Loading...
Meadows Addn 6-CS 891220COPPELL PUBLIC WORKS December 20, 1989 HE: Larry Davis, Construction Inspector Howard Pafford, Water Utilities Superinte~ Final Utility Walk Through for Meadows Ph~ Utility Crewleader Ted Dutt performed a final utilit on the above referenced project on December 18, and' following items to be deficient. 1. Samuel Blvd.and Marlee-Need 2' x 2' Concrete me Se e Stack Marlee Drive- Lot I of Box Marlee Drive- Lot 2 of Box Marlee Drive- Lot 25 Wall of Box Marlee Drive- Lot 28 Wall of Box Marlee Drive- Lot 32 Wall of Box Sra. 4 + 41 - Line S-1 Alendale- Lot 7 Box Alendale- Lot 7 Woodmor Drive- Lot 17 Wall of Box Sta. 1 + 25 - Line S-6 Reset Meter Box, Cut Off to Reset Meter Box, Cut Off to Reset Meter Box, Cut Off Reset Meter Box, Cut Off Reset Meter Box, Cut Oi Regrout Manhole Ring Reset Meter Box, Cut Off to Cl Repair Main Line Valve Stack Reset Meter Box, Cut O~ 2dent ~ ~se VI ~ walk through has found the Pad on Valve Close to Wall Close to Wall to Close to to Close to ~ to close to 9se to Wall of ~nd Pad ~ to Close to 11. Need Lid on Clean Out 12. 13. 14. 15. 16. 17. 18. Sta. 7 + 21 - Line $-1 Manhole Invert Sta. 4 + O0 - Line S-1 Sta. 3 + 50 - Line S-4 Sta. 7 + 05 - Line S-3 Regrout Manhole Ring Regrout Manhole Ring Regrout Manhole Ring Cut Pavement in Alley a Out, so that sewer pipe can be capped Sta. 4 + O0 - Line S-3 Sta. i + 43 - Line S-1 Sta. 18 + 28 - Line S-1 Regrout Manhole Ring Regrout Manhole Ring Regrout Manhole Ring Ail of the above referenced items will need to be a~ to final acceptance of this project. If you have any questions regarding this matter, pl~ HLP/bb xc: Steve Goram, Director of Public Works MEADOWS 6. HLP and Clean Out Reset Clean ~dressed prior ~ase advise.