Loading...
Northlake 635(3)-LR 980904CONCRETE COMPRr' SIVE STRENGTH Date of Service: 08/04/1998 Report No.: 982045: Client No.: 52617000 Project No.: 43-2452 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell Belt Lit Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi: compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 16 SPECWICATION REQUIREMENTS S~ENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 08/04/1998 TIME SAMPLED: 6:36 am BY: WEATHER CONDITIONS: clear TEMPERATURE (F) - AIR 81 TRUCK NO: 802 TICKI AIR CONTENT (%): N/A PLACEMENT LOCATION: Northwest building, paving: See attached dig border SAMPLE LOCATION: NW building 120'S and 3'W CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 5.50 ! 2 5.50 I 3 5.50 I 4 5.50 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 08/11/1998 7 116110 08/11/1998 7 113480 Average 09/01/1998 28 126010 09/01/1998 28 127980 Average Technician: Danny Neu Report Distribution: (1) Lincoln Property Company (i) Butler Construction (I) O'Brien & Associates (i) AECC, Inc. Started: 5:30 am Finished: 10:00 I'~ (1) City of Coppell/Bldg. Insp. (1) City ofCoppell/Constr. Insp. (1) Mullen & Powell Tecbnistructures This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the w~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 -97 Report Date 09/04/1998 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 6:10 am )anny Neu warln )NCRETE: 89 F ;T NO: 732836 IT WEIGHT (pc0: N/A ram. West border (perimeter) and north CUMULATIVE YARDS: 20 COMPRESSIVE STRENGTH (p~i) 4110 40!0 4060 4460 4530 4500 .~ Engine. Eugene YIarbour Vice President itten approval of HBC Engineering, Inc. 01AK Page 1 of I