Loading...
Meadows Addn 6-CS 891228December 28, 1989 PAUL S. UNZICKER, INC. CONSULTING rNGINEERS 8700 STEM#IONS FREEWAY, SUITE 400 DALLAS, TEXAS 75247 (214) 634-3300 Mr. Gordon Jones D.T. Construction, Inc. c/o Horton & Tomnitz, Inc. 2221 East Lamar Boulevard Suite 950, LB 43 Arlington, Texas 76006 Re: Meadows Section 6 - Phase One Coppell, Texas 86062-0 Dear Gordon: Enclosed is a copy of Coppell M.U.D. District No. l's completed in subject addition~ (their invoice number 4 number 915362.10) dated December 22, 1989. We have ch~ invoice, find it to be in order and recommend payment $28,061.93. As seen in the attached letter, payment t, due on or prior to January 5, 1989. This invoice is for 100 percent construction of the prc the retainage due to the contractor. The original cont this work was $231,720.67. The total amount of the cor approved change orders by the M.U.D. is $240,996.46. If you have any questions, please feel free to call. Sincerely, Kevin R. Kendrick, P.E. Project Manager KRK/bp cc: Jeff Hawkins, P.E. / Pierce Lunsford Associates, Chuck Young / C.W. Young PAUL S. UNZICKER, P.E. President nvoice for work nd reference cked their n the amount of the M.U.D. is .ject including .ract value for .tract including :nc. ID M. SCHNURBUSCH, P.E. Vice President COPPELL MUNICIPAL UTILITY DISTRIC 8300 DOUGLAS, SUITE 800 DALLAS, TEXAS 75225 (214) 691-9448 December 22, 1989 Re f. CF GJ Mr. Gordon D. Jones D.T. Construction, Inc. 2221 East Lamar Blvd., Suite 950 Arlington, TX 76006 Subject: Meadows Subdivision, Section 6 Water, Sanitary and Storm Drainage Improve~ Coppell M.U.D. No. 1 Coppell, Texas Dear Mr. Jones: The cost of work completed by C. W. Young Con: complete the utility project for the subject proj~ below. We will be recommending final acceptance C.W. Young at the January meeting of the Board of Coppell M.U.D. No. 1, provided the Contractor co~ punchlist items and executes the necessary closin~ Also included are engineering and legal fees for through December 15, 1989. Engineering fees inc observation and project administration costs. Please have the Owner remit the total listed belo~ Coppell M.U.D. No. 1, to Paul Phy on or before Fri, 5, 19 90 in order for the M.U.D. Board to authorize January 9th meeting. If there is any reason you call Paul Phy before January 5 at (214) 691-9448. Amount Due for period Ending December 18, 1989: C. W. Young Const. - Pay Estimate No. 4 & Final Engineering Fee- Pierce-Lunsford Associates Legal Fee Total Owner to Remit to Coppell M.U.D. #1 If I call. can be of further assistance, please do not Sincerely, PIERCE-LUNSFORD ASSOCIATES, INC. M. Hawkins, P.E. cc: Mr. Paul Phy, Coppell M.U.D. No. 1 Mr. Kevin Kendrick, Paul S. Unzicker Mr. Steve Eberhardt, Southwest Savings Associat TNO. 1 No. 915362.10 .024 ~ents ~truction to ~ct is