Northlake 635(3)-LR 980930CONCRETE COMPRLt IVE ST NGTH TES
Date of Service: 09/22/1998
Report No.: 9824949
Client No.: 52617000 Project No.: 43-2452-'
Client:
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project: Coppell
Belt Lin.
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform require
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTItnCTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 22
SPF. CIFICATION REQUIREblENTS
STgENGTa: 4000 psi @ 28 Days
3-5"
3.5 - 6.5%
ASTM C-143
ASTM C-172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 09/22/1998
T1MESAMPLED: lh45am BY: V
WEATHER CONDrrIONS: Hot, hum
TEM~E~,TURE 1~3- AIR 94 F C(
TRUCK NO: 852 TICKE~
sIR coNTENT (%): N/A tn~r
PLACEMENT LOCATION:
Turning lane from Beltline Road, south intersec
SAMPLE LOCATION: At south radius of turning lane
REPORT OF TESTS
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
1 1 5.50 09/29/1998
1 2 5.50 09/29/1998
1 3 5.50 10/20/1998
1 4 5.50 10/20/1998
AO
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 133650
7 129190
Average
28
28
NOTE: Air meter was not available.
8901 Carpenter Frwy., Suite #100
Dallas; Texas 75247
)7
Report Date
09/30/1998
lusiness Center II
Rd. & Lakeshore Dr.
rexas
d field test and cast
BATCHTIME: 1 l:05am
.nce McManis
id, cloudy
,NC~ETE: 89 F
:NO: 75530
r WEm~rr (pc0: N/A
lioa
RIMULATIVE YARDS: 70
~OMPRESSIVE
STRENGTH
4730
457O
4650
OlSS
Teelmician: Vince McManis
Report Distribution:
(1) Lincoln Property Company
(1) Butler Construction
(1) O'Brien & Associates
(1) AECC, Inc.
Started: 10:00am Finished: 12:30pm
(1) City of Coppcll/Bldg. lnsp.
(1) City of Coppell/Constr. Insp.
(1) Mullen & Powell Technistructures
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ~
Pa~e 1 of 1
Vice President
approval of HBC Engiu~riug, Inc.