Loading...
Northlake 635(3)-LR 980930CONCRETE COMPRLt IVE ST NGTH TES Date of Service: 09/22/1998 Report No.: 9824949 Client No.: 52617000 Project No.: 43-2452-' Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell Belt Lin. Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples. SLUMP: AIR: TEST METHOD: CONTItnCTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPF. CIFICATION REQUIREblENTS STgENGTa: 4000 psi @ 28 Days 3-5" 3.5 - 6.5% ASTM C-143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 09/22/1998 T1MESAMPLED: lh45am BY: V WEATHER CONDrrIONS: Hot, hum TEM~E~,TURE 1~3- AIR 94 F C( TRUCK NO: 852 TICKE~ sIR coNTENT (%): N/A tn~r PLACEMENT LOCATION: Turning lane from Beltline Road, south intersec SAMPLE LOCATION: At south radius of turning lane REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 1 5.50 09/29/1998 1 2 5.50 09/29/1998 1 3 5.50 10/20/1998 1 4 5.50 10/20/1998 AO MAXIMUM AGE LOAD (days) (lbs. force) 7 133650 7 129190 Average 28 28 NOTE: Air meter was not available. 8901 Carpenter Frwy., Suite #100 Dallas; Texas 75247 )7 Report Date 09/30/1998 lusiness Center II Rd. & Lakeshore Dr. rexas d field test and cast BATCHTIME: 1 l:05am .nce McManis id, cloudy ,NC~ETE: 89 F :NO: 75530 r WEm~rr (pc0: N/A lioa RIMULATIVE YARDS: 70 ~OMPRESSIVE STRENGTH 4730 457O 4650 OlSS Teelmician: Vince McManis Report Distribution: (1) Lincoln Property Company (1) Butler Construction (1) O'Brien & Associates (1) AECC, Inc. Started: 10:00am Finished: 12:30pm (1) City of Coppcll/Bldg. lnsp. (1) City of Coppell/Constr. Insp. (1) Mullen & Powell Technistructures This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ~ Pa~e 1 of 1 Vice President approval of HBC Engiu~riug, Inc.