listed ~ payment to rectors for ~pletes final documents. November 16 Jude project , Payable to ay, January ~yment at the annot do so, 26,884 67 ~ 877~26 300. oo v/ $ 28,061.93 hesitate to on PIERC;E-LUNSFORD ASSOCIA7 CONSULTING ENGINEERS Coppell M.U.D. No. 1 8300 Douglas Ave. %800 Dallas, Texas 75225 Attn: Paul W. Phy, Esq. VOUCH E~, JOB NO DATE DI CF V83~ 'ES, INC. NO. 4 AND FINAL 915362.10 C. 22, 1989 )9 GENTLEMEN: We hereby recommend that C. W. YOUNG CON: 210 S. Sixth Aw Mansfield, Texa Is entitled to payment account the following: FOR: Water, Sanitary Sewer and Storm Drainage Impro, the Meadows Subdivision, Section 6 in Coppell, COMPENSATION: Work performed through December 18, 1' CC: TOTAL AMOUNT EARNED Project is 100% complete. $ 240, C.W. Young Const., Inc. D.T. Construction, Inc. Paul S. Unzicker Engs. Southwest Savings Assoc. TOTAL ............ 0% RETAINED .... BALANCE .......... PREVIOUS ESTIMATE AMOUNT DUE: Twenty-Six Thousand Eight Hundred Eighty-Four and 67/100 Dollars ~TRUCTION, INC. 76063 zements to Serve Texas. 89: 96.46 .$ 240,996.46 .$ .$ 240,996.46 :.$ 214,111.79 $ 26,884.67 BY 3109 CARLISL E, SUITE 206 DALI AS, TEXAS 75204 (2t 4) t~71 2126 3901 PIONEER PARKWAY, SUITE 100 ARLINGTON, TEXAS 76013 (817) 461-5868 Melro CONTRACTOR: CF 15362E remove temporary detour following waterline const! 2. Remove and lower existing 8" waterline along the Samuel Blvd. to allow for the installation of t 30" R.C.P. on Line "D-i" at Sta 18+58. Ti waterline was shown on design plans to be belo~ sewer at the.proposed crossing, but found to be when exposed in the field. Conflict required low4 water main including installation of 4-45 de, restrainer glands, and extra fittings. CHANGE IN CONTRACT AMOUNT: The change in Contract Amount for Change fol lows: L//1. Temporary Traffic Detour A. Furnish and Place 196.38 Ton Flexible Base @ $16.00/Ton Order B. Furnish and Maintain 14 Ea. Barracades @ $.50/Day/Ea. x 38 Days '~/2. Lower Existing Waterline A. Lower 8" Waterline Including Fittings 1 L.S. @ $1,750.00 (per Contractor's Letter dated October 12, 1989 Original Contract Amount Revised Contract Amount ~uction. ~ast side of proposed existing the storm in conflict ~rinG of the ree bends, No. 1 is as $ 3,142.08 /'' 266.00 .i, 750.00 $ 5,158.08 236,878.15 Change Order No. 1 Water, Sanitary Sewer dnd Storm Drainage Improvement6 Meadows Subdivision, Section 6 Coppell Municipal Utility D~strict No. 1 Coppell, Texas C.W. Young Construction, Inc. 210 South Sixth Mansfield, Texas 76063 DESCRIPTION AND JUSTIFICATION FOR CHANGE: 1. Furnish and place 6" Flexible Base (Grade N¢~. 