 6.75 08/10/1998
1 3 6.75 08/31/1998
1 4 6.75 08/31/1998
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 90190
7 90120
Average
28 115910
28 116720
Average
A~
Technician: Danny Neu
Report Distribution:
(1) Lincoln Property Company
(1) Butler Construction
(1) O'Brien & Associates
(1) AECC, Inc.
Started: 8:00 am Finished: 10:30
(1) City of Coppell/Bldg. Insp.
(I) City of Coppell/Constr. Insp.
(I) Mullen & Powell Technistructures
This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the w
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
09/02/1998
.97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 8:34 am
)anny Neu
hot
)NCRETE: 93 F
:.X NO: 732828
IT WEIGHT (pc0: N/A
See attached diagram.
~CUMULATIVE YARDS: 220
COMPRESSIVE
STRENGTH
(psi)
3190
3190
3190
4100
4130
4120
FRACTURE
TYPE
-~ En~ Inc.
Eugene Harbour
Vice President
itten approval of HBC Engineering, Inc.
01AK Page 1 of I