Northlake 635(3)-LR 980910CONCRETE COMPRx SIVE STRENGTH
Date of Service: 08/12/1998
Report No.: 982123.~
Client No.: 52617000 Project No.: 43-2452
Client:
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project: Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requir
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 08/12/1998
TIME SAMPLED: 12:10 pm er: C
WEATHER CONDITIONS: cloudy
TEMPERATURE CF) - AIR 94 F C
TRUCK NO: 656 TICKE
AIR CONTENT (%): N/A UN]
PLACEMENT LOCATION:
Paving behind building to the west
SAMPLE LOCATION: See below
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP DATE
(inches) TESTED
1 1 5.00 08/19/1998
1 2 5.00 08/19/1998
1 3 5.00 09/09/1998
1 4 5.00 09/09/1998
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
Sample Location: 10' east from first fire hydrant at
7 119750
7 119120
Average
28 133300
28 135460
Average
Lakeshore.
A(
T~chnician: Greg Dimock
Report Distribution:
(1) Lincoln Property Company
(I) Butler Cons~xucfion
Started: 11:00
(1) City of Coppell/BIdg. Insp.
( 1 ) City of Coppell/Constr. Insp.
Finished: 1:00 pm
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
09/10/1998
.97
Business Center II
: Rd. & Lakeshore Dr.
Texas
ed field test and cast
8ATCHTIME: 11:50 am
,reg Dimoek
3NCRETE: 93 F
rno: 732897
? WWlGItT (Pc0: N/A
ICUMULATIVE YARDS: 240
COMPRESSIVE
STRENGTH FRACTURE
(psi) T~PE
4230
4210
4220
4710
4790
4750
I--l~N
] :~ugC~i~ Harbour
(I) O'Brien & Associates (I) Mullen & Powell Technistmctures [Vice President
(I) AECC, Inc.
/
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri~en approval of HBC Engineering, Inc.
01TM Page 1 of !