Loading...
Northlake 635(3)-LR 980910CONCRETE COMPRx SIVE STRENGTH Date of Service: 08/12/1998 Report No.: 982123.~ Client No.: 52617000 Project No.: 43-2452 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell Belt Lin Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 08/12/1998 TIME SAMPLED: 12:10 pm er: C WEATHER CONDITIONS: cloudy TEMPERATURE CF) - AIR 94 F C TRUCK NO: 656 TICKE AIR CONTENT (%): N/A UN] PLACEMENT LOCATION: Paving behind building to the west SAMPLE LOCATION: See below CYLINDER MARKED SET NO. MEASURED SLUMP DATE (inches) TESTED 1 1 5.00 08/19/1998 1 2 5.00 08/19/1998 1 3 5.00 09/09/1998 1 4 5.00 09/09/1998 REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) Sample Location: 10' east from first fire hydrant at 7 119750 7 119120 Average 28 133300 28 135460 Average Lakeshore. A( T~chnician: Greg Dimock Report Distribution: (1) Lincoln Property Company (I) Butler Cons~xucfion Started: 11:00 (1) City of Coppell/BIdg. Insp. ( 1 ) City of Coppell/Constr. Insp. Finished: 1:00 pm 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 09/10/1998 .97 Business Center II : Rd. & Lakeshore Dr. Texas ed field test and cast 8ATCHTIME: 11:50 am ,reg Dimoek 3NCRETE: 93 F rno: 732897 ? WWlGItT (Pc0: N/A ICUMULATIVE YARDS: 240 COMPRESSIVE STRENGTH FRACTURE (psi) T~PE 4230 4210 4220 4710 4790 4750 I--l~N ] :~ugC~i~ Harbour (I) O'Brien & Associates (I) Mullen & Powell Technistmctures [Vice President (I) AECC, Inc. / This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri~en approval of HBC Engineering, Inc. 01TM Page 1 of !