Meadows Addn 6-CS 900111PAUL S. UNZICKER, INC.
CONSULTING ENGINEERS
8700 STEMMONS FREEWAY, SUITE 400
DALLAS, TEXAS 75247
(214) 634-3300
January 11, 1990
Ms. Shohre Daneshmand, P.E.
~it¥ of Coppell
9e~rtment of Public Works
P.O. Box 478
Coppell, Texas 75019
Re:
Meadows Section six - Phase One
Coppell, Texas
86062-0
Dear Shohre:
Per our telephone conversation this past Tuesday, plea
itemized listing of the offsite easements needed for
development. These easements were executed by the
Hinckley, for the purposes shown in the following list
1)
Five foot Utility Easement along most Northerly al
This easement was required by city Staff. Sin(
Meadows Section Six - Phase One owns the land ju
alley Right-of-Way, an easement was required j%
shown on all internal alleys (i.e. all all~
subdivision were required to have five foot util
either side of all the Right-of-Way).
2)
Drainage Easement located near Meadow Run and th,
alley of this development.
This easement should have been obtained when the
sewer system was constructed. We obtained this e~
Hinckley because the existing storm sewer systE
development feeds into crosses private property.
you review the Engineering Plans for the 10catic
sewer system.
3)
TeN foo~ Utility Easement located 223.35 feet Wet
and Pa_z~way Boulevard.
This e~sement was obtained from Mr. Hinckley for
const~hcting a Sanitary Sewer line and a Storm ~
serve~ the referenced development. It has been 1.
the center of the easement will fall on the prope
10 and 11 of Block J of the Meadows Section ~
Addition (future development). Mr. Hinckle,
studying the possible platting of this addition.
PAUL S. UNZICKER, P.E. DA~
President
;e find below an
the referenced
)wner, Mr. Glen
.ley.
:e the owner of
st to the North
~st as they are
~ys within the
.ty easements on
most Northerly
original storm
}sement from Mr.
.m in which our
I would suggest
n of this storm
~t of Meadow Run
the purposes of
~ewer line which
)cated such that
rty line of Lots
;ix - Phase Two
is currently
D M. SCHNURBUSCH, P.E.
Vice President
Ms. Shohre Daneshmand
January 11, 1990
Page 2
4)
Five foot Utility Easement located between Lots 1
J, near the intersection of Parkway Bouleva
Boulevard.
This easement was requested by TU Electric for
installing a street light in Parkway Boulevard
attached a copy of TU Electric's electrical plan J
request for this easement. If you have any qu
call Tim Brancheau with TU Electric at (214) 323-~
5)
Ten foot by ten foot Utility Easement located ne~
corner of Lot 22~ Block Jo of this development.
This easement was also requested by TU Electri
their electrical service plan for clarification.
If you have any other questions regarding these easemel
free to call.
Sincerely,
Kevin R. Kendrick, P.E.
Project Manager
KRK/bp
cc: Mr. Gordon Jones / D.T. Construction
8 and 19, Block
rd and Samuel
~he purposes of
· Please find
.ndicating their
estions, please
1910.
the Northeast
· Please see
Its, please feel
r3~UEL
~) LVD.
zz
.;/