2), for approximately 500 L.F. temporary traffic detour 9~lonG Samuel Boulevard during installation of 8" waterline|connectio~s under existing street. Temporary detour includin~ a~ditional Darracadlng of street was requlred by City ~of Coppell officials to prevent road closing, per Temporary Trafflc Detour Plan deslgned by Paul S. Unzicker. Co~tractor to Change Order No. 1 Water, Sanitary Sewer and Storm Drainage Improv, Meadows Subdivision, Section 6 Coppell Munlclpal Utlllty District No. 1 Coppell, Texas Page 2 CHANGE IN CONTRACT TIME: Ihe Contcact T~me Ks extended 3 working days beyond t 30 working day contract limitation. RECOMMENDED BY: PIERCE-LUNSFORD ASSOCIATES, INC. J~'ey ~. Hawkins, P.E. APPROVED BY: COPPELL MUNICIPAL UTILITY DISTRICT NO. 1 ~. Lawrence Martin, President ACCEPTED BY: C.W. YOUNG CONSTRUCTION, INC. ~__ _~.~_ 2~._~_ ~__~_ ~:_--;-5-- Chuck Young ,ments original Da te Jz_'_ ':_(£.__ Da te D(~te October 20 Item No. Description COPPELL M.U.D. NO. 1 MEADOWS 6 WATER, SANITARY SEWER & DRAINAGE IMPROVEMENTS CONTRACTOR: C.W. YOUNG CONSTRUCTION, INC. , 1989 To December 18, , 1989 Contract Amount $231,720.07 Contract Quantity Quantity Unit Quantity Completed Completed Unit Price To Date This Period Fay Estimate No. 4 ~NpF/NAA CF PEPKVA Amount Amount Completed Completed This Billing To Date UNIT I - WATER SYST~-M IMPROVLMENTS 1 8" Water Pipe 2720 2765/ -0- L.F. 10.65 2 8" Gate Valves 7 7 / -0- Ea. 400.00 3 6" Gate Valves 6 6w/ -0- Ea. 300.00 4 1" Water Services 51 51~ 20I~$! Ea. 247.00 5 1" Water Services to exist. 19 19w' 20% 0%~ Ea. 255.53 main 6 Cast Iron Fittings 1.9 1.9w'' -0- TN. 2000.00 7 Concrete Blocking 5.0 5.0w~ .. -0- C.Y. 45.00 8 Connections to Exist. Mains 2 2 ~'' -0- Ea. 250.00 9 System Test I I ~ -0- L.S. 250.00 10 Fire Hydrants 6 6 ~z' -0- Ea. 700.00 Il 12" x 8" Tapping Sleeve & 2 2 ~/ -0- Ea. 1500.00 Valve 12 Sawcut, removal & replacement 36 40 ~ -0- S.Y. 53.00 of 6" 13, Extra Pay of Labor Due to Water line ......... not shown . w' LS~ 1500.001~ nn · ~ ~/ex. Uase uetou~ Kd.. i~2 F.~ -7200 16 -Lower existing 8" wt-r line I I / -0- LS 1750.00 TOTAL UNIT I WATER SYSTEM IMPROVL~iENTS 29467.25/ -0- 2800.00/ -0- 1800.00/ -0- 12597.00/ 2519.40/ 4855.07/ 971.01~/ 3800.00~/ -0- 225.00/ -0- 500.00/ -0- 250.00/' -0- 4200.00v/ -0- 3000.00 w" -o- 2i20.00/ -0- ~lA~ fir ~ =O-- 26[~UU ~ -u- 17~%.00w/ -U- S 70,752.40/ $ 3,490.41/ October 20, COPPELL H.U.D. NO. 1 MEADOWS 6 WATER, SANITARY SEWER & DRAINAGE IMi~ROVEMENTS CONTRACTOR: C.W. YOUNG CONSTRUCTION, 1NC. , 1989 TO ~r~or IR: , 1989 Contract A~ount $231,720.07 Item Contract No. Description Quantity Quantity Quantity Unit Completed Completed Unit Price To Date This Period Amount Completed To Date Pay Estimate No. __ CF PEPKV& ~ount Completed This Billing UNIT II - SANITARY SEWER IIiPROVEMENTS I 4' Std Dia. Hanhole 8 2 4' Dia. Drop ~anhole 1 3 Cleanouts 5 4 8" Sewer Pipe 3097 5 &" Sewer Services 69 6 4" Sewer Services to exist, i mains 7 Connections to exist, mains 1 8 Concrete Encasement 106 9 System Test 1 10 Television Inspection 3097 I1 Trench Safety System 3097 12 13 ~'v" -0- Ea. 1195.00 2~ -0- Ea. 1230.00 5 -0- Ea. 200.00 3097 -0- L.F. 13.50 70 V' -0- Ea. 130.32 0 -0- Ea. 180.00 I -0- Ea~ &O0.O0 106 -0- L.F. 10.00 1 -0- L.S. 300.00 3097 -O- L.F. .75 3097 -0- L.