Northlake 635(3)-LR 981023CONCRETE COMPRI ,SIVE STRENGTH
Date of Service: 09/22/1998
Report No.: 9824949
Client No.: 52617000 Project No.: 43-2452-
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppell
Belt Linl
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requir~
compressive strength samples.
SLUM~:
Am:
METHOD:
CONTanCXOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
~o, NT: 22
S~n~CnnCATION m~QUniE~
s~~: 4~ psi ~ 28 Days
3.5 - 6.5%
ASTM C- 143
AS~ C- 172
ASTM C-39
PROJECT DATA
coNcm~TE CLASS: 9351
PLACEMENT DATE: 09/22/1998
TIME SAMPLED: ll:45am BY: V
WEATHER CONDITIONS: Hot, hun~
TEMPEP~TURE (v). Am 94 F C~
TRUCK NO: 852 TICKE'
Am CONTENT (%): N/A tn~t
PLACEMENT LOCATION:
Turning lane from Beltlin¢ Road, south interse~
~IPLE LOCATION: At south radius of turning lane
UNDER MEASURED
~RKED SLUMP
SET NO. (inches)
1 1 5.50
1 2 5.50
I 3 5.50
1 4 5.50
NOTE: Air meter was not
REPORT OF TESTS
DATE
TESTED
09/29/1998
09/29/1998
10/20/1998
10/20/1998
available.
MAXIMUM
AGE LOAD
(~ys)
7 133650
7 129190
Average
28 156040
28 148920
Average
AO
Technician: Vince McManis
Report Distribution:
(1) Lincoln Property Company
(1) Butler Cous~ru~on
(1) O'Brien & Associates
( 1 ) AECC, Inc.
Started: 10:00am Finished: 12:30pm
(1) City of Coppell/Bldg. Insp.
(1) City of Coppcll/Coustr. lnsp.
(1) Mullen & Powell Teclmistructures
97
OlSS
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
10/23/1998
lusiness Center II
Rd. & Lakeshore Dr.
Texas
d field test and cast
BATCH TIME: 11:05am
[ncc McManis
id, cloudy
)NCRETE: 89 F
rNO: 75530
r WEIGHT (per): N/A
lion
~-~MULATIVEYARDS: 70
~OMPRESSIVE
STRENGTH
(p~)
4730
4570
4650
5520
5270
54OO
This ~ is exclusively for thc use of thc client indicated above, and shall not be reproduced except in full without the w~
FRACTURE
TYPE
Page 1 of 1
!ugene Harbour
Vice President
en approval of HBC Engi~
/
/