£. .30 -0- V.F. 90.00 -0- L.F. 2.00 Extra depth for H.M. on "S-l" 3 ~/ Extra depth added for sewer line on "S-l" 150 2460.00 -0- 1000.00 -0- 41809.50~/ -0- 9122.40 -0- -0- -0- 400.00/. -0- i060.00~ -0- 300.00 -0- 2322.75 -0- 929.10 -0- 270.009 -0- 300.00 -0- / TOTAL t~IT II - SANITARY SEg~R IMPROVEMENTS COPPELL M.U.D. NO. 1 MEADOWS 6 WATER, S~NITARY SEWER & DRAINAGE IHPROVEHENTS CONTRACTOR: C.W. YOUNG CONSTRUCTION, INC. · 1989 To np~.mh~r 1R: , 1989 Contract Amount $231,720.07 Item Contract No. Description Quantity Quantity Quantity Unit Completed Completed Unit Price To Date This Period Pay Estimate No. ~ ~2. CF PEPKVA Amount Amount Completed Completed This Billing To Date UNIT III - DRAINAGE FACILITIES 1 42" Cl. 3 RCP 2 36" Cl. 3 RCP 3 33" Cl. 3 RCP & 33" Cl. 4 RCP ~5 30" Cl. 3 RCP ~< 6 30" Cl. 4 RCP 7 24" Cl. 3 RCP ~8 Wye Connection 9 Std 2 Grate Inlet 10 10' Curb Inlet 11 I0' Recessed Inlet /,~12 14' Recessed Inlet 13 8' Recessed Inlet 14 5' Recessed Inlet 15 16 Remove Plug & Connect to exist, sewer pipe Type "B" Storm Sewer Manhole 514 437 517 25 190 50 190 11 3 1 1 2 1 4 526 437~' 517 25 ( ?~'5 ~ 190 c.?, ( ~ ) 50 190 ,.~, 11~ 3 1 1 . ~ 1 -O- ~of 3 ~of2 ½of6 ~0~ 17 Trench Safety System 1923 1923-- -0- ~ 18 · 6' Curb Inlet & connect to exist inlet & remove & replace curb & gutter TOTAL UNIT III - DRAINAGE FACILITIES ...... $~ -O- L.F. 45.29 L.F. 37.00 16169.00 ~ -0- L.F. 33.28 17205.76 ~ -0- L.F. 37.49 937.25 / -0- L.~. 28.26 5369.40 ~ L.F. [37,~j 31.41 ~gTeg1570.50~ -O- L.F. 24.69 4691.10 ~ -0- ~. 100. O0 ~00.00 / -0- ~. 2200.00 66~.00 3300.00 Ea. 1750. O0 1750.00 875. O0 Ea. 1750.00 1750.00 / 875.00 ~. 2100. O0 ~0' O0 2100. O0 ~ i~0.00 i~50.00 775.00 ~. 1350. O0 5400. O0 ~ 2700. O0 ~. 200. O0 200.00 -0- ~. 1575. O0 6300.00 -O- L.F. ~'~ .50 961.50/ -O- LS ~ ~ ) 2600.00 .2600'00 . - COPPELL M.U.D. NO. 1 MEADOWS 6 WATER, SANITARY SEWER & DRAINAGE IMPROVFMENTS CONTRACTOR: C.W. YOUNG CONSTRUCTION, INC. )~: , 1989 To Der~mh~r 1R: , 1989 Contract Amount $231,720.07 Pay Estimate No. CF PEPKVA Checked by: PIERCE-LUNSFORD ASSOCIATES Brad Williams Prepared by: C.W. YOUNG CONSTRUCTION, INC. Subtotal - ,Materials Stored on Site (Copy of Invoice from Supplier Must be Attached), Subtotal - Amount Work Completed This Billing Subtotal - Amount Work Completed Prior to This Billing Total Amount Completed to Date & Materials on Site Less 10% Retainage Total Due to Date From ,MUD Less Previous Payments From MUD Amount Due This Estimate From MUD Recommended for Payment: PIERCE-LUNSFORD ASSOCIATES, INC. !z- zz-f? -0- -0- 214,111.79